Running head: PROJECT MANAGEMENT
PROJECT MANAGEMENT
Name of the Student:
Name of the University:
Author’s Note:
Role of the PMIS in Project Management | Report_1

PROJECT MANAGEMENT
1
Role of the PMIS:-
The PMIS plays an essential role in a project, and it is distributing into three procedures.
Work Performance Data:-
This technique is with respects to the explanations and depths made near all the effort
carried out by the project team and executives (Nigussie, 2018). These contain information about
the project actions like describing the work percentage completed substantially, mechanical and
quality performance quantity of the project, and delivering updates on the planned activities. The
WPD also contains evidence about the authentic project cost, the particular time taken to finish a
planned task so on and so forward.
Work Performance Information:-
Project Management strategy should contain a predictable collection of work
performance information. The collected evidence is vital and serves as a direction tool for
directing quality control actions and agendas. Work performance information aids in calculating
the project deliverables standing, confirming that the compulsory corrective activities are carried
out, and contributes to forming performance reports. This method donates to the proficient use of
assigned resources, supports in recognizing potential threats, and perform as a valuable project
management tool.
Work performance Report:-
These are the outcome of Control and monitor project work procedure, and performs as
an input to several dealing and controlling procedures (Castro-Maldonado et al., 2019). As the
term itself recommends, performance reports contain contradictory evidence and information