1PROJECT REPORT Table of Contents 1. Project Title.................................................................................................................................3 2. Introduction..................................................................................................................................3 3. Business Case..............................................................................................................................3 3.1 Project Background...............................................................................................................3 3.2 Project Analysis: SWOT Analysis.........................................................................................4 3.3 Project Objectives..................................................................................................................6 3.4 Assumptions and Constraints................................................................................................6 4. Project Scope...............................................................................................................................7 4.1 Project Scope Statement........................................................................................................7 4.2 High Level WBS....................................................................................................................7 5. Literature Review......................................................................................................................11 5.1 Literature Summary on Project/Program Best Practice Delivery Models...........................11 5.1.1 Project Delivery Methods.................................................................................................12 5.2 Literature Summary Related to Project Topic.....................................................................12 6. Selected Project Delivery Method.............................................................................................13 6.1 Processes – Phases in Project Delivery System...................................................................13 6.1.1 Advantages of Project Delivery System.......................................................................13 6.1.2 Disadvantages and Risk in Project Delivery System....................................................13 6.2 Contracting and Procurement Methods...............................................................................13 7. Management Plans and Delivery System Implementation........................................................14
2PROJECT REPORT 7.1 Human Resource Management Plan....................................................................................14 7.1.1 Organizational and operation chart...............................................................................14 7.2 Analysis of Stakeholder and Communication Management Plan.......................................15 7.3 Project Timetable.................................................................................................................16 7.4 Feasibility Analysis.............................................................................................................20 7.5 Project Governance..............................................................................................................20 8. Conclusion.................................................................................................................................20 9. References..................................................................................................................................21
3PROJECT REPORT 1. Project Title The title of the project is “Refurnishing of Opera House” and it would involve the development of the construction project for refurnishing Opera House. The project would involve the use of the effective and improved construction for forming the management of the operations of Refurnishing of Opera House. 2. Introduction The concept of project management is implied for developing the construction project of implying the safety and compliance of the activities of project developed. The evaluation of the project concepts would be developed for integrating the analysis of the system integration and development. The formation of the project evaluation methods would be formed for the evolution of the effective and improved operation management process. The principles of the project would be formed for integrating the development of the construction principles and its evaluation for the management of the operations. The scenario of the development would be formed for renovating the Opera House and its implication for the management of the operations. The involvement of the project principles would evaluate the analysis of the systematic improvement of the operations for the project. 