Software Testing: Australian Standards and Methodologies
Verified
Added on 2023/06/07
|12
|2836
|207
AI Summary
This report discusses the Australian software testing standards and methodologies, including a comparison between AS/NZS ISO/IEC 25062:2006 and ISO 829 Software documentation standards. It also reviews and compares two testing methodologies: Test Rail and Spira Test.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running Head: SOFTWARE TESTING Software Testing Name of the Student Name of the University Author note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
2 SOFTWARE TESTING Table of Contents Software development and testing standards...................................................................................3 Introduction..................................................................................................................................3 Response to the Questions...........................................................................................................3 Questionnaire...............................................................................................................................3 Discussing differences.................................................................................................................7 Task 2...............................................................................................................................................7 Conclusion.....................................................................................................................................10 References......................................................................................................................................11
3 SOFTWARE TESTING Software development and testing standards Introduction Standards are created for checking the quality of the product, leading to the fact that a proper quality of the products are maintained and people using the product use a certified and standard product in order to stay away from any kind of fraud. This is the reason that the service management. Australian standards are set for the completion of standardization of the products and services that are provided in the course of completion of the project. This is the reason that only verified products are present in Australian market. This report will discuss about the brief methodologies of the Australian software testing standards. This report will also discuss about theterminologiespresentintheprosecutionoftheinternationalstandarddetermination methodologies. This report will also provide a brief comparison in between the data that is present in the course of Australian standards and the international standard. Response to the Questions The chosen standards that will be reviewed and compared are as follows: - AS/NZS ISO/IEC 25062:2006 Software engineering - Software product Quality Requirements and Evaluation (SQuaRE) - Common Industry Format (CIF) for usability test reports (Dunkerley, 2018) ISO 829 Software documentation standards QuestionnaireWhat is the standard name? Standard name ofAS/NZS ISO/IEC 25062:2006is Software product Quality Requirements and Evaluation. Generally they are termed as SQuaRE (Fransson, Gallant & Shanks, 2018).
4 SOFTWARE TESTING ISO 829 Softwaredocumentation standards is also known as 829 Standardfor Softwareand System TestDocumentation. Who holds the copyright for the standard? The copyright of Standard name ofAS/NZS ISO/IEC 25062:2006is protected by ISO copyright office. This is published by the Switzerland and the exact location of their office is in Case Postal 56, CH-1211, Geneva 20 (Elliott & Jeavons, 2014). ISO ISO 829 Software documentation standardshas its copyright by IEEE Std 829™- 2008 and the revision of the copyright is done from IEEE Std 829-1998. The area of the ccopyright provisioning office is located in 3 Park Avenue New York, NY 10016-5997, USA. Amongst the acknowledged contributors to the document, which universities were involved (if any)? Australian Senate Economics Reference Committee has helped in completing the projection of Australian and International Standard. This has helped in projection of the entire project and completion of the project would not have been completed. What is the scope or intent of the standard? The project deals with the progression of the previously set standard, for the completion of the data based project. The main processing of the data management helps in the processing of the standard setting of products. Main scope of the project is to describe the projection of standardsetting (McKenzie, 2018). The main scope and intend of this project is to create am in depth conceptual data regression of International as well as the Australian standard setting
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
5 SOFTWARE TESTING methodologies. This is due to the fact that the quality of the product that are being imported in their country as well as in international aspect. What are the key terms and understandings needed for the standard to be understood and applied? Key terminologies which are required for completion of project are as follows: - Usability: in case of testing the terminologies which are obligatory for accomplishment of the project quality management, the main aspect is the usability of the product. This hints to the datum that the data prosecution might be accomplished in the completion of the project. Entire process is dependent on the usability of the product (Butler & Choo, 2016). Effectiveness: Effectiveness of the project plays an important role in completion of the project. Leading to the fact that the product is processed with the effective nature of the product. In case the effective nature of the product is least then the product does not pass the quality standard test Efficiency: Efficiency of the project is one of the major check post that is accessed by the Australian as well as the international standards for seeking the importance of the project. this is the reason that implies the fact that the product does not pass the standard tests Satisfaction: Satisfaction if client after usage of the product is also one of the major factors for getting the products allowed. Context of Use: products that are processed in the standard testing, the major use that is made with help of data management has been performed with the help of usage context.
