This study focuses on the risk management of external façade cleaning or rope access on high rise buildings. It includes workplace study, aims & objectives, product value discussion, planned timeline of project, projected barriers, and learning outcomes.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: RISK ASSESSMENT STUDY PROJECT
1
Faculty of Health and Social Sciences
Bachelor of Science (Hons) Safety,
Health and Environmental Management
Module: Client Based Study

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
RISK ASSESSMENT STUDY PROJECT 2
Risk management of external façade cleaning or rope access on high rise buildings
1.0 Chapter one: Introduction
1.1 Organization Background
Everlast Group is an A3 graded construction company based in Singapore which was
found in 2008. They provide façade installation to their clients. Their work experience since then
has made them develop a competitive advantage above the other similar companies that deal
with the same construction works in the building construction industry since the company
started. Façade forms the principal front side of buildings facing the street. Everlast has
completed more than 30 projects in the past 10 years. The company has completed various
projects over these years that include projects for both public and private clients. Among these
projects include government projects such as the downtown line C926, line C927, and private
residential projects that include Northpoint City, Corals and many more that I was part of in the
construction phase.
I have worked as an employer in the company employed as a senior safety coordinator
since Jan 2013 June during which I have witnessed them implement the above mentioned
projects (Dikmen, Birgonul, and Han, 2007, p. 499). As a safety coordinator in the company I
have learnt quite many issues concerning the company which mostly involve matters to do with
risks involved in their area of specialization which is façade supply, and installation. Even with
10 years of experience in the construction sector, Everlast team is very unfamiliar with the health
and safety requirements and standards as set by the WSH ACT. However, Everlast is a company
that is Biz-Safe and OSHAS 18001 certified. Based on the increased level of risk related to
Document Page
RISK ASSESSMENT STUDY PROJECT 3
façade cleaning using ropes, the company requires safety measures to be implemented during
project implementation and maintenance. I was employed
2.0 Workplace study
The particular concern is dealing with working at height activities, as it contributed to the
majority of fatility rates in Singapore 2016. Total fatality rate was 66 and an alarming figure of
24 was from construction industry dealing with working at height (Ministry of Manpower,
2017). Working at height is very common in almost all trades. Some examples of working at
height include facade installation, plastering of external, erection of scaffold, and external
cleaning (Cooper et al. 2005, p.400). Hence, my main focus will be implementing risk
management for working at height activities. My main focus will be on external Façade cleaning.
I was employed by Everlast Group as a Workplace Safety and Health Senior Coordinator. My
duties were:
a. To assist the occupier to identify and assess the risk level: I will inspect the site for any
non-compliance and assess the existing risk assessment to ensure that the actual work
processes are in compliance according to the risk assessment.
b. To recommend reasonable, practicable measures to reduce or if possible, eliminate any
risks (Zavadskas, Turskis, and Tamošaitiene, 2010, p.39).
c. To identify, educate and advise on risks and hazards involved in the working process.
d. To assist in implementing the control measures: To conduct regular inspections to ensure
that the new control measures are implemented and followed by the workforce.
For this study:
1) I will form a risk assessment team which includes the people listed in the organizational
chart and brainstorm, discuss about work tasks that will be carried out.
Document Page
RISK ASSESSMENT STUDY PROJECT 4
2) The team and I will identify all risks and safety hazards pertaining to external façade
cleaning works on-site. The risks will be evaluated and we will come out with reasonable
and practicable control measures.
3) With that in place, implementation of the risk control measures discussed.
4) This will be made known to task supervisors, workers and everyone involved in the work
and regular work inspections would be conducted. This has to be monitored carefully to
ensure effectiveness.
5) This risk assessment will be kept for three years.
6) Risk assessment will be reviewed on a yearly basis or when an accident has occurred. It
would be revised with new information on WSH risk and any other changes would be
updated too. It would also be made available upon request hence record-keeping would
be crucial.