3. Business Case 3.1 Project Background The construction project has been developed for involving the construction activities of the Opera House Renovation. The project would result in forming the specific construction activities of the project for integrating the principles of the project management along with the support of the construction activities for renovating the Opera House. The undertaking would include the utilization of the viable and enhanced development for framing the administration of the operations of Refurnishing of Opera House. The situation of the advancement would be framed for redesigning the Opera House and its suggestion for the administration of the operations. The inclusion of the undertaking standards would assess the investigation of the efficient change of the operations for the task. Following are the reasons for undertaking the project of Opera House Renovation,
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4PROJECT REPORT Fading of the paints of Opera House due to dust Tampering of the infrastructure due to rain, wind and pollution Old furniture, seating arrangement, and structures in the interior The completion of the project would tend to develop the renovation and beautification of the Opera House. The construction activities would form the involvement of the project management principles and processes for refurnishing the Opera House. 3.2 Project Analysis: SWOT Analysis The SWOT analysis comprise of analysing the project of integrating the construction activities for developing the analysis of the construction activities for forming the development of the project analysis and processes. The following diagram would be show the SWOT analysis of the project, .Figure 1: SWOT Analysis of the Project SWOT Analysis Strengths Use of construction project management Threats Safety Issues of the Construction Weaknesses Dependent on Construction Activities Opportunities Refurnishing of the Opera House
5PROJECT REPORT (Source: Created by the author) Strengths:The project of refurnishing the Opera House would be implied for the development of the effective and improved construction operations. The use of the construction activities would be implied by using the concept of project management operations. The analysis of the project would be developed for increasing the efficiency of operations for the development of the operations and integration of the system analysis and development. The utilization of the development exercises would be inferred by utilizing the idea of undertaking administration operations. The examination of the project would be produced for expanding the proficiency of operationsfortheimprovementoftheoperationsandcombinationoftheframework investigation and advancement. Weaknesses:The project refurnishing the Opera House would be implied for the development of the effective and improved construction operations. However, the project would have to face the issue of dependence on the activities of construction that can be subjected to the development of the issues and problems. The hindrances of the construction activities would not be supplementary for the integration of the construction project management. It is possible that the activities of the construction activities might not be supplementary for the analysis of the improvement of the project operations. The task would need to confront the issue of reliance on the exercises of development that can be subjected to the advancement of the issues. Opportunities:The project refurnishing the Opera House would be implied for the development of the effective and improved construction operations. The analysis of the project would tend to use the construction activities for forming the deployment of the improved system analysis. The development of the project operations would tend to form the issues in carrying out the management of the operations for dealing the smart processing of the organization. The examination of the undertaking would tend to utilize the development exercises for framing the sending of the enhanced framework investigation. The advancement of the project operations would tend to shape the issues in completing the administration of the operations for managing the shrewd handling of the association. Threats:TheprojectrefurnishingtheOperaHousewouldbeimpliedforthe development of the effective and improved construction operations. The threat of the project of