6 SOFTWARE TESTING This points to the strategic terminology that the data supervision is prepared with the help of client review Users: efficiency of the product is dependent on the users that are using the product. This leads to the fact that the standard setting of the product is completely processed with the help of the number of users using the product User scope: the need of the product is also one of the major reason for getting the permission of launching the product Goal task accessibility: Goal of the product also acts as the major permissibility check. In case the goal of the product is not very clear allowance of the process will not be present. Assistive technology: Technology that is present in the building of the product acts as one of the major quality checks. In case the technological advancement is not present in the products, the product does not pass the test (Edmonds, Cashin & Heartfield, 2016) In your own words, what does the application of the standard result in? Or in other words, what does the standard do? Main functionality of the Australian standard is to check the excellence of the product that will be launched in the market as the statistics that are contemporary scenario in the course ofinformationsisthatthequalitycheckoftheproductensurestheprojectionofdata management, leading to the fact that the quality of the product that is being launched in the market will be very efficient in nature and the product will not affect the audience in a negative way.
7 SOFTWARE TESTING Discussing differences IncaseofthetestingmethodologyofAS/NZSISO/IEC25062:2006,thetesting methodology that is used is that the documentation of the entire project is initially made, leading to the detail regarding the data administration is completed with the help of the project management. On other hand, the ISO 829 Software documentation standard deals with the processing of the product initially ad after completion of the product testing analyzing of the product with respect to the data management of the customer review. In case of ISO 829 Software documentation standard several changes are made since the processing of the product and this is one of the reason that implies the fact that the data management will be done with the altered versions whereas in case of AS/NZS ISO/IEC 25062:2006, no changes and alteration is made, and the implementation of the AS/NZS ISO/IEC 25062:2006 is made worldwide (Wells, 2015). Both the AS/NZS ISO/IEC 25062:2006 and ISO 829 Software documentation standard has the same terminologies acting as the major check post, foremost to the detail that the data management will be performed with utmost efficiency (Waddell, 2015) Task 2 2 testing methodologies that are reviewed and compared are as follows: - Test Rail Spira Test Comparison in between Test Rail and Spira Test are as follows: -
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
8 SOFTWARE TESTING In case of Spira test step by step completion of the project can be performed, leading to the fact that the data with utmost efficient management and the completion of the work can be processed with higher accuracy. Again in case of Test rail, the processing of integration along with the confluence of the products are performed and the tools that are used in this methodology are homemade and automated in nature. This is a major reason that the projection of best Rail can be performed 24/7 and the business management is much more efficient in nature. Complex procedure of creating the test run is not taken into consideration, and this testing methodology also has the ability to check the processing of the product and compare the same with the other business models. In case of Spira Testing as well as in the Test Rail testing methodology, the main focus of the methodology is to secure the product and check the dispensation of statistics administration, foremost to the fact that the data administration will be achieved with the utmost proficiency. This is the major aim that the dispensation of data management can be achieved with the help of test organizations. Another major advantage of Spira testing that is not present in the course of data management is that the Spira testing will provide the processing of data management will be done with the help of script adding and this will be performed with the help of data management. This is one of the major reason that the efficiency of Spira testing is so high but in case of Test Rail, the major advantage it enjoys is the processing of data management with the help of the estimation of the data that will be allotted to the system. This is the major reason that the accuracy of the Test Rail is lower than that of Spira testing. This leads to the fact that the data management of Spira testing is better than that of Test Rail.
