© 2017 Pashendale Holdings Ltd Statement of Work 1
Statement of Work
Date [insert date]
Project Name [insert project name]
Prepared by [insert your name]
Introduction/Background
Among all the available companies in the field of construction industry, PHL (Pashendale Holdings
Ltd) has successfully secured an admirable position in the whole of Australia using an enhanced website
from the previous model. This website comprises of a vast range of functions namely client provided
testimonials, new construction projects that are undertaken by the company, affiliate platform for
networking, recently updated company news along with a set of information regarding other industrial
organizations. What makes PHL stand out from other companies working on the same field is, PHL
provides the clients with a simple, adaptable and advantageous user interface for the ease of their
understanding. This also implies that the management team within the organization is customer centric.
The main fame of the PHL infrastructure does not comprise of any IT management system or
cabinet as a result of which, all the processes namely testing, designing, implementing as well as training
related to the development of the new website is done with the help of outsourcing. The core objective of
PHL is to enhance the productivity, in terms of customer services and marketing (Becker, Kugeler and
Rosemann 2013). In other words, in order to achieve new goals and make the company reach new
heights in the field of business, the CEO of the organization, namely Virna Pashendale approved the
redesigning project of the website. Since the management team of PHL is customer centric, one of their
prime tasks is to check on the customer satisfaction factors. As a result, the categorization of the website
is done with plethora of choice. The following case study analyses and takes into consideration PHL for
the purpose of designing a SOW (Statement of work).
Project Scope
In this era of technological advancements and technological inception, the scenario is aggravating
day by day as a result of which, maintaining a stable client base is becoming harder for the companies. In
such a scenario, completely terminating the use of hardcopies and implementing the use of softcopies is
the best possible approach that most of the companies are using, including Pashendale Holdings Ltd.
The lack of a proper IT infrastructure is one of the major drawbacks that PHL has. In the recent days, lack
of proper IT infrastructure within the company’s mainframe can result in severe negative consequences
for the company. In order to deal with these consequences, a redesigning plan of the website has been
devised by PHL. Previously, testing, implementation etc. required outsourcing but now, the company is
developing and modifying their own framework to deal with their personalized requirements. The core
purpose of PHL is to reconstruct the website for the purpose of enhancing customer services and the
marketing mainframe. There are a range of processes that is needed to be followed by the company in
order to successfully achieve this goal. The scope of the project involves minute planning for each and
every proposed stage, execution of the steps accordingly after which, comes the implementation stage
followed by necessary trainings for the employees to adapt to the new website (Cassidy 2016). All of the
mentioned stages are needed to be done keeping one primary factor in mind i.e., exclusion of the internal
site of PHL.
The redevelopment of the website undertaken by the concerned management team of the PHL is
with the sole purpose to hold an esteemed position within the construction field.

