This article discusses the importance of quality planning in each phase of product lifecycle. It explains why quality inputs and outputs are necessary in each phase and the risks of not carrying out each phase properly. The risks include defective and unaffordable product, misbalanced budget, uninterested employees, change in plan, defective product, and misguidance regarding quality. The article provides references for further reading.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: QUALITY PLANNING IN PRODUCT LIFECYCLE
QUALITY PLANNING IN PRODUCT LIFECYCLE
Name of Student
Name of University
Author’s Note
QUALITY PLANNING IN PRODUCT LIFECYCLE
Name of Student
Name of University
Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1QUALITY PLANNING IN PRODUCT LIFECYCLE
Answer 4
Quality input as well as outputs is necessary for completing each activity for the phases
because any organization should concentrate on quality before quantity especially the
organizations that are organization based. Customers follow the same rule, they inspect the
quality of a product or service before making use of it. If the quality is not up to the mark,
quantity would be of no use (Beckford2016). If an organization provides quality inputs as well as
outputs but the quantity is less, it would be worth it, because the organization does not ignore the
fact that quality is more important and if an organization provides abundant quantity of inputs
and outputs and the quality is not up to the mark, the customers would not be satisfies with it.
Quality is considered as an important aspect for completing each activity because the process of
a product manufacturing there are numerous phases that the company has to go through. The
phases include proposal-conception phase input and output, feasibility phase inputs and outputs,
implementation phase inputs and outputs, execution-operation phase input and output,
finalization and closedown input and output (Cassidy2016). All the phases should be carried out
with extremely good quality.
The reasons why quality input and outputs are necessary in every phase mentioned above
are as follows
Quality inputs and outputs are necessary in proposal phase because in this phase th entire
project is proposed and present in front of directors or managers who would agree on the
proposal. In this phase the equipment’s needed for completing the project is described along with
its quality and quantity (Colledani, Tolio and Fischer 2014). If the basic things needed to execute
the project are not of high quality the output would never be of good quality and if the
Answer 4
Quality input as well as outputs is necessary for completing each activity for the phases
because any organization should concentrate on quality before quantity especially the
organizations that are organization based. Customers follow the same rule, they inspect the
quality of a product or service before making use of it. If the quality is not up to the mark,
quantity would be of no use (Beckford2016). If an organization provides quality inputs as well as
outputs but the quantity is less, it would be worth it, because the organization does not ignore the
fact that quality is more important and if an organization provides abundant quantity of inputs
and outputs and the quality is not up to the mark, the customers would not be satisfies with it.
Quality is considered as an important aspect for completing each activity because the process of
a product manufacturing there are numerous phases that the company has to go through. The
phases include proposal-conception phase input and output, feasibility phase inputs and outputs,
implementation phase inputs and outputs, execution-operation phase input and output,
finalization and closedown input and output (Cassidy2016). All the phases should be carried out
with extremely good quality.
The reasons why quality input and outputs are necessary in every phase mentioned above
are as follows
Quality inputs and outputs are necessary in proposal phase because in this phase th entire
project is proposed and present in front of directors or managers who would agree on the
proposal. In this phase the equipment’s needed for completing the project is described along with
its quality and quantity (Colledani, Tolio and Fischer 2014). If the basic things needed to execute
the project are not of high quality the output would never be of good quality and if the
2QUALITY PLANNING IN PRODUCT LIFECYCLE
equipment’s utilized are of very high quality, the output would be automatically good. In this
phase the business requirements are outlined along with their proposed solutions that would
solve the company needs as well as objectives (El Kadiri and Kiritsis2015). As a result quality
matters when a project has to be proposed.
In the next phase called feasibility phase, an analysis has been carried out that is used in
measuring the likelihood as well as the ability to complete a certain project successfully along
with all the relevant factors. This analysis has to be carried out using the high quality inputs that
would be helpful for the organization (Franceschini2016). This phase accounts for factors which
affect it like technological, economic, scheduling factors and legal factors. Hence the analysis
has to be carried out using high quality resources. This is because various project managers make
use of the feasibility study for determining potential positive as well as negative outcomes of the
project. This can be done before even initialization of the project. As a result, the feasibility
phase requires high quality input and outputs because all the other phases are dependent on the
result of this phase.