9 SOFTWARE TESTING In case of Test Rail, exporting pf word is not possible which creates a major impact on the processing of the testing methodology. Where as in case of Spira testing exporting of word is possible and this is the sole reason that the testing methodology is performed with both Spira testing methodology as well as the Test Rail methodology. Creating test scenario is also one of the main advantage of Spira testing methodology but it is not possible in that the of the Test Rail testing methodology. Pricing of Spira test methodology is very well organized and the cost that is to be incurredisverywellcontrastedwiththeprocessingofthetestingmethodology.This methodology has the best in class pricing strategy and this is one of the major reason of using Spira testing. In case of using the Test Rail processing, the price that is experienced in the conclusion of the challenging methodology is also very competent in nature and this is the main reason that will incur the dispensation of testing administration. In case of Test Rail, the main prospect is that the data administration is treated with highest efficiency. This clues to the fact that the data supervision can be done with the help of least pricing strategy. Marketing strategy of Spira testing is very good. This clues to the detail that the informationthataretobesharedamongtheglobalaudienceisusedforprojectionof informations management. This leads to the fact that the clients stay informed regarding the processing of management. This is the aim that the processing of the statistics management can be done. In case of Test Rail, the main drawback that it faces is the lack of marketing that is present in the processing of the testing methodologies that are provided by the Test Rail testing Methodology Company. This is one of the major reason that the clients that are associated with the Test Rail Company, stay unaware of the functioning of the Test Rail Company. This is the reason that the expansion of Test Rail testing methodology has not been flourishing.
10 SOFTWARE TESTING Conclusion From the above report it can be concluded that the projection of the cost that is incurred in the processing of the testing methodology acts as one of the major advantage of the business processing. The quality and the specifications that are to be maintained in the products are stated in the Australian standards. This ensures the fact that the products that will be imported in Australia will have to go through a testing schema and only if the product passes all the quality check, the probation of the products are checked and the products are permitted to enter the Australian market.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
11 SOFTWARE TESTING References Bailon, C., Damas, M., Pomares, H., & Banos, O. (2018). SPIRA: an automatic system to support lower limb injury assessment.Journal of Ambient Intelligence and Humanized Computing, 1-13. Butler, A., & Choo, K. K. R. (2016). IT standards and guides do not adequately prepare IT practitioners to appear as expert witnesses: An Australian perspective.Security Journal,29(2), 306-325. Dunkerley, C. (2018). Australian input into international security standards.Australian Journal of Emergency Management, The,33(3), 13. Edmonds, L., Cashin, A., & Heartfield, M. (2016). Comparison of Australian specialty nurse standards with registered nurse standards.International nursing review,63(2), 162-179. Elliott, S., & Jeavons, M. (2014). How high was Humpty Dumpty?: Revised Australian playground equipment and surfacing standards.Every Child,20(4), 6. Fransson, G., Gallant, A., & Shanks, R. (2018). Human elements and the pragmatic approach in the Australian, Scottish and Swedish standards for newly qualified teachers.Journal of Educational Change,19(2), 243-267. Fransson, G., Gallant, A., & Shanks, R. (2018). Human elements and the pragmatic approach in the Australian, Scottish and Swedish standards for newly qualified teachers.Journal of Educational Change,19(2), 243-267. Garay, O. U., Elorrio, E. G., Rodríguez, V., Spira, C., Augustovski, F., & Pichon-Riviere, A. (2017). Single-Use Devices in Argentina: Cost Comparison Analysis of a “Re-Use”
12 SOFTWARE TESTING versus a “Single-Use” Policy for Trocars, Endocutters, Linear Cutters, and Harmonic Scalpels.Value in health regional issues,14, 89-95. MANSOUR, K., & PATTI, F. (2017). Use of mining magnetic material as filler to promote induction healing in smart road pavement applications. McKenzie, G. J. (2018). Design criteria for blast loadings in the Australian environment with special reference to controlled and uncontrolled implosions. Moon, S. (2016).Self-heating of Sulphide Ores, Transition from Stage A to B and Evaluating Reliability of UN Test Protocol(Doctoral dissertation, McGill University). Thoen, M. P., Davila Olivas, N. H., Kloth, K. J., Coolen, S., Huang, P. P., Aarts, M. G., ... & Bucher, J. (2017). Genetic architecture of plant stress resistance: multi‐trait genome‐wide association mapping.New Phytologist,213(3), 1346-1362. Waddell, M. (2015). A new era for Australian Standards General Conditions of Contract.CONSTRUCTION LAW INTERNATIONAL,10(2). Wells, L. (2015). Online pharmacies: a consumer perspective.Australian prescriber,38(6), 187. Wells, L. (2015). Online pharmacies: a consumer perspective.Australian prescriber,38(6), 187.