ProductsLogo
LogoStudy Documents
LogoAI Grader
LogoAI Answer
LogoAI Code Checker
LogoPlagiarism Checker
LogoAI Paraphraser
LogoAI Quiz
LogoAI Detector
PricingBlogAbout Us
logo

Application Development Project Plan

Verified

Added on  2020/05/11

|4
|1083
|137
AI Summary
This document outlines the project plan for developing an application system for a retail organization. It details the project's objectives, scope, and deliverables, including a customized application to streamline sales operations and improve data management. The plan addresses potential risks, identifies key stakeholders, establishes acceptance criteria, and utilizes the waterfall methodology for development. Specific sub-components of the plan include resource allocation, risk management, system design, development, testing, and final documentation.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Statement of Work Student Name:
Project Summary
Service Description
Deliverables
Deliverables Schedule:
The project of developing application system for the sales organization is developed for integrating the
information system and development of the improved system analysis.
Serial No. Project Deliverables Duration Start Finish
1 Project Initiation 30 days Mon 2/19/18 Fri 3/30/18
2 Project Communication Plan 19 days Tue 3/6/18 Fri 3/30/18
3 Project Risk Management Plan 14 days Tue 3/13/18 Fri 3/30/18
4 Project Planning 13 days Mon 4/2/18 Wed 4/18/18
The project is implied for forming the development of an application for the retail organization. The
application would be customized for easing the sales operations of the organization. It would be helpful for
easing the flow of operations and information. The implication of the project development would be helpful
for considering the analysis of the improved processes. The project would be used for integrating the
development of the operations and carrying out the analysis of the data management. The application
development project would require the use of technology and innovation for the integration of the existing
system and deployment of the improved processes. The application development is carried out by the use of
the improved processing and development. It is important for carrying out the involvement of the
development operations. The application would help the customers for involving the plan development and
system integration for the organizations.
The scope of the project is for the development of the effective application system for integrating the
development of the system application and alignment of the effective and improved functional analysis of
the project. The use of application system would be helpful for easing the sales operation and implying the
development of the system approved analysis and modification. The alignment of the operations would be
helpful for forming the development of the system integration and development. The requirements of the
project include the hardware and software requirements like network components, computers, equipments,
devices, storage media, and tools for testing, infrastructure, and operating system, application for running
network, testing software, program application, and running application. The working nature for the project
is IT technology based and it would form the development of the effective and improved analysis of the
project integration and management. The processes of the project would be implied for forming the
development of the waterfall methodology and implication of the effective processes. The use of the
waterfall methodology would be implied for analyzing the processes of the organization. The project plan
development would be formed for the analysis of the existing facilities and deploying the improved
processes. The sub-components of project plan are listed below,
a) Plan Development for the Project
b) Resource Plan for the Project
c) Risk Management Plan for the Project
d) Design of the System
e) Development of the System
f) Test Results for the System
g) Final Documentation