6PROJECT REPORT renovating the Opera House is Safety Issues of the Construction. The construction activity requires the development of the effective and smart processing of the organization. The threat of the project would result in forming the development of the operations. The danger of the project of redesigning the Opera House is Safety Issues of the Construction. The development action requires the advancement of the compelling and shrewd preparing of the association. The danger of the task would bring about shaping the improvement of the operations. 3.3 Project Objectives The objectives of the refurnishing the Opera House project include, To develop project plan for the renovation construction of the Opera House To construct the renovation of the Opera House To successfully complete the project in the estimated time To overcome the project operations in the calculated budget 3.4 Assumptions and Constraints The assumptions of the project of refurnishing the Opera House are, Completion of the project in time:The refurnishing the Opera House should be completed in the estimated time duration and it would realize the effective processing of the information. The analysis of the project would tend to use the construction activities for forming the deployment of the improved system analysis. The development of the project operations would tend to form the issues in carrying out the management of the operations for dealing the smart processing of the organization. Refurnishing would be successful:The refurnishing the Opera House would be implied for completion of the renovation technology for the development of the analysis of the effective and improvement process. It is possible that the activities of the construction activities might not be supplementary for the analysis of the improvement of the project operations. The task would need to confront the issue of reliance on the exercises of development that can be subjected to the advancement of the issues
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7PROJECT REPORT The constraints of the project of refurnishing the Opera House are, Construction Safety and Health Functions: The project of refurnishing the Opera House is constrained by the safety and health functions. It is required for the deployment of the healthandsafetycompliance.Thedevelopmentactionrequirestheadvancementofthe compelling and shrewd preparing of the association. Government Approval: The approval of the government would be important for the development of the effective and improved project analysis. The development of the project operations would tend to form the issues in carrying out the management of the operations for dealing the smart processing of the organization. 4. Project Scope 4.1 Project Scope Statement The project scope statement for the refurnishing the Opera House project can be stated as, “The refurnishing the Opera House project should be developed for using the concepts of project management and its integration of the analysis model. The concise development of the project would form the implementation development. The project of refurnishing the Opera House is constrained by the safety and health functions. It is required for the deployment of the healthandsafetycompliance.Thedevelopmentactionrequirestheadvancementofthe compelling and shrewd preparing of the association.” 4.2 High Level WBS The high level WBS for the refurnishing the Opera House project can be shown in the diagram and table below, In table format, WBSTask Name 0Refurnishing of Opera House 1Initial Documentation and Tender Contract Development
8PROJECT REPORT 1.1Project Requirement is Analyzed 1.2Forming a Basic Outline of activities to be included 1.3Estimation of Cost Budget 1.4Development of Tender Document for Opera House Construction 1.5Submission of the Tender Document 1.6Tender Document is reviewed M1Government and Contractor Approval for the Tender Contract 2Detail Planning and Resource Accumulation 2.1Outline of Plan is Extended for developing complete plan 2.2Resources for Opera House Construction is accumulated 2.3Human Resources are Assigned with Planned Activities 2.4Material Resources are Ordered and Received 2.5Resources are Stored near the Opera House M2Construction for refurnishing of Opera House is started 3Refurnishing Construction of Opera House 3.1Refurnishing Design Development 3.1.1Existing Design of Opera House is reviewed 3.1.2Areas of improvement is identified 3.1.3New Design of Opera House is formed
9PROJECT REPORT 3.1.4Design is analyzed from feasibility point of view M3Design is approved 3.2Construction Activities 3.2.1Site is abstained from human inhabitation 3.2.2Resources are accumulated at the site of Opera House 3.2.3Health and Safety Equipments are installed at site 3.2.4Modification of the outer infrastructure of Opera House 3.2.4.1Cleaning of the walls and tombs 3.2.4.2Removal of any damp or crack 3.2.4.3Base Coating the outer infrastructure 3.2.4.4Completion of coloring of the outer infrastructure M4Outer Surface of Opera house is completed 3.2.5Modification of the inner infrastructure of Opera House 3.2.5.1Seating arrangements are renewed 3.2.5.2Statues and Decorations are refurnished 3.2.5.3System Implemented at Opera House is checked M4Interior of Opera House is refurnished 3.2.6Final Review of the refurnished Opera House M5Refurnishing of Opera House is completed
