Introduction
According to Larsen and Ostenfeld (2017) Suspension bridge mainly defined as a bridge type
constructed using the deck. The deck is positioned in the hung position below the parametric
suspension cables in line with the vertical suspenders. Preferably, it is important to note that the
first modern type of the suspended bridge was built in 1800s. Notably, the applications of the
simple suspensions bridges without vertical suspenders tend to have long history in line with the
analysis recorded for the mountainous parts worldwide. The suspension bridge type has
elementary cables often suspended between the existing towers. The suspended cables alongside
the vertical suspender cables necessitate the system to bear the deck weight. The process helps in
ensuring that the stability of the deck is obtained and thus, enabling the traffic crosses in long
run. Additionally, the process also aims at ensuring that the overall arrangement helps in
allowing for the leveling of the deck as well as for the clearance of the arc upward. It is
important to ensure that there is no false-work and practices during the construction of the
suspension bridge types. Subsequently, it is important to ensure that the anchoring of the
suspended cables mainly conducted and constructed at the bridge edges and this will help
transferring the tension loads to the main cables. Also, all the main cables should have the
network of continuity for the pillar sections and for the deck-level supports. Furthermore, it is
important to include the network of continued connections to the other aspects more so the
anchors and the ground. Conversely, it is important note that the connections and the support for
the roadway often regarded as the hangers. The roadway elements include rods as well as cables.
Uncertainty and the prevailing circumstances can lead to the construction and the erection of the
towers on the bluff and canyon sit edges. In such situations, roads may often be proposed to be
directed on the overall main span. Additionally, the bridge can also employ the technique of
Suspension Bridge Construction PDF_2
having two smaller spans and these must run between the highways and the pair pillars.
However, in these situations the supports for the system often provided with the truss bridge or
the suspender cables. This mainly aims at ensuring that required stability is obtained in line with
the connection. In the cases whereby latter is applied, then little arc will be manifested in the
outboard of the main cables.
Structural Analysis
There are two main forces which one must incorporate in the designing of the suspended bridge
as far as the structural analysis is concerned. These two forces include the compression as well as
tension forces. Whereas the compression forces acts on the pillars, the tension force acts on the
cables. Preferably, the structural analysis demarcates that most of the forces acting on the pillars
poses vertically downwards as well as necessitated by the main cables in terms of the stability.
Thus, the pillars utilized in the process should be made of the slender materials as indicated in
the illustration below (Nader et al. 2017, September p. 2067).
Road deck in the suspended bridge mainly held in positions via the utilization of the towers and
the suspended cables. Essentially, the weight of the overall system mainly transferred from the
towers and later on into the ground. In situations in which the assumption is taken in line with
Suspension Bridge Construction PDF_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Suspension Bridge Case Study 2022
|8
|2028
|21

(PDF) Contemporary Design-Bid-Build Model
|39
|9362
|175