3.0 Aims & Objectives
The aim of the study is to successfully complete the project on time and with zero injuries
by ensuring the workforce work safely according to the risk assessment and safe work procedure,
and also to work efficiently. In overall, it is also to maximize the profits and completing the
project within the stipulated time given. The objectives of the study include:
1. Reviewing work-related risk assessments to understand the current site practices.
2. Daily inspection should be made compulsory to get a better understanding on injury rates
to further understand the root causes to such injuries.
3. Regular meetings should be held to assess the strengths and weaknesses of workplace
practices and update safety management systems to ensure that the practices are aligned
with the legislation.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
RISK ASSESSMENT STUDY PROJECT 5
3.1 Product value discussion
The main problem identified as contributing factors to the accidents in the company include time
constraints that lead to workers speedy operations. This is the case since the company wishes to
complete projects in the shortest time possible just like any other business so that cost is
minimized. Time and cost are the main constraints that exceed project timeline. When the
company wishes to compensate on time so that it cuts on cost, the workers are normally advised
to increase the pace of work. In this case, falls are bound to occur since speed and fast pace of
work tends to compromise on safety.
The other factor leading to reduced level of safety includes work carelessness, weak
ropes used in access, lack of timely replacement of safety tools and materials. This necessitates
the need to carry out risk and hazard assessment and then propose possible solutions to the
fatalities that are experienced during the cleaning of facades using access ropes. To cut down the
fatalities that are experienced in the process, it is important to have the risk assessment. The
management is also to play its role in the provision of resources that aid in avoiding these
accidents. Ropes need replacing and the safety equipment supplied most often.
4.0 Planned timeline of project
Resources
Day
1
Start the meeting with high level
leadership of Everlast group
company
To comprehend the anticipated outcome and
understand the major concerns of the company.
To apprehend the safety strategies and policies of
the company.
Day
2
Examining the prevailing risk
evaluation.
To comprehend the present control measures of the
company.
Document Page
RISK ASSESSMENT STUDY PROJECT 6
Additionally, to recognize lapses found in the risk
evaluation.
Day
2
Checking the statistics about the
accident in the company
To discover the movement of accidents and the kind
of accidents which happen regularly
Day
3
Building walk To understand employees agreement of safety
necessities.
Discover the gaps undertaken by employees/ work
procedures
Control measures
Day
4
Forum of the administration staff
To define to the management the shift and flaws
involved in the system
Day
5
Evaluating the Risk Appraisals
and Secure Work strategies To include more control methods which were
discussed with the management
Follow and obey the legal conditions
5.0 Projected barriers
There will not be any barriers in this project as this study is based on past studies and
experiences. As I have the necessary resources such as past relevant activities-based risk
assessments and other safe work procedures for this study. Communication with the workers is
unnecessary (Currie, 2003, p. 211). Also, with all the required resources with me, I would be free
from travelling around. Based on the time that I have worked in the Everlast group company I
Document Page
RISK ASSESSMENT STUDY PROJECT 7
have had the time to gain experience concerning safety matters, risk assessment and looking for
solutions related to fatalities associated with construction projects. In this case, I accumulated all
the needed data for the study as I interacted with various workers, company leaders and various
stakeholders associated with projects especially those related to façade installation. In most
cases, I relied much on recorded information regarding fatalities experienced during the previous
projects.
6.0 Learning outcome
These involve the various outcomes that are expected out of carrying out the project, after
identifying issues related and then finding possible solutions to them.
a. Learning outcome 1: Identifying potential Risk Hazards
From what I learnt while working for the company, there are various accidents that have
been occurring in the projects as they are being implemented by the workers. Mostly these come
from the fact that workers have to use ropes while cleaning fitting facades, painting on high
heights or carrying out any maintenance works on these areas. In this case the potential risk
hazards related with these works needed to be identified so that possible solutions could be
recommended for the workers and company in general (Aminbakhsh, Gunduz, and Sonmez,
2013, p.101).