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10PROJECT REPORT 4Final Documentation 4.1Making Project Report 4.2Submission of the project report 4.3Review of the Project Report 4.4Signing off M6Project is closed Table 1: WBS of the Project (Source: Created by the author) In diagram format,
11PROJECT REPORT 0- Refurnishing of Opera House 1- Initial Documentation and Tender Contract Development 1.1- Project Requirement is Analysed 1.2- Forming a Basic Outline of activities to be included 1.3- Estimation of Cost Budget 1.4- Development of Tender Document for Opera House Construction 1.5- Submission of the Tender Document 1.6- Tender Document is reviewed M1- Government and Contractor Approval for the Tender Contract 2- Detail Planning and Resource Accumulation 2.1- Outline of Plan is Extended for developing complete plan 2.2- Resources for Opera House Construction is accumulated 2.3- Human Resources are Assigned with Planned Activities 2.4- Material Resources are Ordered and Received 2.5- Resources are Stored near the Opera House M2- Construction for refurnishing of Opera House is started 3- Refurnishing Construction of Opera House 3.1- Refurnishing Design Development 3.1.1- Existing Design of Opera House is reviewed 3.1.2- Areas of improvement is identified 3.1.3- New Design of Opera House is formed 3.1.4- Design is analyzed from feasibility point of view M3- Design is approved 3.2- Construction Activities 3.2.1- Site is abstained from human inhabitation 3.2.2- Resources are accumulated at the site of Opera House 3.2.3- Health and Safety Equipments are installed at site 3.2.4- Modification of the outer infrastructure of Opera House 3.2.4.1- Cleaning of the walls and tombs 3.2.4.2- Removal of any damp or crack 3.2.4.3- Base Coating the outer infrastructure 3.2.4.4- Completion of colouring of the outer infrastructure M4- Outer Surface of Opera house is completed 3.2.5- Modification of the inner infrastructure of Opera House 3.2.5.1- Seating arrangements are renewed 3.2.5.2- Statues and Decorations are refurnished 3.2.5.3- System Implemented at Opera House is checked M4- Interior of Opera House is refurnished 3.2.6- Final Review of the refurnished Opera House M5- Refurnishing of Opera House is completed 4- Final Documentation 4.1- Making Project Report 4.2- Submission of the project report 4.3- Review of the Project Report 4.4- Signing off M6- Project is closed Figure 2: WBS of the Project (Source: Created by the author) 5. Literature Review 5.1 Literature Summary on Project/Program Best Practice Delivery Models As per Fong, Avetisyan and Cui (2014), the undertaking conveyance demonstrates consist of building up a successful and arranging, planning and actualizing the execution of the
12PROJECT REPORT task operations. The conveyance of the undertaking is a standout amongst the most genuine techniques for the investigation of the procurement procedure for the improvement of the task deliverance to the customer. The determination of the project conveyance demonstrate is another main consideration that could affect the accomplishment of the undertaking (Kereri and Gad, (2015). The conveyance strategies picked ought to be done simply after earlier learning of the different task conveyance techniques. 5.1.1 Project Delivery Methods As opined by Shrestha et al. (2014), the different project conveyance strategies utilized for the distinctive tasks are CMR or construction management at risk, design-bid-build, design build, and multi prime. These techniques would be useful for passing on the fittingness of the undertakingdeliverancetothecustomer.Theconveyancestrategyfordevelopment administration in danger is suggested for involving the dedication made by the project proprietor and it's noteworthy conveyance of the undertaking in an unequivocal calendar and cost. The operations of undertaking would include the advancement of the compelling and enhanced procedures. These strategies would be helpful for passing on the fittingness of the undertaking deliverance to the client (Lines, Sullivan and Smithwick, (2014). The transport methodology for advancement organization in risk is gathered for including the commitment made by the endeavour proprietor and it's vital movement of the undertaking in a positive date-book and cost. The operations of task would incorporate the progression of the capable and upgraded methods. The particular exercises are CMR or improvement organization in peril, design offer shape, diagram make, and multi prime. 5.2 Literature Summary Related to Project Topic As indicated by Fewings (2013), the task administration holds a major part is successful realization of the endeavour operations and its enhanced progression and organization. The headway of the assignment would help in organizing the change of the convincing and upgraded examination of the structure organization and progression process. The change of the errand would be helpful for the blend of the database for the records of the patients and experts. The endeavour is created for helping the game plan of the suitable and improved affiliation getting ready inside the information treatment of the affiliation. Then again, Golini, Kalchschmidt and
