0STRATEGIC PROJECT MANAGEMENT
Strategic Project Management
Name of Student-
Name of University-
Author’s Note-

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1STRATEGIC PROJECT MANAGEMENT
Table of Contents
Section 1: Initial Investigation.........................................................................................................1
1.1 Background Information........................................................................................................1
1.2 Organizational Chart..............................................................................................................2
1.3 Problem Area.........................................................................................................................3
1.4 System Vision Document......................................................................................................3
1.5 Work Breakdown Structure...................................................................................................4
1.6 Estimated Time and Cost.......................................................................................................4
1.7 Project undertaken by Telstra................................................................................................5
1.8 Risk Analysis Chart...............................................................................................................6
Section 2: Detailed Analysis............................................................................................................6
2.1 Project Proposal.....................................................................................................................6
2.2 Assumptions..........................................................................................................................7
2.3 Projects being considered......................................................................................................7
2.4 Project Plan............................................................................................................................8
2.5 Variance Request...................................................................................................................8
2.6 Schedule.................................................................................................................................8
2.7 Budget..................................................................................................................................11
2.8 Issues....................................................................................................................................13
2.9 Issues and Risk Log.............................................................................................................13
Document Page
2STRATEGIC PROJECT MANAGEMENT
3.0 Gantt chart...........................................................................................................................14
Section 3: Conclusion and Recommendations..............................................................................14
References......................................................................................................................................16
Appendix........................................................................................................................................16
Document Page
3STRATEGIC PROJECT MANAGEMENT
Section 1: Initial Investigation
1.1 Background Information
Telstra Communication is the leading telecommunication company in Australia and
offers the people of Australia a good range of services in communication sector. The Telstra
Communication gives a tough competition to other telecommunication companies in Australia.
In Australia, the organisation provides more than 17.7 million of mobile services, 4.9 million
voice services along with 3.6 million services of fixed broadband. Telstra in Australia is recently
undergoing a change program that will help to have a more focused customer service. Telstra is
also implementing some technology as well as content solution that helps the company to have
simple as well as easy using of their network.
Telstra also operates on some retail stores which are commonly known as Telstra Stores
in Australia. Some of the stores are directly run by the company and some of the organization are
run under licensees. There are total of 360 Telstra stores in Australia and has announced to build
100 more retail stores in next three years. A new brand was launched be Telstra in the year 2011
with a new identity colour as well as new scheme (Gad, Adamtey and Gransberg 2017). As
Telstra is a telecommunication industry, it needs to handle large amount of data for which the
organization needs to implement cloud computing the company and as the company is working
on the customer relationship management, new CRM model is also to be implemented in the
organization.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
2STRATEGIC PROJECT MANAGEMENT
1.2 Organizational Chart
Figure 1: Organizational Chart of Telstra Communication
(Source: Created by Author)
Document Page
3STRATEGIC PROJECT MANAGEMENT
The organizational chart shown above is the position of directors, management and
employees involved in the organization. The organization has a CEO and others works under the
team lead of CEO.
1.3 Problem Area
The problem that the organization face is handling the data that are involved in the
organization. As Telstra Communication is network handling company, the organization deals
with large amount of data that contains the details of the customers and the details of connection
they have. The organization needs to secure all the data in the organization for safely for which
the organization needs a system solution.
Another problem that Telstra Communication deals with is handling the customer
relationship within the organization. For having a better relationship with the customer and to
maintain them, the organization needs to implement CRM within the organization. With the
implementation of CRM, the customer handling will be made better and increase the profit in the
organization.
1.4 System Vision Document
The systems that are to be implemented in the business process of Telstra will mainly
include the following:
ď‚· PoS system (Point of sale)
ď‚· Management of customer relationship
ď‚· Implement the Enterprise Resource Planning
ď‚· Cloud setup by implementing Hadoop framework within the organization
Document Page
4STRATEGIC PROJECT MANAGEMENT
The benefits that these system will provide Telstra Communication is reducing the cost of
the business, improving the system for the users, provides high flexibility for the system that
allows the business to expand (Howarth and Greenwood 2015). The system that is to be
implemented in Telstra for increasing the customer satisfaction will provide high quality of data
environment, reduces the complexity of the processes of business and also provides Telstra to
have a high competitive advantage (Ling and Li 2019). The system that is to be implemented in
Telstra for managing its data will increasing the agility of the company, reduce the provision
time, reduce the hardware inventory, increase the productivity of the company, helps to make the
secure connection and saves cost for the IT infrastructure.
