Stakeholder Map Analysis | Assignment

   

Added on  2019-11-19

8 Pages1804 Words247 Views
COVER PAGESTUDENT DETAILSCOURSE DETAILS
Stakeholder Map Analysis | Assignment_1
Contents1 Introduction..............................................................................................................................................32 Stakeholder map......................................................................................................................................32 Questionnaire...........................................................................................................................................52.1 Introduction statement.....................................................................................................................52.2 Questions...........................................................................................................................................53 Use case diagrams and descriptions.........................................................................................................73.2 Use case diagram...............................................................................................................................73.2 Use case description..........................................................................................................................73.3 Fully developed use case description................................................................................................8Main success scenario.........................................................................................................................8Extensions............................................................................................................................................84 References................................................................................................................................................8
Stakeholder Map Analysis | Assignment_2
1 IntroductionFor any project, there are parties that are directly involved in the project and those parties that will be involved with the project after its completion and deployment. Any of these parties has a contribution and might gain or lose depending on the overall success of the project. To model and show how the different stakeholders are involved in a project a stakeholder map diagram is used and for the stakeholders who will be the end users interacting with the system after it has been completed and deployed, a use case diagram is used (Gamma, Helm, Johnson and Vlissides, 1995).2 Stakeholder mapThe following diagram shows the stakeholder map with four quadrants comprising of the internal-operation, external-operation, internal-executive and external-executive.Figure 1: Stakeholder mapAccording to the stakeholder diagram above, there are four types of stakeholders in this project. The stakeholder map is drawn on four quadrants drawn on axis plane with two factors determining which stakeholder appears in what quadrant of the axis plane. The two determining factors are;
Stakeholder Map Analysis | Assignment_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
SYSTEM ANALYSIS AND DESIGN [Document subtitle] Contents 1 Introduction 2 2 Stakeholder map 2 2.1 Stakeholder map 3 2.1 Stakeholder map 3 2.1 Stakeholder map 3 2.1 Stakeholder map 3 2.1 Stakeholder map
|10
|1989
|277

Student Name STUDENT ID 2017 Contents 1. Stakeholder map 2 1.1 Stakeholder map 2 1.2 Stakeholder map 2 1.2 Stakeholders 3 12.1 Internal operation stakeholders 3 1.2.2 External executive stakeholders 4
|9
|1726
|193

Stakeholder Analysis - Assignment
|8
|1949
|88

My Health Record System - PDF
|9
|2046
|26

Electronic Health Record System PDF
|11
|2099
|209

Stakeholder Map 3 Interest of the Stakeholder in the Project 5 Questionnaire 6 Introduction to the Stakeholder 3 Stakeholder Map 3 Interest of the Stakeholder in the Project 5 Questionnaire 6 Stakehol
|10
|1671
|364