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
13PROJECT REPORT Landoni (2015) have called attention to that the relationship of the errand blend would be valuable for confining the supplementary progression of the operations of information searching for by prosperity affiliations. The undertaking would develop a fused information structure for the securing the data and information related to the patients and masters. The examination would help in encircling the situational examination of the undertaking the extent that specific and cash related common sense. 6. Selected Project Delivery Method 6.1 Processes – Phases in Project Delivery System The feasible undertaking conveyance technique would be suggested for the advancement of the procedures of the Global Health Record System for Health Organization Project. The undertakingconveyanceframeworkthatcanbeutilizedfortheprojectisConstruction Management at Risk strategy. The development administration in danger incorporates three straight stages in particular Design, Bid, and Build/Fast Tracked. The project would be useful for the organization of the wellbeing record framework and it would bring about ramifications of the successful handling. The stages would be suggested for building up the compelling abilities and procedures. 6.1.1 Advantages of Project Delivery System The Construction Management in danger would be useful for including three prime people in the undertaking and they are proprietor, architect, and CM-constructor. It would help in concentrating the arrangement of the successful and enhanced capacities in the association. There are two separate contracts in this strategy specifically, proprietor to originator and proprietor to CM-constructor. 6.1.2 Disadvantages and Risk in Project Delivery System The Construction Management in danger would bring about cornering the undertaking by constraining the energy of the project to the proprietor. The sole obligation of specifying the outline for the undertaking is the proprietor and it would frame the issues in building up the compact arranging.
14PROJECT REPORT 6.2 Contracting and Procurement Methods The contracting and acquisition techniques are useful for the contribution of the fruitful project culmination. The obtainment and contracting techniques are useful for building the properstrategiesforadvancementsystemanditshugeadministrationmethodology.The agreement advancement is suggested for shaping the investigation of the materials and providing the undertaking with incorporation and administration. The agreement choice would shape the administration of the operations. The contracting and procurement methods are helpful for the considerationoftheproductiveassignmentclimax.Theacquisitionandcontracting methodologies are helpful for building the reasonable strategies for progression framework and its immense organization strategy. The assertion headway is recommended for moulding the examination of the materials and giving the endeavour compromise and organization. The assertion assurance would shape the organization of the operations. 7. Management Plans and Delivery System Implementation 7.1 Human Resource Management Plan 7.1.1 Organizational and operation chart
15PROJECT REPORT Figure 3: Organizational and operation chart 7.2 Analysis of Stakeholder and Communication Management Plan The project of renovation of Opera House is formed for the stakeholder analysis and deployment of the communication management plan. The communication plan for the various stakeholders of the project is shown in the table below, Communication Medium Involved StakeholdersInformation Shared ReportsGovernmentProject Feasibility Analysis EmailsProject ManagerProject Progress Reports Board MeetingsContractorsExternal Activities of the project ConversationWorkers LaboursActivities of the project GovernmentProject Manager Contractor LaboursWorker PlannerDocumenter
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
16PROJECT REPORT 7.3 Project Timetable The project of renovating the Opera House has been shown in the table and Gantt chart given below, In table format, WBSTask NameDurationStartFinishPredecessors 0Refurnishing of Opera House101 daysMon 3/5/18 Mon 7/23/18 1Initial Documentation and Tender Contract Development15 daysMon 3/5/18 Fri 3/23/18 1.1Project Requirement is Analyzed3 daysMon 3/5/18 Wed 3/7/18 1.2Forming a Basic Outline of activities to be included4 daysThu 3/8/18Tue 3/13/182 1.3Estimation of Cost Budget2 daysWed 3/14/18 Thu 3/15/183 1.4Development of Tender Document for Opera House Construction3 daysFri 3/16/18Tue 3/20/184 1.5Submission of the Tender Document1 dayWed 3/21/18 Wed 3/21/185 1.6Tender Document is reviewed2 daysThu 3/22/18Fri 3/23/186 M1GovernmentandContractor Approval for the Tender Contract0 daysFri 3/23/18Fri 3/23/187 2DetailPlanningandResource Accumulation16 daysMon 3/26/18 Mon 4/16/18 2.1Outline of Plan is Extended for developing complete plan5 daysMon 3/26/18Fri 3/30/188
