Reflective Essay on Project Management: A Personal Experience

Verified

Added on  2020/07/23

|8
|2293
|166
Report
AI Summary
This reflective essay details a student's experience in managing a construction project, specifically the renovation of an old farmhouse. The essay begins with an introduction to reflection and its importance in personal and professional development, followed by a description of the project, including its objectives, scope, and budget. The main body of the essay evaluates the project's key aspects, such as cost, time, scope, and risk management. The student discusses the strategies and techniques employed, including the use of activity-based costing and Gantt charts. The essay also analyzes the project using the 'R' framework (Reporting, Responding, Relating, and Reasoning) to highlight the lessons learned and the skills developed. The student reflects on the challenges faced, such as time management, and concludes by emphasizing the significance of project management principles in achieving successful outcomes. The essay references several project management literature to support the analysis and discussion of the project.
Document Page
Reflective Essay -
Project Management
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
INTRODUCTION...........................................................................................................................1
Main Body......................................................................................................................................1
Description of the event and scenario.........................................................................................1
Evaluation of the event and scenario..........................................................................................2
Analysis of the event and scenario..............................................................................................4
REFERENCES................................................................................................................................6
Document Page
INTRODUCTION
Reflection refers to the individual experience and inner processes of thinking and feeling.
While any individual suffers from any moment and circumstances then they will defiantly learn
something new which reflect from their personality. Reflection is a picture that individual can
find in a mirror and in the water. While any individual interface with something and face any
circumstance then they may impact from that circumstance or individual. While singular face
any circumstance then they may gain some new useful knowledge from their experience.
Intelligent reasoning and composing is vital piece of the individual advancement. Singular
capacity to think about the experience and learning will help individual in enhancing different
part of identity and demonstrable skill. The present report is based on the individual experience
regarding the project management. This report explains that how an individual manage the
project regarding construction and how prepare a systematic budget for it.
Main Body
Description of the event and scenario
Project Management is an uncommon business thought for sensible masterminds, sorted
out arranging and meticulous experts. Each business association is having its own set
destinations and objectives. To accomplish it or fruitful consummation of those objectives, it
winds up vital to make a cautious arranging, administration of the assets and its association. This
all can be accomplished with the utilization of task administration. It is an exceptionally valuable
strategy that concentrations over consummation of the work with viable and ideal usage of
assets, for example, time, fund, innovation and so forth (Wu and Low, 2010). While any project
manager develops the project then it is very important to focus on the several aspects that will
assists them in accomplishing the project. It is very important for project manager to focus on the
several aspects like cost, time, communication, scope, risk etc of the project so as appropriate
result can obtain of the project and it will effectively accomplish on the time.
As per the given case scenario, I have visited the site and made an inspection. The house
needs a great deal of repair work to get it marginally liveable. I have itemized the most
important things that need to be done and estimated the time required as shown below. As per the
given case scenario, it has been analyzed that I have an inherited a century of farm house in the
rural area and I have visited the site for made an inspection. I intend to utilize this house for
excursions and as an investment property through Airbnb. Truth be told, my work partner as
1
Document Page
officially communicated enthusiasm for remaining over when the property is done. Myfolks have
supportedme with an individual credit of $10.000, - that will give me enough cash to purchase
the provisions and have a spending plan on assistance from a nearby contractual worker and two
of his understudies. I have focused on working 80 hours over your get-away to repair the house,
however i am loathsome at carpentry and painting.
Evaluation of the event and scenario
As per the case scenario, I have great responsibility to manage the project of Old farm
house business. By applied several effective methods, techniques, strategies and tools I have
successfully accomplished old farm house business project. I have focused on the several aspects
of the project management which are discussed below- Cost- Cost is one of the significant aspect in the project management that helps to project
manager in accomplishing all task. While I have focused on the project of old farm house
then firstly I have considered the cost and budget of the report. As per the scenario,
Myfolks have supported me with an individual credit of $10.000 that will give me
enough cash to purchase the provisions and have a spending plan on assistance from a
nearby contractual worker and two of his understudies. I have to accomplish all activities
of the project within this unit (Wysocki, 2011). I have effectively managed the budget
and cost associated with project of old farm house through which I have accomplished all
activities of it in effective and efficient manner. I have used the activity based costing
method for utilize financial resource in effective and efficient manner. Time- Keeping in mind the end goal to build extend administration design, scientist need
to center around the orderly day and age for achieve a few exercises of undertaking.
Because of lacking day and age, it is exceptionally hard to center and achieve a few
exercises. For deal with all exercises of undertaking inside an adequate day and age,
analyst has utilized Gantt diagram technique and work separate structure. With helps of
these methods, researcher can ready to arrange and lead every action inside a particular
time period. In this viewpoint, it is vital for the researcher to deal with the high caliber of
examination think about (Schwalbe, 2015). All data should important to objective and in
addition ought to be in high caliber. I have objective in this project that each activities of
the project should successfully its deadline that is why I have focused on the Gantt chart
