logo

Project Management in Research Project 2022

   

Added on  2022-09-26

14 Pages1896 Words27 Views
Running head: PROJECT MANAGEMENT
Project management
Name of the Student
Name of the University
Author’s Note

PROJECT MANAGEMENT
1
Table of Contents
Part 1: Identifying scope complexity and WBS..............................................................................2
Part 1A: Identification of scope and complexity.........................................................................2
Part 1B: Creating a Work breakdown structure...........................................................................4
Part 2: Project Network...................................................................................................................5
Part 3: Gantt chart............................................................................................................................6
Bibliography..................................................................................................................................11

PROJECT MANAGEMENT
2
Part 1: Identifying scope complexity and WBS
Part 1A: Identification of scope and complexity
Project 1: Past Project
Title/description: The paper mainly reflects on Vista Tower project is 101 story supertall
skyscrapers under construction within Chicago. The project mainly starts on 2016 and the
entire project gets completed by the year 2020. It is found that the Vista tower will generally
contain around 400 condominium residences as well as five-star Wanda Vista hotel with
around 200 rooms.
Map this project to the graph as shown.
The outcomes (Y axis): The outcome of the project is Vague.
The methods (X axis): The method of the project is Clear.
In which quadrant did the project start?
The project generally starts in the 3rd quadrant.
Project
(Current
Clear Vagu
e
Vague Clear

PROJECT MANAGEMENT
3
In which quadrant did the project end?
The project is currently in 2nd Quadrant
Project 2: Current Project
Title/description: The paper mainly reflects on LaGuardia airport construction project which
generally commenced in the year 2015 and mainly aims to created proper unified 21st century
terminal system with very much improved transportation access as well as 8 miles of roadway
that further includes around 24 bridges as well as other airside taxiways as well as other
passenger amenities.
Map this project to the graph as shown.
The outcomes (Y axis): The outcome is Vague as per the above diagram
The methods (X axis): The method is Clear as per the above diagram
In which quadrant did the project start?
The project mainly starts in the 3rd quadrant
Project
(Current
Clear
Vague Clear

End of preview