1.5 Work Breakdown Structure
Figure 2: Work Breakdown Structure for SAP and SAAS Implementation in Telstra
(Source: Created by Author)
1.6 Estimated Time and Cost
The time and schedule for completing the scope of the project is listed below:

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
5STRATEGIC PROJECT MANAGEMENT
ď‚· The time that is taken for completing the SAP implementation and SaaS implementation
in Telstra is almost 10 months that is 221 days according to the project schedule.
ď‚· The total cost of the project that will be needed to complete the implementation
$870,600.00
1.7 Project undertaken by Telstra
The projects that are not taken in to account for this project are listed below:
ď‚· Cyber Security
ď‚· Data Analytics
ď‚· Design Thinking
ď‚· Health Technology
Document Page
6STRATEGIC PROJECT MANAGEMENT
1.8 Risk Analysis Chart
Figure 3: Risk Analysis Chart for SAP and SAAS Implementation in Telstra
(Source: Created by Author)
Section 2: Detailed Analysis
2.1 Project Proposal
The project in this report states the project that Telstra wants to under taken in its recent
business process. The project deals with establishing a good customer satisfaction within the
company (Rumane 2016). The company also wants to have a secure data storing system as it
deals with large amount of data. The new system that is proposed in this project will contain the
SAP implementation along with the SaaS implementation in the company. The proposed new
system will improve all the issues that the old system was not able to serve. Implementation of
Document Page
7STRATEGIC PROJECT MANAGEMENT
SAP will help the organization improve their business processes and increase their productivity
of Telstra. The flexibility of the company will also increase because of the SAP implementation
in the organization. With the SaaS implementation, the company will be able to increase the
security of data storage for the company. With SaaS implementation, the access of data is made
easier and is securely send from a particular location to some other location.
2.2 Assumptions
For conducting the SAP implementation in Telstra, the assumptions that are to be made
are
ď‚· Scheduling: The project scheduling of the project was to be altered where the public
holidays were not taken in to considerations (Gad, Adamtey and Gransberg 2015).
ď‚· The budget of the project is to be modified according to the project specification that are
needed in the assignment.
ď‚· For conducting this Sap implementation, there is also a risk schedule, the communication
strategy, the process of change management, the quality system, and the issues as well as
the risks log needed for conducting the assignment.
For conducting the SaaS implementation, the assumptions that are to be are:
ď‚· The budget and the schedule are to be done according to the requirement of SaaS
implementation (Rumane 2017). The structure of the organization is also assumed for
conducting this project.
2.3 Projects being considered

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
8STRATEGIC PROJECT MANAGEMENT
The projects that are to be considered in this particular project are implementing SAP for
data security as well as implementing SaaS for enhancing the customer satisfaction and
implementing SAP solution that will help to store the data securely in the cloud of the system.
The scope of the project are stated below:
ď‚· The project is able to analyse the requirements of the project that are needed to
implement SaaS and SAP in Telstra (Senaratne and Ruwanpura 2016).
ď‚· This proposed system also designs the aspects of the new system.
ď‚· This project also plans about how system is to be developed as well as managed.
ď‚· Implementation of developing the new project in the system is also a scope of the project.
ď‚· This project also ensures the function of new system that has no errors.
ď‚· Deployment as well as maintenance is another part of the project that states training the
users and maintaining it.
2.4 Project Plan
The project is planned to be completed within 221 days from the starting of the project.
2.5 Variance Request
In the project, there can be variance request for completing the project. Variance request
might change the scope of the project (Rumane 2016). The changing in scope of the project
might result in changing the budget of the project, the time of the project, the objectives of the
project as well as the quality of the project.
To handle the project scope and the objective of the project, the cost of the project and
the quality of the project, project variance form is used in the company. The project variance
form helps in determining any change in the system.
