logo

Refurbishment and redevelopment of the London Campus

   

Added on  2022-08-08

8 Pages1381 Words53 Views
 | 
 | 
 | 
Project Name: Refurbishment and redevelopment of the London Campus
Project Manager: Leonilde Mendes
Project Sponsor:
Project Customer:
Effective date:
Approval:
Refurbishment and redevelopment of the London Campus_1

Table of Contents
Introduction...................................................................................................................3
Project Initiation Document (PiD).................................................................................3
Project Background...................................................................................................3
Methodology..............................................................................................................3
Purpose of the project...............................................................................................3
Project objectives......................................................................................................4
Project scope............................................................................................................4
Key Risk....................................................................................................................4
Key Staff....................................................................................................................4
Key constraints..........................................................................................................5
Key assumptions.......................................................................................................5
Key deliverables........................................................................................................5
Key success factors..................................................................................................5
Approvals..................................................................................................................5
Stakeholders.............................................................................................................5
Work Breakdown Structure (WBS)...............................................................................6
Importance of WBS...................................................................................................6
Critical Path...............................................................................................................6
Tabular of WBS.........................................................................................................7
Bibliography..................................................................................................................8
Refurbishment and redevelopment of the London Campus_2

Introduction
QAHE has several campuses around UK and after assessing the current
condition of each of the campus, the authority has decided to refurbish and
redevelop the business wing of the London Campus. The authority has also
allocated a fund of £100k for the entire project.
Project Initiation Document (PiD)
Project Background
. During the course of this project, London Campus of QAHE will be
refurbished and redeveloped as per the instructions of the university. The university
wants to increase space and facilities for the departments and hence, the
redevelopment project has been authorised.
Methodology
The suggested approach (methodology) is to hire a contractor who will take
care of all the construction and refurbishment works in the campus. The overall
amount that is to be paid needs to be decided before handing over the contract to
the contractor. The contractor can use his own workers in the entire duration of the
project and their wages will be included within the contract sum only. The project can
be conducted utilising the PRINCE2 methodology where each and every part of the
project will be executed as per the work package breakdown discussed later in the
report.
Purpose of the project
The primary purpose of this project is to expand the existing facilities and
overall space available for the business students. The expansion will include
Refurbishment and redevelopment of the London Campus_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
London Estimated budget
|12
|4055
|14

Project Management: Initiation, Stakeholder Analysis, Risk Register
|24
|5289
|51

Project Management Case Study - Desklib
|19
|4183
|312

Project Management: Refurbishing Classrooms and Computer Labs for Business Students
|14
|3180
|67

Report on Understanding Phases of Project Management
|16
|3764
|157

Project Management: Improving Spaces for Business Students
|19
|4454
|22