17PROJECT REPORT 2.2ResourcesforOperaHouse Construction is accumulated4 daysMon 4/2/18Thu 4/5/1810 2.3Human Resources are Assigned with Planned Activities3 daysFri 4/6/18Tue 4/10/1811 2.4Material Resources are Ordered and Received2 daysWed 4/11/18 Thu 4/12/1812 2.5Resources are Stored near the Opera House2 daysFri 4/13/18Mon 4/16/1813 M2Construction for refurnishing of Opera House is started0 daysMon 4/16/18 Mon 4/16/1814 3Refurnishing Construction of Opera House65 daysTue 4/17/18 Mon 7/16/18 3.1Refurnishing Design Development10 daysTue 4/17/18 Mon 4/30/18 3.1.1Existing Design of Opera House is reviewed2 daysTue 4/17/18 Wed 4/18/1815 3.1.2Areas of improvement is identified1 dayThu 4/19/18 Thu 4/19/1818 3.1.3New Design of Opera House is formed5 daysFri 4/20/18Thu 4/26/1819 3.1.4Design is analyzed from feasibility point of view2 daysFri 4/27/18Mon 4/30/1820 M3Design is approved0 daysMon 4/30/18 Mon 4/30/1821 3.2Construction Activities55 daysTue 5/1/18Mon 7/16/18 3.2.1Site is abstained from human inhabitation2 daysTue 5/1/18Wed 5/2/1822 3.2.2Resources are accumulated at the site of Opera House2 daysThu 5/3/18Fri 5/4/1824 3.2.3Health and Safety Equipments are installed at site4 daysMon 5/7/18 Thu 5/10/1825
18PROJECT REPORT 3.2.4Modification of the outer infrastructure of Opera House19 daysFri 5/11/18 Wed 6/6/18 3.2.4.1Cleaning of the walls and tombs4 daysFri 5/11/18Wed 5/16/1826 3.2.4.2Removal of any damp or crack3 daysThu 5/17/18 Mon 5/21/1828 3.2.4.3Base Coating the outer infrastructure5 daysTue 5/22/18 Mon 5/28/1829 3.2.4.4Completion of coloring of the outer infrastructure7 daysTue 5/29/18 Wed 6/6/1830 M4Outer Surface of Opera house is completed0 daysWed 6/6/18 Wed 6/6/1831 3.2.5Modification of the inner infrastructure of Opera House26 daysThu 6/7/18 Thu 7/12/18 3.2.5.1Seating arrangements are renewed5 daysThu 6/7/18Wed 6/13/1832 3.2.5.2Statues and Decorations are refurnished7 daysThu 6/14/18Fri 6/22/1834 3.2.5.3System Implemented at Opera House is checked4 daysMon 6/25/18 Thu 6/28/1835 M4Interior of Opera House is refurnished10 daysFri 6/29/18Thu 7/12/1836 3.2.6Final Review of the refurnished Opera House2 daysFri 7/13/18Mon 7/16/1837 M5Refurnishing of Opera House is completed0 daysMon 7/16/18 Mon 7/16/1838 4Final Documentation5 daysTue 7/17/18 Mon 7/23/18 4.1Making Project Report3.5 daysTue 7/17/18Fri 7/20/1839 4.2Submission of the project report0.5 daysFri 7/20/18Fri 7/20/1841 4.3Review of the Project Report0.5 daysMonMon42
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
19PROJECT REPORT 7/23/187/23/18 4.4Signing off0.5 daysMon 7/23/18 Mon 7/23/1843 M6Project is closed0 daysMon 7/23/18 Mon 7/23/1844 In Gantt chart format,
20PROJECT REPORT IDTask Mode WBSTask NameDurationStartFinishPredecessors 00Refurnishing of Opera House101 daysMon 3/5/18Mon 7/23/18 11Initial Documentation and Tender Contract Development15 daysMon 3/5/18Fri 3/23/18 21.1Project Requirement is Analysed3 daysMon 3/5/18Wed 3/7/18 31.2Forming a Basic Outline of activities to be included4 daysThu 3/8/18Tue 3/13/182 41.3Estimation of Cost Budget2 daysWed 3/14/18Thu 3/15/183 51.4Development of Tender Document for Opera House Construction3 daysFri 3/16/18Tue 3/20/184 61.5Submission of the Tender Document1 dayWed 3/21/18Wed 3/21/185 71.6Tender Document is reviewed2 daysThu 3/22/18Fri 3/23/186 8M1Government and Contractor Approval for the Tender Contract0 daysFri 3/23/18Fri 3/23/187 92Detail Planning and Resource Accumulation16 daysMon 3/26/18Mon 4/16/18 102.1Outline of Plan is Extended for developing complete plan5 daysMon 3/26/18Fri 3/30/188 112.2Resources for Opera House Construction is accumulated4 daysMon 4/2/18Thu 4/5/1810 122.3Human Resources are Assigned with Planned Activities3 daysFri 4/6/18Tue 4/10/1811 132.4Material Resources are Ordered and Received2 daysWed 4/11/18Thu 4/12/1812 142.5Resources are Stored near the Opera House2 daysFri 4/13/18Mon 4/16/1813 15M2Construction for refurnishing of Opera House is started0 daysMon 4/16/18Mon 4/16/1814 163Refurnishing Construction of Opera House65 daysTue 4/17/18Mon 7/16/18 173.1Refurnishing Design Development10 daysTue 4/17/18Mon 4/30/18 183.1.1Existing Design of Opera House is reviewed2 daysTue 4/17/18Wed 4/18/1815 193.1.2Areas of improvement is identified1 dayThu 4/19/18Thu 4/19/1818 203.1.3New Design of Opera House is formed5 daysFri 4/20/18Thu 4/26/1819 213.1.4Design is analyzed from feasibility point of view2 daysFri 4/27/18Mon 4/30/1820 22M3Design is approved0 daysMon 4/30/18Mon 4/30/1821 233.2Construction Activities55 daysTue 5/1/18Mon 7/16/18 243.2.1Site is abstained from human inhabitation2 daysTue 5/1/18Wed 5/2/1822 253.2.2Resources are accumulated at the site of Opera House2 daysThu 5/3/18Fri 5/4/1824 263.2.3Health and Safety Equipments are installed at site4 daysMon 5/7/18Thu 5/10/1825 273.2.4Modification of the outer infrastructure