In implementation phase, the automated application or system or any other IT solution is
shifted from development stage to production stage. In this phase, the products are actually made
ready for implementation process and the phase of implementation starts (Govindan,
Soleimaniand Kannan2015). The preparation for carrying out the project is taken under this
phase. The quality of materials is very important in this phase because if the quality of materials
used in the implementation process is not up to the mark the outputs after the implementation
phase would be of low quality and those outputs will be forwarded to the execution phase. In this
case the quality of materials could not be changed in the execution process because the project
has already started in the implementation phase. Hence the quality of inputs and outputs are very
equipment’s utilized are of very high quality, the output would be automatically good. In this
phase the business requirements are outlined along with their proposed solutions that would
solve the company needs as well as objectives (El Kadiri and Kiritsis2015). As a result quality
matters when a project has to be proposed.
In the next phase called feasibility phase, an analysis has been carried out that is used in
measuring the likelihood as well as the ability to complete a certain project successfully along
with all the relevant factors. This analysis has to be carried out using the high quality inputs that
would be helpful for the organization (Franceschini2016). This phase accounts for factors which
affect it like technological, economic, scheduling factors and legal factors. Hence the analysis
has to be carried out using high quality resources. This is because various project managers make
use of the feasibility study for determining potential positive as well as negative outcomes of the
project. This can be done before even initialization of the project. As a result, the feasibility
phase requires high quality input and outputs because all the other phases are dependent on the
result of this phase.
In implementation phase, the automated application or system or any other IT solution is
shifted from development stage to production stage. In this phase, the products are actually made
ready for implementation process and the phase of implementation starts (Govindan,
Soleimaniand Kannan2015). The preparation for carrying out the project is taken under this
phase. The quality of materials is very important in this phase because if the quality of materials
used in the implementation process is not up to the mark the outputs after the implementation
phase would be of low quality and those outputs will be forwarded to the execution phase. In this
case the quality of materials could not be changed in the execution process because the project
has already started in the implementation phase. Hence the quality of inputs and outputs are very
3QUALITY PLANNING IN PRODUCT LIFECYCLE
vital for this phase of the project. The control as well as communication that is required in this
stage should have clarity and a very clear communication channel should be followed for the
purpose of communication (Kaplanand Atkinson2015). Progress in this stage is monitored
continuously, as a result the quality of input should be high for the implementation phase.
Execution phase is the most important phase of any project. In this phase the products are
manufactured, the products are introduced in the market, servicing of products is carried out,
monitoring of the service provided by the products are done in this phase, in case any
modification or development has to be done, it is proposed in this particular phase (Kerzner and
Kerzner2017). The development is also carries out at the end of this phase. The input of this
phase has to be of high quality, not only the resources used in manufacturing the product should
be good but the entire process of execution should be done without any error. Suppose the
organization has use high quality resources for manufacturing the products bur there has been
some issues in the development phase, now if the monitoring part of the processes is not done
properly, the organization might face some problems.
The monitoring part of this phase is one of the most important part in the overall process.
This part ensures that the entire process is carried out properly without any error. In case the
monitoring is not carried out properly, any loophole in the process would not be identified and
rectified, this might lead to a defective product getting launched in the market and people would
be dissatisfied with the performance of the product (Klochkov, Odinokov and Klochkova 2016).
Monitoring not only ensures that the process is carried out properly, it also help the organization
understand the demands of customers.Hence along with the resources and materials used for
manufacturing the product, monitoring and identifying the defects in the products should be
provided with rich quality inputs.
vital for this phase of the project. The control as well as communication that is required in this
stage should have clarity and a very clear communication channel should be followed for the
purpose of communication (Kaplanand Atkinson2015). Progress in this stage is monitored
continuously, as a result the quality of input should be high for the implementation phase.
Execution phase is the most important phase of any project. In this phase the products are
manufactured, the products are introduced in the market, servicing of products is carried out,
monitoring of the service provided by the products are done in this phase, in case any
modification or development has to be done, it is proposed in this particular phase (Kerzner and
Kerzner2017). The development is also carries out at the end of this phase. The input of this
phase has to be of high quality, not only the resources used in manufacturing the product should
be good but the entire process of execution should be done without any error. Suppose the
organization has use high quality resources for manufacturing the products bur there has been
some issues in the development phase, now if the monitoring part of the processes is not done
properly, the organization might face some problems.
