Status Report <24/03/2020>
Project Name Generator Installation at First Age Private School, Abuja, Nigeria
Report Prepared By Please fill
Academic Supervisor Please fill
Industry Supervisor (If Any) Please fill
Attachments Please fill
MILESTONE OVERVIEW:
ID Milestones (minimum three) Status
Baseline
Completion
Date
Expected
Completion
Date
Change?
(Yes, No,
New)
E1 Load balance calculation of the generator Completed 2/04/2020 4/04/2020 NO
E2
logistic management system
Completed 5/04/2020 9/04/2020 NO
E3 Human resource management Completed 14/04/2020 16/04/2020 NO
PROJECT STATUS SUMMARY:
Narrative Summary of Status Schedule: GREEN Budget: YELLOW Issues: RED
In order to accomplish the project as per the planning schedule, the project team will take approximately 11 weeks to complete the capstone project.
The total budget estimated for the project is $50,000. It is expected that, the human resources allocated as part of the project team will definitely
accomplish the activities on time and budget. The comments give by the professors were considered and after that the project timeline is prepared
along with the activity schedule.
both the technical and non technical aspects are important for the project therefore, the three key aspects on which main focus should be given are
load balance calculation, the logistic and the Human resource management system
PROJECT MILESTONE STATUS REVIEW:
Project Plan
ID Project Milestones Status
Baseline
Completion
Date
Expected
Completion
Date
Issues Exist
(Yes/No)
P1 Identification of technical requirements Completed 2/04/2020 4/04/2020 No
P2 Calculating the load of the generator Completed 5/04/2020 9/04/2020 No
P3 Managing the human resources of the project Completed 14/04/2020 16/04/2020 No
PLANNED ACCOMPLISHMENTS SUMMARY:
Planned accomplishments for the coming two weeks:
In this coming two weeks as per the project planning the load balance will be properly calculated before the installation of the generator. The
equipments and material are the essential components to be supplied by the vendors. Therefore, logistic management plan will be developed.
After that project team will be formed followed by the HR management norms and regulations.
The responsibilities will also be clearly distributed among the project team members. As soon as their responsibilities will be clearly distributed the
team members will come to know that within which specific time phase they need to accomplish individual activities. The feedback will be considered
after completion of each project development stage. Technical workshop and training classes will be attended by all the resources to make sure that
project objectives are met successfully.
PROJECT ISSUES SUMMARY:
ID Priority Issue Description
Impact Summary (Milestone,
Schedule Scope, Resources,
Space...)
Action Steps
1 2 Poorly developed project scope If the scope statement is not
prepared accurately then
objectives and goals will not be
clear enough to the project
associates
Development of a scope statement before
initiating the project
2 1 Lack of technical skills and knowledge Insufficient skills among the
project team associate is missed
then major design and
development failure would occur.
The developers need to arrange workshop
and on job technical and non technical
training program on electrical equipments
and their operations
3 3 Design level issues If the electric design is not Design has to be prepared based on project
PROJ6016 Project Management Capstone – Status Report
Page 1 of 2
Status Report of Generator Installation_1

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Status Report
|6
|920
|55

Project Closure and Documentation for First National Bank
|10
|1984
|69

Status Follow up Report for MIS Project Management at First National Bank
|5
|806
|35

Project Management Progress Report
|11
|1794
|282

Project Execution Review Email Hi Team
|3
|404
|467

Development of Information System in Healthcare Industry - Project Completion Review Report
|5
|1462
|368