of Opera House19 daysFri 5/11/18Wed 6/6/18 283.2.4.1Cleaning of the walls and tombs4 daysFri 5/11/18Wed 5/16/1826 293.2.4.2Removal of any damp or crack3 daysThu 5/17/18Mon 5/21/1828 303.2.4.3Base Coating the outer infrastructure5 daysTue 5/22/18Mon 5/28/1829 313.2.4.4Completion of colouring of the outer infrastructure7 daysTue 5/29/18Wed 6/6/1830 32M4Outer Surface of Opera house is completed0 daysWed 6/6/18Wed 6/6/1831 333.2.5Modification of the inner infrastructure of Opera House26 daysThu 6/7/18Thu 7/12/18 343.2.5.1Seating arrangements are renewed5 daysThu 6/7/18Wed 6/13/1832 353.2.5.2Statues and Decorations are refurnished7 daysThu 6/14/18Fri 6/22/1834 363.2.5.3System Implemented at Opera House is checked4 daysMon 6/25/18Thu 6/28/1835 37M4Interior of Opera House is refurnished10 daysFri 6/29/18Thu 7/12/1836 383.2.6Final Review of the refurnished Opera House2 daysFri 7/13/18Mon 7/16/1837 39M5Refurnishing of Opera House is completed0 daysMon 7/16/18Mon 7/16/1838 404Final Documentation5 daysTue 7/17/18Mon 7/23/18 414.1Making Project Report3.5 daysTue 7/17/18Fri 7/20/1839 424.2Submission of the project report0.5 daysFri 7/20/18Fri 7/20/1841 434.3Review of the Project Report0.5 daysMon 7/23/18Mon 7/23/1842 444.4Signing off0.5 daysMon 7/23/18Mon 7/23/1843 45M6Project is closed0 daysMon 7/23/18Mon 7/23/1844 3/23 4/16 4/30 6/6 7/16 7/23 2/253/113/254/84/225/65/206/36/177/17/157/298/128/26 February 1March 1April 1May 1June 1July 1August 1 7.4 Feasibility Analysis The feasibility analysis has shown the role of the effective and improved processing and development. The formation of the appropriate support and development would be helpful for the construction project. The feasibility analysis is a measure of the health and safety compliance for the Opera House Renovation Project.
21PROJECT REPORT 7.5 Project Governance The governance of the project lies on the hand of the government approval and project management principles followed by the project manager. 8. Conclusion The project refurnishing the Opera House was implied for the development of the effective and improved construction operations. The analysis of the project tended to use the construction activities for forming the deployment of the improved system analysis. The development of the project operations resulted to form the issues in carrying out the management of the operations for dealing the smart processing of the organization. The concept of project management was implied for developing the construction project of implying the safety and compliance of the activities of project developed. The evaluation of the project concepts were developed for integrating the analysis of the system integration and development. The formation of the project evaluation methods were formed for the evolution of the effective and improved operation management process. The principles of the project were formed for integrating the development of the construction principles and its evaluation for the management of the operations.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
22PROJECT REPORT 9. References Asqtoronto.org., (2017).Seven Quality Tools | ASQ Toronto Section 402.Retrieved 9 September 2017, from http://asqtoronto.org/resources/quality-tools/seven-quality-tools/ Chartier, L. B., Cheng, A. H., Stang, A. S., & Vaillancourt, S. (2017). Quality improvement primerpart1:Preparingforaqualityimprovementprojectintheemergency department.Canadian Journal of Emergency Medicine, 1-8. Corona-Suárez, G. A., AbouRizk, S. M., & Karapetrovic, S. (2014). Simulation-based fuzzy logic approach to assessing the effect of project quality management on construction performance.Journal of Quality and Reliability Engineering,2014. Fewings, P. (2013).Construction project management: an integrated approach. Routledge. Fong, C. K., Avetisyan, H. G., & Cui, Q. (2014). Understanding the Sustainable Outcome of ProjectDeliveryMethodsintheBuiltEnvironment.Organization,Technology& Management in Construction,6(3). Golini, R., Kalchschmidt, M., & Landoni, P. (2015). Adoption of project management practices: theimpactoninternationaldevelopmentprojectsofnon-governmental organizations.International Journal of Project Management,33(3), 650-663. Handschu, R., Scibor, M., Wacker, A., Stark, D. R., Köhrmann, M., Erbguth, F., ... & Marquardt, L. (2014). Feasibility of certified quality management in a comprehensive stroke care network using telemedicine: STENO project.International Journal of Stroke,9(8), 1011- 1016. Heinrich, S., Irouschek, A., Prottengeier, J., Ackermann, A., & Schmidt, J. (2015). Adverse airway events in parturient compared with non‐parturient patients. Is there a difference? Results from a quality management project.Journal of Obstetrics and Gynaecology Research,41(7), 1032-1039. Jazayeri, E., & Pajouhi, H. (2017). Relationship between Construction Project Delivery Methods and Project Performance.International Journal of Engineering Science,13615.