I carried out a site survey on the work process to identify potential hazards and also use
previous risk assessments with the similar process to compare and assess the situation and then
came out with additional control measures to prevent of any injuries in the workplace. I also
carried out reviews on the previous fatal accidents that related to working on such high areas and
the causes before analyzing the data and then putting forth the recommendations.
b. Learning outcome 2: Clarify constraints within current framework

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
RISK ASSESSMENT STUDY PROJECT 8
Reviewing, and updating the risk assessment and safe work procedure is compulsory.
Previously, a generic set of RA & SWP documents were used. However, after the changes in the
risk assessment and safe work procedure guidelines in accordance to the updated changes in the
legal legislation under the Workplace Safety and Health Act, it would show some improvement
as it will also meet the requirements of the project (Flores-Colen, and de Brito, 2010, p. 1721).
The various constraints related to the projects included the project risks that may arise
during the implementation of a project. Working on high heights cleaning or fixing the facades
can be a high risk job for workers in the company. In this case, accidents are bound to occur and
when this happens the project can be stopped so that such problem is dealt with before the work
commences or resumes again. To avoid this, I assessed the possible causes of falls which could
include weak ropes, or failure to use safety tools such as fastened belts and unstable scaffolds.
The other expected constraint in the project would be language barrier between the
various employees and myself as a safety coordinator in the workplace. This is brought about by
different ethnic backgrounds which necessitate the need to use a common language (Chew, De
Silva, and Tan, 2004, p. 587). Based on this, I solved the problem by ensuring that I
communicated with workers using English to avoid miscommunication.
c. Learning outcome 3: synthesizing and demonstrating competencies and skills that are
needed to achieve an integrated management successfully
In the formulation of the various risk assessment solutions and recommendations to be
applied in the company, everything depended on how the management would react to them
based on their applicability level (Young, Urquhart, and Laing, 2003, p. 1129). To know about
this aspect, I knew that I had to come up with high quality solutions. In this case, I had to do
proper survey so as to obtain the best solutions ever to the fatalities that face the workers as they
Document Page
RISK ASSESSMENT STUDY PROJECT 9
clean or work on the facades. I had to find the right causes of these fatalities and then formulate
the solutions.
After the survey, I found out that these fatalities emanated from the use weak or rotten
ropes to hold themselves while working on the high areas of the facades. I found out that many
times workers fell over from such high areas for failing to fasten themselves strongly while
working. I had to come up with a recommendation to the company that involved constant
assessment of the ropes used to hold the workers and know their condition before using them for
cleaning high end areas (Perez-Monserrat, de et al. 2011, p. 301). The management needs to
make replacement of any safety tools and equipment at least once every three months or when
need arises. However, I had to explain to the workers that safety started from an individual and
should take the initiative of reporting to the management when they need these safety tools.
From the study outcome, the management was able to accept their failure to observe this
condition in the past. The safety coordinator also needs to make constant reminding to the
workers so that they know the significance of safety measures when they are cleaning the
facades. I was able to achieve this goal during the time I have worked in the company as the
safety coordinator.
d. Learning outcome 4: display initiative and resourcefulness in tackling all the practical
tasks in the occupation setting
During the time I have worked in the company as the safety coordinator, I knew that it
was my responsibility to come up with solutions to the safety challenges facing the company. In
this case, before I presented the solutions and recommendations that would lead to cutting down
accidents related to working on the facades by workers, I ensured that they worked by carrying
out pilot trials and studies so that we could find out their applicability and workability (Dikmen,
Document Page
RISK ASSESSMENT STUDY PROJECT 10
Birgonul, and Han, 2007, p. 502). I monitored the workers constantly after I identified the causes
of falls and fatalities to see whether the workers put themselves into the risk. I normally gave
them guidance and counseling about their safety, general safety during the working times and
general safety amongst themselves at all times. To ensure effective problem solving I had to
ensure that the management was involved in the whole project since there was going to be
requirement of resources such as finances. In this case I had to present to the management, a
budget for the total requirements that would help improve safety in the company. I had to assess
the company hierarchy of leadership and their responsibilities to incorporate those responsible or
heading the departments related to safety in the company. This included the finance sector in the
company responsible for releasing funds for the various needs.
