Quality Engineering - Assignment

Added on - 21 Apr 2020

  • 4

    pages

  • 412

    words

  • 11

    views

  • 0

    downloads

Showing pages 1 to 2 of 4 pages
Running Head: QUALITY ENGINEERINGQUALITY ASSURANCE AND MAINTENANCE PROCEDURESNameProfessorInstitutionCourseDate
QUALITY ENGINEERING2Work quality control maintenanceThis program of training was conducted in seven hours in a day.It was on maintenanceof equipment repair work quality assurance and also conformance. It also covers the latestoperating procedures in maintaining the operating procedures which contain activities for qualityassurance meant to ensure processes giving birth to high quality products and performance too.The trainees were educated on the best practice quality management methods[CITATION Ven14 \l1033 ].THE CONTENT OF THE TRAINING SESSIONMorning-quality control principles – here, the necessary requirements for the bestquality control systems were covered[ CITATION Mar12 \l 1033 ]. The purpose of this was toprovidea basis of information and the correct comprehension on what a good body is in a welloperating control system.After Morning breakFailure mode effect analysis- the FMEA was involved in the identification of a failureand to know what had to be employed to have them corrected. This involved doing work in aprocess that is simulated and has poor quality control performance. The simulation was done bya group of 5 individuals and they were meant to identify the problems then analyze them afterrecording them[ CITATION Mar12 \l 1033 ].After lunch
desklib-logo
You’re reading a preview
card-image

To View Complete Document

Become a Desklib Library Member.
Subscribe to our plans

Download This Document