method. I have analyzed that it is one of they most significant method in the project
2
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
management that can assists to the researcher in accomplishing the each activities of the
project within systematic time period. With help of the Gantt chart method I have able to
organized each activities of the project in specific time by divided whole time in the
small time period. Resource - For build venture administration design, analyst required significant three
assets that are time, back and human asset. These all assets assumes an extremely pivotal
part in the examination arranging on the grounds that without these assets, researcher can
meet the target of study Scope- I have effectively focused on the scope of the project by which I have
successfully analyzed the future requirement of project. This old farm house have great
value because it is situated in the rural area(Portny, 2010). Scope of the project is also
very high because it will purchase in the future in the highest amount. I have successfully
meet the scope of the project by which I have attained the objective of the project.
Risk- Risk is another one of the most significant aspect in the project management that
should meet by the project manager. It is very important for the project manager to focus
on the risk which is associated with the project. In the current scenario, I have major
objective is to design the project of Old farm house. During this project I have
successfully looked toward the risk such as changing economic condition of the country,
prices of the house in the construction sector etc.
As per the above discussion it has been analyzed that I have focused on the several aspects of the
successful project management by which I have meet deadline of the project such as Old farm
house. In order to accomplish the target of the project, I have used the following procedure of the
project management-
Initiating- This is one of the important stage in the project management plan under which
project manager have to focus on the idea and creative thoughts regarding the project. In
this stage I have focused on the idea regarding old farm house reconstruction. In this
stage I have focused on the thoughts of reconstruction of the old farm house (Patanakul
Iewwongcharoen and Milosevic, 2010). I have thoughts that house required to great deal
of repair work.
Planning- Once the idea have generated in the mind then I have developed a systematic
planning for execute the idea in the reality .I have focused on te budget and cost
3
Document Page
associated with all activities and functions. Furthermore, I intend to utilize this house for
excursions and as an investment property through Airbnb. Truth be told, my work partner
as officially communicated enthusiasm for remaining over when the property is done.
Myfolks have supported me with an individual credit of $10.000 that will give me
enough cash to purchase the provisions and have a spending plan on assistance from a
nearby contractual worker and two of his understudies.
Executing- Once the planning of the old house have systematically developed then in the
next stage I have executed the plan in the reality (Patanakul and Shenhar, 2012). I have
carried out all necessary activities and function that have supported my plan for
reconstruct the old farm house. In this stage I have used several strategies, approaches
and tactics for accomplish the objective.
Monitoring- In this stage I have successfully monitored the each activities and function
which have organized in the program of project management. By this stage I have learnt
the monitoring and leadership skill. In this stage, I have also monitored the work of other
co workers.
Controlling- Once all activities and functions have effectively monitored then in the next
stage I have control the executed program. In this stage I have used several techniques
and tools for control the project management plan's activities.
Closing- In this stage I have successfully close the activities and function of the project
old farm house.
Analysis of the event and scenario
From the above discussion I have analyses that by help of this project I have improved
my personality ad professionalism because I have accomplished all task and activities associated
with project on the time. By this experience in the old house project I have learnt so many new
things and skill which will help me in improving my personality and I can effectively meet the
success in the future. By use of the following R' I can effectively describe my experience. These
R' are as follows-
Reporting- As per the case scenario, I have to reconstruct the old farm house which is
situated in the rural area.
Responding- While I have got the project regarding the old farm house reconstruction
then I was very excited because this is my first project and this project is given me by my
4
Document Page
parents. At the initial level while I have got the project then I thought about my strength
and weakness. I have analyzed that my communication, leadership, monitoring and
positive attitude will help me in accomplishing this project in more effective and efficient
manner.
Relating- I have analyzed that I have all those skills and ability which is required in the
successful project manager. I have thought that my past experience regarding the
construction work will help me in accomplishing this project. I have great knowledge
about the project management theories, concept, approaches and practices that will help
me in achieving my target regarding project (Morris, 2010).
Reasoning- I have analyzed that my knowledge, skill, ability and experience have
supported me in great manner as I have successfully achieved the target of the project
within specified time. However, my time management skill have created some issue
because I have weak time management skill and decision making skill.
CONCLUSION
From this report it has been analyses that Project Management is an uncommon business
thought for sensible masterminds, sorted out arranging and meticulous experts. Each business
association is having its own set destinations and objectives. While any project manager
develops the project then it is very important to focus on the several aspects that will assists them
in accomplishing the project.
5
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
REFERENCES
Morris, P.W., 2010. Research and the future of project management.International Journal of
Managing Projects in Business, 3(1), pp.139-146.
Patanakul, P. and Shenhar, A.J., 2012. What project strategy really is: The fundamental building
block in strategic project management. Project Management Journal, 43(1), pp.4-20.
Patanakul, P., Iewwongcharoen, B. and Milosevic, D., 2010. An empirical study on the use of
project management tools and techniques across project life-cycle and their impact on
project success. Journal of General Management, 35(3), pp.41-65.
Portny, S.E., 2010. Project management for dummies. John Wiley & Sons.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Wu, P. and Low, S.P., 2010. Project management and green buildings: lessons from the rating
systems. Journal of Professional Issues in Engineering Education and Practice, 136(2),
pp.64-70.
Wysocki, R.K., 2011. Effective project management: traditional, agile, extreme. John Wiley &
Sons.