logo

Solar Power Plant Project Plan

   

Added on  2020-03-15

9 Pages1633 Words32 Views
 | 
 | 
 | 
PROJECTMANAGEMENT1
Solar Power Plant Project Plan_1

TABLE OF CONTENTSEXECUTIVE SUMMARY.............................................................................................................4PROJECT SCOPE...........................................................................................................................5ROLES, RESPONSIBILITIES AND AUTHORITIES..................................................................5PROJECT BASELINES..................................................................................................................5Schedule.......................................................................................................................................5Budget..........................................................................................................................................6PROJECT COMMUNICATION PLAN.........................................................................................7DOCUMENT MANAGEMENT SYSTEM....................................................................................7PROJECT RISK REGISTER..........................................................................................................7CONTRACTING AND PROCUREMENT....................................................................................8SAFETY AND ENVIRONMENTAL ISSUES...............................................................................8QUALITY ASSURANCE...............................................................................................................9COMMISSIONING STRATEGIES................................................................................................9CLOSE OUT AND FINAL DOCUMENTATION.........................................................................9REFERENCES..............................................................................................................................112
Solar Power Plant Project Plan_2

EXECUTIVE SUMMARYVictoria state government has promoted the renewable energy sector in the City Victoria.For avoiding the several environmental issues relative of coal fire station. Further, the Victorianstate government has planned the implementation of the renewable energy resources forreplacing the traditional power plant with grid which is connected to solar power plant on thecanal top by “Victoria state government”.Moreover, the state government of City Victoriawants the renewable energy resources for replacing the traditional power plant with theconnection of grid with solar power plant on the top of the canal. Moreover, the terms andconditions interrelated with this implementation of grid connected solar system comprise of thesigning of execution agreement among the nominated bidder and the state government ofVictoria. Moreover, the developer linked to solar project must do the payment for the non-refundable services associated to the implementation of project that is at the rate of 0.5 % of totalimplementation cost of grid connected solar system on the top of canal. Along with that, the totalcost of the project involves the maximum limit of $15 M which could be conversed prior to thesigning of the agreement. Lastly, the selected bidder can implement the separate executionagreement for individual projects with separate facilitation charge.3
Solar Power Plant Project Plan_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Energy Infrastructure within Melbourne
|7
|809
|391

Techno-Economic Analysis Of Solar Thermal Power Plants In Oman
|12
|3022
|10

Legal risk management Assignment
|11
|2438
|28

Water & Energy Sustainability in UAE and Australia
|10
|2193
|47

Sustainable Energy in United Kingdom
|17
|5151
|73

Investigating Energy Crisis and Proposed Solutions
|12
|2527
|98