The monitoring part of this phase is one of the most important part in the overall process.
This part ensures that the entire process is carried out properly without any error. In case the
monitoring is not carried out properly, any loophole in the process would not be identified and
rectified, this might lead to a defective product getting launched in the market and people would
be dissatisfied with the performance of the product (Klochkov, Odinokov and Klochkova 2016).
Monitoring not only ensures that the process is carried out properly, it also help the organization
understand the demands of customers.Hence along with the resources and materials used for
manufacturing the product, monitoring and identifying the defects in the products should be
provided with rich quality inputs.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4QUALITY PLANNING IN PRODUCT LIFECYCLE
The finalization and closedown activities include the processes where products are ready
to launch in the market. The project the reviewed in this stage. Here the review of the product
should be carried out with utmost concern considering that the product is made of every level of
customer, it should also be kept in mind that different category and generation of people have
different demands, the product must be able to meet up to the demands of the people. This
should always be kept in mind that the expectations that have been listed from the product are
similar to the outcomes (Nayakand Padhye2015). This phase requires numerous consideration
that are important, ignoring a single aspect might lead to the product downfall. The success of
the project is reviewed, this reviewing is to be done with experts in this field, and they would be
able to understand if the deliverable of the product matches the planning of the product. Hence
the quality of output is dependent on the quality of inputs provided.
Answer 5
The risks that might take place in the organization if all the phases are not carried out
properly are as follows
Proposal-conception phase- defective and unaffordable product: in this phase
the entire plan of the product manufacturing is proposed. The planning has to full
proof, a single problem in the designing or planning of the processes might lead to
a misled manufacturing of the product. Suppose in the planning of a product
something as been wrongly designed, this might mislead the workers and produce
a product which would be defective due to the error in its design (Ondemirand
Gupta2014). This would also result in a wrong product in the market and this as a
result would worsen the image of the company. The company can also end up
The finalization and closedown activities include the processes where products are ready
to launch in the market. The project the reviewed in this stage. Here the review of the product
should be carried out with utmost concern considering that the product is made of every level of
customer, it should also be kept in mind that different category and generation of people have
different demands, the product must be able to meet up to the demands of the people. This
should always be kept in mind that the expectations that have been listed from the product are
similar to the outcomes (Nayakand Padhye2015). This phase requires numerous consideration
that are important, ignoring a single aspect might lead to the product downfall. The success of
the project is reviewed, this reviewing is to be done with experts in this field, and they would be
able to understand if the deliverable of the product matches the planning of the product. Hence
the quality of output is dependent on the quality of inputs provided.
Answer 5
The risks that might take place in the organization if all the phases are not carried out
properly are as follows
Proposal-conception phase- defective and unaffordable product: in this phase
the entire plan of the product manufacturing is proposed. The planning has to full
proof, a single problem in the designing or planning of the processes might lead to
a misled manufacturing of the product. Suppose in the planning of a product
something as been wrongly designed, this might mislead the workers and produce
a product which would be defective due to the error in its design (Ondemirand
Gupta2014). This would also result in a wrong product in the market and this as a
result would worsen the image of the company. The company can also end up
5QUALITY PLANNING IN PRODUCT LIFECYCLE
losing customer base. The budget and cost required are also proposed in this
phase. This is one of the most important parts in the overall project. The
preparation of budget has to be done with utmost care and keeping in mind all the
aspects of the project. In case the price of the final product is set so high that
would be unaffordable by everyone. This would result in a loss to the company.
Feasibility- misbalanced budget: in this stage an extensive market research is
carried out, a basic mistake in this phase might produce wrong results and it might
mis-guide the entire project. This stage also studies reading the fact that if the
product can be delivered within the provided time as well as within the decided
budget. Mistake in calculation of the project would cause a great blunder in the
entire process (Ptakand Schragenheim2016). The exceeding of budget would
result in further problems for the organization. Misbalanced budget causes
overflow of cost incurred in the entire project and the deadline of the project
might exceed as well. This phase also looks after regarding the man power
available for the project. The absenteeism of man power can also cause a problem
for the project. In case 20% of workers stay absent at different dates, the project is
delayed to some extent because their part in the project is overdue and it is
continued when the employee is present next. As a result absenteeism of
manpower is also a major problem in the project.