© 2017 Pashendale Holdings Ltd Statement of Work 2
Work Requirements
This part of the study deals with an elaborate discussion on the required tasks that are needed to
be completed with the sole purpose of successful completion of the project. According to (Cleland and
Ireland 2012) the tasks of a particular project can be defined as the steps that are needed to be followed
and what is needed to be produced in a specific manner. The work products are built by these tasks
which play a vital role in project and process management sections along with the expected outcomes
and deliverables of the project. Each and every task of a project must have a correlation with the
proposed sections.
In accordance with the provided case study of PHL in case of executing the required tasks
throughout the project phases, the contractor will be held responsible and accountable. The following
tasks will be performed for the successful completion of the project.
The Phase of Planning
Firstly, a complete and detailed plan for the project is needed to be built by the contractor which
will comprise of the WBS (Work Breakdown Structure), testing plans and schedules, training,
transition and implementation. A WBS can be referred to as a tool that is needed in order to
explain the assignments, tasks, resource requirements, acceptance criteria and the specific
deliverables in a comprehensive manner
Secondly, a systematic plan for the project is needed to be documented to the PHL management
team by the contractor in order to be reviewed thoroughly and successfully approved.
The Phase of Designing and Defining
The contractor needs to work with the PHL, hand in hand in order to collect the required materials
and constructing metrics.
The website progress is built in accordance to the requirements gathered.
Developing a website outline design for the purpose of thorough reviewing and approval by PHL.
Finishing the coding part of site development.
Presenting a complete and detailed plan of testing to the PHL team.
The entire gratification handed over by the PHL management team, needs to be incorporated
within the redesigned site by the contractor (Sousa, Almeida and Dias 2014).
Performing proper lab testing on the beta release must be done by the contractor.
Resolving any issue related to the coding or the site itself can be performed as a result of the
testing done by the contractor.
Presenting the complete detailed and compiled report on the PHL testing for review and approval
purposes.
Submitting a documented status on the updated phase, to the PHL team on a weekly basis.
The Phase of Implementation
The newly revamped and reconstructed website is to be incorporated by the contractor on the
servers of PHL.
Providing website assistance for 24/7 by the contractor, till the project has successfully ended is a
must.
Submitting a documented status update to the PHL once in a week.
The Phase of Conversion
On the basis of the approved plan, the documentation must be submitted to the PHL by the
contractor.
Submitting a closure project report to the PHL team for approval and review purposes.
Updating the checklist, for all the successfully completed tasks of the project (Gido, Clements and
Clements 2014).
On the eventual day of the project, at 11:59 the contractor has to stop providing the 24/7 web

© 2017 Pashendale Holdings Ltd Statement of Work 3
support.
Submitting an updated status in a documented form to the PHL on a weekly basis. This can be
done during a weekly meeting with the PHL management team.
Schedule/Milestones
The purpose of this section is to define the respective deliverable schedules along with the
milestones of the particular project. Since a RFP (Request for proposal) is ushered by the SOW
(Statement of work), it is obvious that every task and milestone along with the information schedule
should have a precise nature. This is because, those items have to be considered by the contractor within
their proposals (Hanna, Thomas and Swanson 2013).
In accordance with the proposed case study on PHL, the list below comprises of specific milestones that
are needed to be completed for the redesigning project of the website.
Task Finish Date
Statement Of Work/Proposal release request September 6, 2019
Review of the Contractor Selection September 7-25,
2019
Selection of Contractor September 27,
2019
Beginning of the Performance Period September 3, 2019
Designing Review for the Website September 24,
2019
Implementation Review of the Website October 14, 2019
Implementation Completion December 5, 2019
Training Completion December 12, 2019
Project Completion Review December 18, 2019
Project Closure December 25, 2019
The above tabular representation shows the statement of work being released as the first
milestone on 6th September, 2019. Soon after this, a selection review is made on the website design
contractor which lasts for almost 3 weeks, followed by the final selection of the contractor by 27th of
September, 2019. Almost a week later from the final selection of the contractor, the project begins on 3rd
September, 2019. The review of the design that is to be implemented within the website, is finalized
almost 3 weeks after the commencement of the project which is 24th September, 2019. Subsequently, the
review of website implementation is finalized after almost six weeks of commencement of the project that
is, on 14th October, 2019. The implementation process needs to be completed by 5th of December, 2019,
along with the completion of training provided to the PHL personnel by 12th December, 2019. A week
prior to the Christmas day, that is 25th December- a thorough review on the project completion is needed
to be performed with the final closure of the project dated on the Christmas eve itself i.e., 25th of
December, 2019.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Strategic Project Management- Assignment
|5
|2820
|27

Strategic Project Management Assignment (solved)
|10
|3666
|230

Redevelopment of Website for Pashendale Holdings Ltd
|8
|2386
|148

Website Redevelopment Project: Statement of Work
|6
|2663
|441

SOW of PHL's Website Development Project
|15
|3391
|150

Strategic Project Management for Website Redevelopment - Desklib
|12
|2820
|191