logo

Sam Bot Project - Project Management

   

Added on  2022-11-23

12 Pages2228 Words162 Views
 | 
 | 
 | 
qwertyuiopasdfghjklzxcvb
nmqwertyuiopasdfghjklzxc
vbnmqwertyuiopasdfghjklz
xcvbnmqwertyuiopasdfghj
klzxcvbnmqwertyuiopasdf
ghjklzxcvbnmqwertyuiopas
dfghjklzxcvbnmqwertyuiop
asdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwerty
uiopasdfghjklzxcvbnmqwe
rtyuiopasdfghjklzxcvbnmq
wertyuiopasdfghjklzxcvbn
mqwertyuiopasdfghjklzxcv
bnmqwertyuiopasdfghjklzx
cvbnmqwertyuiopasdfghjkl
zxcvbnmqwertyuiopasdfgh
jklzxcvbnmqwertyuiopasdf
Sam Bot Project
Project Management
5/20/2019
Sam Bot Project - Project Management_1

Sam Bot Project – Project Management
Table of Contents
Workflow Design........................................................................................................ 2
Authentication Process.............................................................................................. 2
Student Details Processing......................................................................................... 2
Project Management.................................................................................................... 2
Project Management Approach.................................................................................... 2
APM Framework..................................................................................................... 3
Envision Phase..................................................................................................... 3
Speculate Phase.................................................................................................... 7
Explore Phase...................................................................................................... 7
Adapt Phase........................................................................................................ 8
Closure Phase...................................................................................................... 8
References................................................................................................................ 9
1
Sam Bot Project - Project Management_2

Sam Bot Project – Project Management
Workflow Design
Authentication Process
Information security and privacy will be extremely essential for the Sam Bot project as the
exposure of the information set will lead to the violation of the confidentiality and privacy of
the student data.
The authentication process will be one key feature that will be involved in the system. The
user stories US1 and US2 around the student and admin login will be associated with the
feature. This is because the users will be required to be authenticated in order to make sure
that they are authorised to access the system. The authentication scheme that will be used on
the system will be multi-fold authentication system. The combination of authentication
measures, such as One-Time Passwords and Single Sign on (SSO) will be used to verify the
user identity.
Student Details Processing
The student will provide the details that will be provided at the time of log in and
authentication. The student details will be processed and the analytical tools will be used to
determine the history and patterns associated with the previous data sets present in the
database.
2
Sam Bot Project - Project Management_3

Sam Bot Project – Project Management
The response to the queries will be provided on the basis of the processing results. For
instance, the student may belong to a specific course and the query may be related with the
course. The user stories as US3, US4, and US6 will be related with this feature.
3
Sam Bot Project - Project Management_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents