Elta House Project: Electrical Installation Risk Assessment
VerifiedAdded on 2023/03/30
|7
|798
|341
Report
AI Summary
This document presents a comprehensive risk assessment and method statement for electrical installation and modification work at Elta House by DBH Electrical Services. It identifies potential hazards such as electrocution, burn injuries, tripping, fires, scaffolding collapse, falling materials, cuts, muscle injuries, eye injuries from debris, and difficulties accessing the work area. The assessment assigns risk levels based on likelihood and severity, outlining control measures to mitigate each risk. These measures include proper circuit installation, PPE usage, weather monitoring, maintaining a tidy workplace, fire safety protocols, scaffolding inspections, warning signs, restricted access, and hand protection. The method statement details the work process, including testing existing circuits, installing new circuits and lightning panels, modifying circuits, and ensuring site cleanliness. It emphasizes obtaining work permits, using warning signs, and following safety procedures to protect all personnel on site. This document underscores the importance of safety and adherence to protocols in electrical work environments.
1 out of 7











