This assignment delves into different construction cost estimation methods. It discusses the unit method's application in feasibility analysis based on standardized unit costs, the cubic method for calculating air volume in cubic meters, and the floor area method for determining building usage in square meters. The focus then shifts to elemental estimating, which compares design alternatives with budgets and involves detailed cost breakdowns. This method helps identify major cost drivers and facilitates economic design decisions.