logo

CPCCBC4004A Estimating Costs for Building and Construction Projects

5 Pages889 Words460 Views
   

Estimating Costs for Building and Construction Projects (CPCCBC4004A)

   

Added on  2020-05-16

CPCCBC4004A Estimating Costs for Building and Construction Projects

   

Estimating Costs for Building and Construction Projects (CPCCBC4004A)

   Added on 2020-05-16

ShareRelated Documents
Student Name: Kultar SinghStudent id: 368734501Unit: CPCCBC4004A ed 4 - Identify and produce estimated costs for building and constructionprojectsAssessment: CPCCBC4004A - Assessment 3 - LA018092Part ATrade: Powder RoomReference: 14 Hemmings St, Penrith Item Particulars Unit Quantity Rate Cost Carpentry1 110x30mm single rebate pre primed FJ door jambset No 138 38 2 Villaboard 2400x1200x6mm No 628 168 3 5.5kg acrylic stud adhesive No 125 25 4 35mm 8g treated pine phillips head screws No 150 50 5Aquacheck plasterboard 2400x1200x10mmNo 323 69 6 8g 40mm plasterboard phillips head screws No 230 60 7 35x35x1.5mm aluminium angle 1/3m No 118 18 Ceramic Tiler1Floor TilesSM1.9x1.8 = 3.4240 137 2Wall tilesSM3.24+0.74 =3.9830 120Plumbing1 Supply and fixing of Toilet suiteNo 1650650 2Supply and fixing of shower baseNo15505503Supply and fixing of 600mm wide Vanity unitNo 1400 400 4Supply and fixing of TubNo 1300300Total to summary page 2585
CPCCBC4004A Estimating Costs for Building and Construction Projects_1
Trade: EnsuiteReference: 14 Hemmings St, Penrith Item Particulars Unit Quantity Rate Cost Carpentry135mm 8g treated pine phillips head screws No 150 50 2Aquacheck plasterboard 2400x1200x10mmNo 223 46 38g 40mm plasterboard phillips head screws No 130 30 Ceramic Tiler1Floor TilesSM(3.4x2.4) +(1.2x0.92) =9.5440 382 2Wall tilesSM(1.8x3.34) +(0.1x10.1) =7.02230 211Plumbing1 Supply and fixing of Toilet suiteNo 1650650 2Supply and fixing of shower baseNo15505503Supply and fixing of 1200mm vanity unitNo 1650650 Total to summary page 2569Trade: Bathroom To CottageReference: 14 Hemmings St, Penrith Item Particulars Unit Quantity Rate Cost Carpentry135mm 8g treated pine phillips head screws No 150 50 2Aquacheck plasterboard 2400x1200x10mmNo 223 46 38g 40mm plasterboard phillips head screws 1/1000 No 130 30 Ceramic Tiler1Floor TilesSM(3.29x3.26) =10.725404292Wall tilesSM(1.8x2.4) +0.2(3.29+3.26)= 5.6330169Plumbing1 Supply and fixing of Toilet suiteNo 1650650 2Supply and fixing of shower baseNo15505503Supply and fixing of 1200mm vanity unitNo 1650650 4Supply and fixing of 1675mm TubNo 1800800Total to summary page 3374
CPCCBC4004A Estimating Costs for Building and Construction Projects_2

End of preview

Want to access all the pages? Upload your documents or become a member.