System Analysis and Design: A Case Study of Gold Cinema
Verified
Added on  2023/01/12
|10
|2331
|38
AI Summary
This report discusses the system analysis and design process for developing an online system for Gold Cinema. It covers topics such as system development life-cycle, work breakdown structure, and use case diagram. The report also includes calculations of NPV, ROI, and payback period.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
REPORT
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents INTRODUCTION..........................................................................................................................3 MAIN BODY..................................................................................................................................3 System development life-cycle...................................................................................................3 Work breakdown structure..........................................................................................................5 Use case diagram for the GC system..........................................................................................6 CONCLUSION...............................................................................................................................6 REFERENCES................................................................................................................................8
INTRODUCTION System analysis can be termed out as complex process or operation in terms to improve its efficiency with help of applying computer system. This is called out as procedure of collecting and interpreting the facts, identifying the issues and decomposition of system into its components (Andayani and Dirawan, 2019). In addition to this, analysis can also be termed out as series of components that performs functions together and this can be termed out as the system engineering. It is defined as methodology that can be used for developing information system of high quality that integrates individuals, data and information technology to support and full-fill business requirements. Thus, it is simple technique that can be used for development of successful information relates with technology projects. In addition to this, System analysts carry the responsibilities that undertake the steps such as to researching problems, finding solutions, recommending courses of actions and coordinating with stakeholders to meet out the specified requirements. The present report is based on case study of Gold cinema that needs to develop an online system in terms to track their customers, to notify them about the upcoming events and to undertake the identification for customer who frequently uses cinema. Furthermore, report will outline the activities as to lay emphasise on system development life-cycle, work break down structure, PERT/CPM chart that aids to explain the early and late start for each task, return on investment and use the case diagram of the gold cinema online system. MAIN BODY System development life-cycle. Effective system development life-cycle can be termed out as result of the high quality system that aids to meet out the customer expectation, reaches completion within time and cost evaluation. It is termed out as the conceptual model that is inclusive of policies and procedures that helps to develop and alter system throughout their life-cycle. It is termed out as the systematic approach that assist to break down the work into phases that aids to execute new or modified information system (Badawi and et al., 2019). It is model that can be used in defining the stages that are inclusive in development of information system that can be done in terms to final testing and maintenance stage. Therefore, system development life cycle can be applied to both kind of system such as technical and non-technical. In addition to this, there are differ kind
of system and each system is varied from each other in relation to complexities, functionalities and expected solutions. Thus, stages of system development life-cycle assist in developing a system in a manner in which the risk can be linked with system identified and needs can be full- filled (Andayani and Dirawan, 2019). In this, the six procedure to the SDLC are needed to be focused for undertaking development of the Gold cinema project. In addition to this, the following six phases of the system development life-cycle are outlined as-: System planning- This is termed out as the one of the effective step that looks over the creation and development to carry out successful system. In this phase, decision can be taken in terms to exactly what is needed to be done and what are the main issues that can be resolved with help of new system (Bohnes and et al., 2019). In this manner, the analysis of GC system needs is required to be conducted so that new online system can be developed that can full-fill the main requirements of Gold cinema. System analysis- This is phase in which end user requirements of the system that are determined as well as documented. During this stage, the expectation of the client from the analysis can be analysed so that developers can have the overview of way in which system is required to developed and performed (Badawi and et al., 2019). At this step, the performance will analyse the performance of software at varied stage and make note on further requirements. System design- The one of the main purpose of system design is to transform all requirements into the detailed specification that is covering of all aspects of system. This must be also access and plan for the security risk (Duclervil and Liou, 2019). In addition to this, approval to progress to the development phase must be granted in terms to complete the design phase. In this, expanded design of oline GC can be designed with help of enhancing and finalizing all technical, physical and logical requirements of system. Implementation and deployment-With help of understanding all the requirements relates with system and specification this phase comes into picture (Hardyanto and et al., 2017). In this, the actual system development code is written and hardware configuration needed to be done. In this phase, the online GC system needs to be developed for the use of client. System testing and integration- After undertaking development, the integration process comes. Thereafter, the integration of the whole system needs to be done effectively (Ehrler, Lovis and Blondon, 2019). This testing phase can be termed out as vital role within SDLC as this assist in enhancing customer satisfaction. At the time of doing testing of the system, predicted or expected
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
outcome are compared with final outcome. After, development of final online GC system all requirements of system can be tested and analysed whether final commodity full fill all the needs of Gold cinema. System maintenance- It is final and crucial phase of the system and in this periodic maintenance of the system needs to be done in time to time manner. It is stage that is inclusive of the replacement of the old hardware and continual evaluation of the system to check whether the needs are updating or not, if its working perfectly or not (Inggi, Sugiantoro and Prayudi, 2018). Thus, any security threat is needed to focused and worked on to mitigate the issue at the initial phase. Work breakdown structure. Work breakdown structure in project management and system engineering can be defined as deliverable oriented breakdown of the project into the smaller components. It is defined as key deliverable that organise the whole team work into the manageable sections. It can be developed to establish a common understanding of project scope. This is hierarchical description of the work that can be done to accomplish the deliverable to the project. All the work or task needs to be identified or tasked within breakdown structure by estimating, scheduling and budgeting the all activities. WBS needs to be developed in relation to understand the project scope, hierarchical description of the work in which project is required to be accomplished (Inggi, Sugiantoro and Prayudi, 2018). It is one of the effective structure that can help to understand the detailed description relate with deliverables of project. This is helpful in setting few outcomes of system that collectively required to be accomplished in terms to make the project outcomes successful. Therefore, this can be stated that the well designed WBS can be helpful in maintaining the overall quality of the system that is required to be developed. Henceforth, this can be said that appropriate WBS assist to defining and describing the all the project participants in terms to make whole work meaningful and manageable.