Document Page
9STRATEGIC PROJECT MANAGEMENT
2.6 Schedule
Task Name Duration Start Finish
SAP and SAAS Implementation in Telstra 221 days Tue 12/03/19 Tue 14/01/20
Project Initiation 14 days Tue 12/03/19 Fri 29/03/19
Meeting with stakeholders of Telstra 2 days Tue 12/03/19 Wed 13/03/19
Gathering Requirements 5 days Thu 14/03/19 Wed 20/03/19
Analyzing the requirements 5 days Thu 21/03/19 Wed 27/03/19
Finalizing the Requirements 2 days Thu 28/03/19 Fri 29/03/19
Sign in with Telstra 0 days Fri 29/03/19 Fri 29/03/19
Designing Phase 33 days Mon 1/04/19 Wed 15/05/19
Evaluating the requirements 3 days Mon 1/04/19 Wed 3/04/19
Designing the software 15 days Thu 4/04/19 Wed 24/04/19
Designing the Architecture 15 days Thu 25/04/19 Wed 15/05/19
Finalizing the Architecture 0 days Wed 15/05/19 Wed 15/05/19
Planning Phase 29 days Thu 16/05/19 Tue 25/06/19
Planning the scope 10 days Thu 16/05/19 Wed 29/05/19
Planning the resource 5 days Thu 30/05/19 Wed 5/06/19
Estimating the Budget 5 days Thu 6/06/19 Wed 12/06/19
Assuring the Quality 5 days Thu 13/06/19 Wed 19/06/19
Develop a project Team 2 days Thu 20/06/19 Fri 21/06/19
Planning the Testing strategy 2 days Mon 24/06/19 Tue 25/06/19
Implementation phase 116 days Wed 26/06/19 Wed 4/12/19
Document Page
10STRATEGIC PROJECT MANAGEMENT
SAP Implementation 55 days Wed 26/06/19 Tue 10/09/19
Deploying the SAP 10 days Wed 26/06/19 Tue 9/07/19
Documenting the deployment 10 days Wed 10/07/19 Tue 23/07/19
Development of the System 20 days Wed 24/07/19 Tue 20/08/19
Integration of System 15 days Wed 21/08/19 Tue 10/09/19
Report Status 0 days Tue 10/09/19 Tue 10/09/19
SaaS Implementation 61 days Wed 11/09/19 Wed 4/12/19
Cloud Setup Internally 15 days Wed 11/09/19 Tue 1/10/19
Reporting the status 5 days Wed 2/10/19 Tue 8/10/19
Implementing SaaS 25 days Wed 9/10/19 Tue 12/11/19
Enterprise Application 15 days Wed 13/11/19 Tue 3/12/19
System Integration 1 day Wed 4/12/19 Wed 4/12/19
Testing Phase 19 days Thu 5/12/19 Tue 31/12/19
Determining Test Scenarios 2 days Thu 5/12/19 Fri 6/12/19
Detailing Test Schedule 4 days Mon 9/12/19 Thu 12/12/19
System Testing 5 days Fri 13/12/19 Thu 19/12/19
Testing for User Acceptance 4 days Fri 20/12/19 Wed 25/12/19
Integration Testing 4 days Thu 26/12/19 Tue 31/12/19
Summary Report 0 days Tue 31/12/19 Tue 31/12/19
Maintenance and Closing Phase 10 days Wed 1/01/20 Tue 14/01/20
Training Sessions 5 days Wed 1/01/20 Tue 7/01/20

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
11STRATEGIC PROJECT MANAGEMENT
Maintenance schedule 2 days Wed 8/01/20 Thu 9/01/20
Evaluate the final documentation 3 days Fri 10/01/20 Tue 14/01/20
Project Sign Off 0 days Tue 14/01/20 Tue 14/01/20
2.7 Budget
Task Name Cost
SAP and SAAS Implementation in Telstra $870,600.00
Project Initiation $29,120.00
Meeting with stakeholders of Telstra $4,160.00
Gathering Requirements $10,400.00
Analyzing the requirements $10,400.00
Finalizing the Requirements $4,160.00
Sign in with Telstra $0.00
Designing Phase $90,840.00
Evaluating the requirements $7,440.00
Designing the software $37,200.00
Designing the Architecture $46,200.00
Finalizing the Architecture $0.00
Planning Phase $89,320.00
Planning the scope $30,800.00
Document Page
12STRATEGIC PROJECT MANAGEMENT
Planning the resource $15,400.00
Estimating the Budget $15,400.00
Assuring the Quality $15,400.00
Develop a project Team $6,160.00
Planning the Testing strategy $6,160.00
Implementation phase $557,280.00
SAP Implementation $369,400.00
Deploying the SAP $230,800.00
Documenting the deployment $30,800.00
Development of the System $61,600.00
Integration of System $46,200.00
Report Status $0.00
SaaS Implementation $187,880.00
Cloud Setup Internally $46,200.00
Reporting the status $15,400.00
Implementing SaaS $77,000.00
Enterprise Application $46,200.00
System Integration $3,080.00
Testing Phase $84,360.00
Determining Test Scenarios $46,960.00