Implementation- uninterested employees: implementation is a phase of the
project which requires a clear channel of communication among the members of
the project. In case the communication channel has any barrier, it might prove to
be an issue for the company. In this phase the progress is reported to people using
losing customer base. The budget and cost required are also proposed in this
phase. This is one of the most important parts in the overall project. The
preparation of budget has to be done with utmost care and keeping in mind all the
aspects of the project. In case the price of the final product is set so high that
would be unaffordable by everyone. This would result in a loss to the company.
Feasibility- misbalanced budget: in this stage an extensive market research is
carried out, a basic mistake in this phase might produce wrong results and it might
mis-guide the entire project. This stage also studies reading the fact that if the
product can be delivered within the provided time as well as within the decided
budget. Mistake in calculation of the project would cause a great blunder in the
entire process (Ptakand Schragenheim2016). The exceeding of budget would
result in further problems for the organization. Misbalanced budget causes
overflow of cost incurred in the entire project and the deadline of the project
might exceed as well. This phase also looks after regarding the man power
available for the project. The absenteeism of man power can also cause a problem
for the project. In case 20% of workers stay absent at different dates, the project is
delayed to some extent because their part in the project is overdue and it is
continued when the employee is present next. As a result absenteeism of
manpower is also a major problem in the project.
Implementation- uninterested employees: implementation is a phase of the
project which requires a clear channel of communication among the members of
the project. In case the communication channel has any barrier, it might prove to
be an issue for the company. In this phase the progress is reported to people using
6QUALITY PLANNING IN PRODUCT LIFECYCLE
regular team meetings between the members (Ross2017). If the team meetings are
delayed and the members are not reported regarding the delay or progress of the
project, members might feel unwanted and hence they might lose their interest in
working and contributing in the project.
Execution- change in plan, defective product: The execution phase of a product
can also make a company face numerous problems. The major problem might be
sudden disappearance of stakeholders. This might completely break the chain of
communication and put a break into the entire process. Sometimes when the
product is already in the execution phase, stakeholders change their demands
claiming that they were not new and already mentioned in the documentation.
This might be a huge problem for the company, they might need to stop the
process in the middle and start it from the beginning in order to fulfill the
demands of the stakeholders (Tao, Cheng and Zhang 2017). In some cases
stakeholders are requested to adjust with their demands but if they do not get
convinced, the company would have to start the entire process. This also creates
an effect on the budget and deadline that was decided for the product.
Finalization and closure- misguidance regarding quality: in this phase, the
products are completely ready and the company makes preparations for the
launching of the products. In this phase, the customer satisfaction is analyzed. In
case the company does not receive feedbacks and analyze if the customers were
satisfied with the products, the company would be misguided regarding the
quality of product, they would not be able to understand if customers want more
products like that or they do not want such products.
regular team meetings between the members (Ross2017). If the team meetings are
delayed and the members are not reported regarding the delay or progress of the
project, members might feel unwanted and hence they might lose their interest in
working and contributing in the project.
Execution- change in plan, defective product: The execution phase of a product
can also make a company face numerous problems. The major problem might be
sudden disappearance of stakeholders. This might completely break the chain of
communication and put a break into the entire process. Sometimes when the
product is already in the execution phase, stakeholders change their demands
claiming that they were not new and already mentioned in the documentation.
This might be a huge problem for the company, they might need to stop the
process in the middle and start it from the beginning in order to fulfill the
demands of the stakeholders (Tao, Cheng and Zhang 2017). In some cases
stakeholders are requested to adjust with their demands but if they do not get
convinced, the company would have to start the entire process. This also creates
an effect on the budget and deadline that was decided for the product.
Finalization and closure- misguidance regarding quality: in this phase, the
products are completely ready and the company makes preparations for the
launching of the products. In this phase, the customer satisfaction is analyzed. In
case the company does not receive feedbacks and analyze if the customers were
satisfied with the products, the company would be misguided regarding the
quality of product, they would not be able to understand if customers want more
products like that or they do not want such products.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7QUALITY PLANNING IN PRODUCT LIFECYCLE
References
Beckford, J., 2016. Quality: A critical introduction. Routledge.