Illustration1: Work Breakdown Structure§ 4. Calculation of NPV, ROI and payback period Net present value Computation of NPV Year Cash Benefits Annual Expenses + Development cost Cash inflows PV factor @ 10% Discounted cash inflows 19000370053000.9094818.181 29000385051500.8264256 39000377052300.7513929 49000375052500.6833586 59000373052700.6213272 Total discounted cash inflow19862 Initial investment15000 NPV (Total discounted cash inflows - initial investment)4862
Interpretation NPV represents that the project should be left with positive cash flows on measuring its present value. It shows the present value of future generated cash flows by the project. It should be accepted as the NPV of the project is positive which represents that the project is profitable. Internal Rate of Return Computation of IRR Year Cash Benefits Annual Expenses + Development cost Cash inflows 0-15000 1900037005300 2900038505150 3900037705230 4900037505250 5900037305270 Internal rate of return (IRR)22% Interpretation It is calculated for measuring the rate of return that will be generated by the project. This shows the return in terms of percentage and the return of project is 22%. It should be accepted as the return is high. Payback Period Computation of Payback period Year Cash Benefits Annual Expenses + Development cost Cash inflows Cumulative cash inflows 19000370053005300 290003850515010450 390003770523015680 490003750525020930 590003730527026200 Initial investment150000
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Payback period2 0.9 Payback period 2 year and 9 months Interpretation This shows that the project will recover its initial cost of investment in 2 year and 9 months. It will start generating profits in the second year to company therefore should be adopted. Use case diagram for the GC system. With help of the use of diagram can be defined as one of the simplest kind of UML diagram that can be mainly used for representing the user interaction with the system and this also aids to identify the relation among the users. It is one of the diagram that can be used to investigating the different kind of requirements relates with cases. It is one of the effective diagram that has been made by the end user perspective (Inggi, Sugiantoro and Prayudi, 2018). In addition to this, the main actor of the system can be termed out as the customers who be using the system to book the tickets, adminwho is handling the main functions of the system and advisor who looks over to tackle the all issues of the customers. Henceforth, this can be stated that the below drawn diagram can be used as main cases of the online GC system and this is outlined in following manner as are-;
Illustration2: Use case diagram CONCLUSION Hereby, it can be summarized that system analysis and design can be mainly used for undertaking development relate with information system. There are number of the model in the system analysis and analysis which can be used for developing the high quality system. In addition to this, it can be stated that SDLC life cycle is mainly inclusive of the six phases that assist in terms to undertaking development of high-quality system. Therefore, the assignement has also outlined the work breakdown structure relate with project in the PERT/CPM charts in terms to further assist in undertaking the evaluation of the task with early and start of the each task. By the use of diagram can be termed out as one of those UML that can aid in understanding the functionalities of the system and main users of the system needs to be defined in well and effective manner.
REFERENCES Books and Journals Andayani, D.D. and Dirawan, G.D., 2019, September. Pengembangan sistem informasi publikasi ilmiah menggunakan Model System Development Life Cycle berbasis dynamic web. InSeminar Nasional LP2M UNM. Badawi, A.M., and et al., 2019. Desain Sistem Informasi Akuntansi Untuk Pengelolaan Transaksi KeuanganDenganMetodeSystemDevelopmentLifeCyclePadaCV.Surya Admaja.eProceedings of Engineering.6(2). Bohnes, F.A., and et al., 2019. Life cycle assessments of aquaculture systems: a critical review of reported findings with recommendations for policy and system development.Reviews in Aquaculture.11(4). pp.1061-1079. Duclervil, S.R. and Liou, J.C., 2019. The Study of the Effectiveness of the Secure Software Development Life-Cycle Models in IT Project Management. In16th International Conference on Information Technology-New Generations (ITNG 2019)(pp. 91-96). Springer, Cham. Ehrler, F., Lovis, C. and Blondon, K., 2019. A mobile phone app for bedside nursing care: Design and development using an adapted software development life cycle model.JMIR mHealth and uHealth.7(4). p.e12551. Hardyanto, W., and et al., 2017. Applying an MVC Framework for The System Development LifeCyclewithWaterfallModelExtended.InJournalofPhysics:Conference Series(Vol. 824, No. 1, p. 012007). IOP Publishing. Inggi, R., Sugiantoro, B. and Prayudi, Y., 2018. Penerapan system development life cycle (sdlc) dalam mengembangkan framework audio forensik.semanTIK.4(2). pp.193-200.