Detailing Test Schedule $8,800.00
System Testing $11,000.00
Document Page
13STRATEGIC PROJECT MANAGEMENT
Testing for User Acceptance $8,800.00
Integration Testing $8,800.00
Summary Report $0.00
Maintenance and Closing Phase $19,680.00
Training Sessions $9,200.00
Maintenance schedule $6,160.00
Evaluate the final documentation $4,320.00
Project Sign Off $0.00
Table 2: Budget Schedule for SaaS and SAP Implementation
2.8 Issues
The issues that are faced while handling the project is increasing the budget of the
project, increasing the time of the project. There might also be risk of unavailability of raw
materials and risk about quality of the project (Wang 2017). There are many mitigation process
of risks issues that are faced by an organization. They first needs to identify the issues that are
included in the process and then find mitigation technique for the project. The issues regarding
staffs, supplier problems, and of lack of any resources that are in their company.
2.9 Issues and Risk Log
When there is risk in a project, all the risks should be recorded in a risk log so that the
stakeholders of the project can get an idea about the risk in the system at any time they want to
(Basu 2017). The risk log helps the organization to evaluate the risks and report the risks within
the project. The risks also helps to have a proper communication within the project.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
14STRATEGIC PROJECT MANAGEMENT
3.0 Gantt chart
Section 3: Conclusion and Recommendations
Document Page
15STRATEGIC PROJECT MANAGEMENT
The above report state the details of the project that implements SaaS and SAP in the
business process of Telstra. Telstra has set a new goal of satisfying their customer as well as
increasing their security of data storage within the system. The report details the project plan that
schedules the working process of implementing SaaS and SAP in Telstra. All the risks that are
associated with the project are also discussed along with the project scope and budget include din
Telstra.
Document Page
16STRATEGIC PROJECT MANAGEMENT
References
Basu, R., 2017. Managing Quality in Projects. Routledge.
Gad, G.M., Adamtey, S.A. and Gransberg, D.D., 2015. Trends in Quality Management
Approaches to Design–Build Transportation Projects. Transportation Research Record, 2504(1),
Hosseini, S.A., Akbarpour, A., Ahmadi, H. and Aminnejad, B., 2017. Balance of cost, time, and
quality related to construction projects regarding the reinforced concrete of underground
structures using a meta-heuristic algorithm. Archives of Civil Engineering, 63(4), pp.103-121.
Howarth, T. and Greenwood, D., 2017. Construction quality management: Principles and
practice. Routledge.
Hussain, S., Fangwei, Z., Siddiqi, A., Ali, Z. and Shabbir, M., 2018. Structural Equation Model
for Evaluating Factors Affecting Quality of Social Infrastructure Projects. Sustainability, 10(5),
p.1415.
Ling, F.Y.Y. and Li, Q., 2019, February. Managing the Development & Construction of Public
Hospital Projects. In IOP Conference Series: Materials Science and Engineering(Vol. 471, No.
2, p. 022001). IOP Publishing.
Rumane, A.R., 2016. Overview of Construction Projects. In Handbook of Construction
Management (pp. 47-58). CRC Press.
Rumane, A.R., 2017. Quality management in construction projects. CRC Press.
Senaratne, S. and Ruwanpura, M., 2016. Communication in construction: a management
perspective through case studies in Sri Lanka. Architectural Engineering and Design
Management, 12(1), pp.3-18.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
17STRATEGIC PROJECT MANAGEMENT
Wang, A., 2017. Analysis on the Usage of Renewable Resource in the Contemporary Municipal
Construction Projects. DEStech Transactions on Social Science, Education and Human Science,
(icsste).
Document Page
18STRATEGIC PROJECT MANAGEMENT
Appendix