Cassidy, A., 2016. A practical guide to information systems strategic planning. Auerbach
Publications.
Colledani, M., Tolio, T., Fischer, A., Iung, B., Lanza, G., Schmitt, R. and Váncza, J., 2014.
Design and management of manufacturing systems for production quality. CIRP Annals-
Manufacturing Technology, 63(2), pp.773-796.
El Kadiri, S. and Kiritsis, D., 2015. Ontologies in the context of product lifecycle management:
state of the art literature review. International Journal of Production Research, 53(18), pp.5657-
5668.
Franceschini, F., 2016. Advanced quality function deployment. CRC Press.
Govindan, K., Soleimani, H. and Kannan, D., 2015. Reverse logistics and closed-loop supply
chain: A comprehensive review to explore the future. European Journal of Operational
Research, 240(3), pp.603-626.
Kaplan, R.S. and Atkinson, A.A., 2015. Advanced management accounting. PHI Learning.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Klochkov, Y., Odinokov, S., Klochkova, E., Ostapenko, M. and Volgina, A., 2016, September.
Development of certification model. In Reliability, Infocom Technologies and Optimization
References
Beckford, J., 2016. Quality: A critical introduction. Routledge.
Cassidy, A., 2016. A practical guide to information systems strategic planning. Auerbach
Publications.
Colledani, M., Tolio, T., Fischer, A., Iung, B., Lanza, G., Schmitt, R. and Váncza, J., 2014.
Design and management of manufacturing systems for production quality. CIRP Annals-
Manufacturing Technology, 63(2), pp.773-796.
El Kadiri, S. and Kiritsis, D., 2015. Ontologies in the context of product lifecycle management:
state of the art literature review. International Journal of Production Research, 53(18), pp.5657-
5668.
Franceschini, F., 2016. Advanced quality function deployment. CRC Press.
Govindan, K., Soleimani, H. and Kannan, D., 2015. Reverse logistics and closed-loop supply
chain: A comprehensive review to explore the future. European Journal of Operational
Research, 240(3), pp.603-626.
Kaplan, R.S. and Atkinson, A.A., 2015. Advanced management accounting. PHI Learning.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Klochkov, Y., Odinokov, S., Klochkova, E., Ostapenko, M. and Volgina, A., 2016, September.
Development of certification model. In Reliability, Infocom Technologies and Optimization
8QUALITY PLANNING IN PRODUCT LIFECYCLE
(Trends and Future Directions)(ICRITO), 2016 5th International Conference on (pp. 120-122).
IEEE.
Nayak, R. and Padhye, R. eds., 2015. Garment manufacturing technology. Elsevier.
Ondemir, O. and Gupta, S.M., 2014. Quality management in product recovery using the Internet
of Things: An optimization approach. Computers in Industry, 65(3), pp.491-504.
Ptak, C.A. and Schragenheim, E., 2016. ERP: tools, techniques, and applications for integrating
the supply chain. Crc Press.
Ross, J.E., 2017. Total quality management: Text, cases, and readings. Routledge.
Tao, F., Cheng, Y., Zhang, L. and Nee, A.Y., 2017. Advanced manufacturing systems:
socialization characteristics and trends. Journal of Intelligent Manufacturing, 28(5), pp.1079-
1094.
(Trends and Future Directions)(ICRITO), 2016 5th International Conference on (pp. 120-122).
IEEE.
Nayak, R. and Padhye, R. eds., 2015. Garment manufacturing technology. Elsevier.
Ondemir, O. and Gupta, S.M., 2014. Quality management in product recovery using the Internet
of Things: An optimization approach. Computers in Industry, 65(3), pp.491-504.
Ptak, C.A. and Schragenheim, E., 2016. ERP: tools, techniques, and applications for integrating
the supply chain. Crc Press.
Ross, J.E., 2017. Total quality management: Text, cases, and readings. Routledge.
Tao, F., Cheng, Y., Zhang, L. and Nee, A.Y., 2017. Advanced manufacturing systems:
socialization characteristics and trends. Journal of Intelligent Manufacturing, 28(5), pp.1079-
1094.
1 out of 9
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.