logo

Software Engineering: Analysis and Design

   

Added on  2022-11-30

10 Pages1198 Words246 Views
Running head: SOFTWARE ENGINEERING: ANALYSIS AND DESIGN
Software Engineering: Analysis and Design
Name of the Student
Name of the University

SOFTWARE ENGINEERING: ANALYSIS AND DESIGN1
Table of Contents
Use Cases:........................................................................................................................................2
UML Diagram:................................................................................................................................3
Short Reflection on Learning:.........................................................................................................5
Java Code:........................................................................................................................................6
Bibliography:...................................................................................................................................9

SOFTWARE ENGINEERING: ANALYSIS AND DESIGN2
Use Cases:
The only actor of the considered scenario of the application is Passenger. The passengers
are the people who travels through the public transport in the Ballymanus city.
Purchase Move Card: This passenger buys the Move Card. The Move Card has two
types such as the Move Money and Move Pass. This use case has generalization association with
the Buy Move Money and Buy Move Pass.
Buy Move Money: It is a special card that allows users to use it until the balance ends.
The passenger purchase this card one time. It is related to Load Amount use case.
Load Amount: The load amount use case refers to the interaction of loading amount into
the Move Money cart. This use case is related to Buy Move Money use case.
Buy Move Pass: This card is best suited for a person who travels often. Because based on
the frequency of travel, the cost is reduced. The passenger purchase move pass by selecting
weeks. This use case is related to select days.
Select Days: This use case refers to the process of passenger selecting the number of days
for purchasing the move pass card.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
ITECH7201 SOFTWARE ENGINEERING: ANALYSIS AND DESIGN.
|4
|434
|29

Software Engineering: Analysis and Design
|17
|1766
|453

Software Engineering Assesment Report
|14
|1380
|12

System Analysis and Design Assignment Solved (Doc)
|11
|2120
|490

System Analysis and Design
|12
|2131
|342

Systems Analysis and Design Case Study 2022
|10
|1916
|19