This project is based on the consideration of building of a garage that would include the different plans for defining of the project. The use of optimistic, most likely and pessimistic durations within the project. With the help of probabilistic duration in relation to the project and the concerned finish dates, the simulations would need to be transformed that would in turn represent the duration of activities and accurate dates of performing each of the activities.