Self-assessment
The self-assessment of the study involves carrying out constant evaluation of the
implementation of the given recommendation and solutions. The management needs to carry out
proper implementation of the given solutions and recommendations. These included the
management taking the responsibility of providing the workers with the necessary materials of
safety and equipment (Hadikusumo, and Rowlinson, 2002, p.505). Overall the company needs to
carry out training of its workers so that they have in place a strong and serious safety measures
implementation process. I took time to talk with the top management and explaining how the
strategy would be carried out and evaluation done to assess its effectiveness. The process
requires resources to be supplied in ensuring that the workers are safe as they clean the facades
using access ropes. The Kolb learning process involves four factors which include experience,
reflections and observations, development of ideas and testing of the ideas during practice.
Conclusion

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
RISK ASSESSMENT STUDY PROJECT 11
The study outcomes included synthesizing and demonstrating competencies and skills
that are needed to achieve an integrated management successfully, displaying
initiative and resourcefulness in tackling all the practical tasks in the occupation setting,
Clarifying constraints within current framework and Identifying potential Risk Hazards. This
includes the management taking the responsibility of providing the workers with the necessary
materials of safety and equipment. The company needs to carry out training of its workers so that
they have in place a strong and serious safety measures implementation process. I took time to
talk with the top management and explaining how the strategy would be carried out and
evaluation done to assess its effectiveness.
References
Document Page
RISK ASSESSMENT STUDY PROJECT 12
Aminbakhsh, S., Gunduz, M. and Sonmez, R., 2013. Safety risk assessment using analytic
hierarchy process (AHP) during planning and budgeting of construction projects. Journal
of safety research, 46, pp.99-105.
Chew, M.Y.L., De Silva, N. and Tan, S.S., 2004. A neural network approach to assessing
building façade maintainability in the tropics. Construction Management and
Economics, 22(6), pp.581-594.
Cooper, D.F., Grey, S., Raymond, G. and Walker, P., 2005. Project risk management guidelines:
managing risk in large projects and complex procurements (p. 400). Chichester: Wiley.
Currie, W.L., 2003. A knowledge-based risk assessment framework for evaluating web-enabled
application outsourcing projects. International Journal of Project Management, 21(3),
pp.207-217.
Dikmen, I., Birgonul, M.T. and Han, S., 2007. Using fuzzy risk assessment to rate cost overrun
risk in international construction projects. International Journal of Project
Management, 25(5), pp.494-505.
Flores-Colen, I. and de Brito, J., 2010. A systematic approach for maintenance budgeting of
buildings façades based on predictive and preventive strategies. Construction and
Building Materials, 24(9), pp.1718-1729.
Hadikusumo, B.H.W. and Rowlinson, S., 2002. Integration of virtually real construction model
and design-for-safety-process database. Automation in Construction, 11(5), pp.501-509.
Perez-Monserrat, E.M., Varas, M.J., Fort, R. and de Buergo, M.A., 2011. Assessment of
different methods for cleaning the limestone facades of the former workers Hospital of
Madrid, Spain. Studies in Conservation, 56(4), pp.298-313.
Document Page
RISK ASSESSMENT STUDY PROJECT 13
Young, M.E., Urquhart, D.C.M. and Laing, R.A., 2003. Maintenance and repair issues for stone
cleaned sandstone and granite building façades. Building and Environment, 38(9-10),
pp.1125-1131.
Zavadskas, E.K., Turskis, Z. and Tamošaitiene, J., 2010. Risk assessment of construction
projects. Journal of civil engineering and management, 16(1), pp.33-46.
1 out of 13
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]