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
5 TLS System Development 58 days Thu 4/19/18 Mon 7/9/18
6 Designing of the system 16 days Thu 4/19/18 Thu 5/10/18
7 Development of the System 26 days Fri 5/11/18 Fri 6/15/18
8 Additional Function Implication 16 days Mon 6/18/18 Mon 7/9/18
9 Testing Phase 49 days Wed 4/25/18 Mon 7/2/18
10 Final Documentation and Closure 6 days Tue 7/10/18 Tue 7/17/18
The deliverables are scheduled in terms of the waterfall methodology selected and applied for the project of
application development. The implication of the improved system development would be eased for implying the
effective waterfall methodology.
Period of Performance:
The project had been scheduled for working from Mon 2/19/18 to Tue 7/17/18. Each phase has been assigned
with different working duration ranging from 3 hours a day minimum to 8 hours a day maximum.
WBS Task Name Working hours Number of hours Start Finish
1 Project Initiation 6 hours 180 hours Mon 2/19/18 Fri 3/30/18
2 Project Communication Plan 8 hours 152 hours Tue 3/6/18 Fri 3/30/18
3 Project Risk Management Plan 5 hours 70 hours Tue 3/13/18 Fri 3/30/18
4 Project Planning 7 hours 91 hours Mon 4/2/18 Wed 4/18/18
5 TLS System Development 3 hours 174 hours Thu 4/19/18 Mon 7/9/18
5.1 Designing of the system 4 hours 64 hours Thu 4/19/18 Thu 5/10/18
5.2 Development of the System 5 hours 130 hours Fri 5/11/18 Fri 6/15/18
5.3 Additional Function Implication 6 hours 96 hours Mon 6/18/18 Mon 7/9/18
5.4 Testing Phase 4 hours 196 hours Wed 4/25/18 Mon 7/2/18
6 Final Documentation and Closure 6 hours 24 hours Tue 7/10/18 Tue 7/17/18
Payment Schedule
The development of the project plan is formed for the implication of the application development project and it
would tend to involve the development of the payment scheduling plan. The project had been contracted for
working on term of fixed price contract. The payments are done at the completion of each phase that means
achieving the milestone of each phase.
The resources of the project include IT engineer, app developer, project manager, project planner, project
budgeter, documenter, database admin, system analyst, and contractor as human resources. Moreover the
project would comprise of network components, computers, equipments, devices, storage media, and tools for
testing, infrastructure, and operating system, application for running network, testing software, program
application, and running application as the material requirements.
The overall cost of the project would comprise of developing the application, salary of the project team, and
cost of the material resources used.
Sub-Contractors
The supply of the materials has been outsourced and it would include the employment of a contractor who
would supply the materials for the project. The delivery of the materials to the workshop of the organization
would be supplied by the sub contractor.
Representatives
The project team comprises of,
Name Designation Signature
<<name of the student>> Project Manager <<name of the student>>
Joseph Andrews Project Client Joseph Andrews
Lisa Heath Contractor Lisa Heath
Charlie Jones IT Engineer Charlie Jones
Document Page
SUB SECTIONS
I. Risks and Assumptions:
The factors of risk for the project of application development and implication for the sales organization are
given below,
a. Flaws in design
b. Excess Exhaustion of resources
c. Lack of database integration
The assumptions of the project are,
a. Project plan would be effective and successful in implication
b. Design would integrate well with the client’s requirements
c. Contractor would supply the materials on time
II. Stakeholders:
The involved stakeholders for the project comprises of client, IT engineer, app developer, project manager,
project planner, project budgeter, documenter, database admin, system analyst, and contractor.
III. Applicable Standards:
The project should follow the ACS code of ethics, policies, principles for the development of the application
and database implication considering the fact that it would not misuse the data provided by the customers.
IV. Acceptance Criteria:
i. Compact Project Plan
ii. Client’s requirement achieved
iii. Feasible in terms of monetary and time value
V. Special Requirements or out of scope items:
The security implication for the app developed so that the database would not be accessed for misuse from
external and the authorization function implication for ensuring no leakage of the data of the customers would
happen.
Document Page
BIBLIOGRAPHY
Boyd, J., (2013). Statement of Work (SOW) iNEMI Board Assembly TIG Board Assembly and Test Process
Optimization.
Chan, S.M., (2017). Slurry Coating System Statement of Work and Specification (No. LLNL--TR-724537).
Lawrence Livermore National Lab.(LLNL), Livermore, CA (United States).
Fiaccadori, E., Pistolesi, V., Mariano, F., Mancini, E., Canepari, G., Inguaggiato, P., Pozzato, M. & Morabito,
S., (2015). Regional citrate anticoagulation for renal replacement therapies in patients with acute kidney
injury: a position statement of the Work Group “Renal Replacement Therapies in Critically Ill Patients”
of the Italian Society of Nephrology.
Housley, R., (2016). Statement of Work for Extensions to the IETF Datatracker for Author Statistics.
Kerzner, H., (2013). Project management: a systems approach to planning, scheduling, and controlling. John
Wiley & Sons.
Schenkman, B.L., (2017). Statement of Work Electrical Energy Storage System Installation at Sandia National
Laboratories (No. SAND2017-2728R). Sandia National Laboratories (SNL-NM), Albuquerque, NM
(United States).
Wade, F.E., (2017). B827 Chemical Synthhesis Project-Industrial Control System Integration-Statement of
Work & Specification with Attachments 1-14 (No. LLNL-SR-729705). Lawrence Livermore National
Laboratory (LLNL), Livermore, CA.
Webster, R. & Blatchford, P., (2015). Worlds apart? The nature and quality of the educational experiences of
pupils with a statement for special educational needs in mainstream primary schools. British
Educational Research Journal, 41(2), pp.324-342.
1 out of 4
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]