This assignment provides a detailed analysis of Su Ying’s Noodle Bar case study. It includes work breakdown structure, to-be design activity diagram, organizational change, screen design, acceptance criteria, application architecture, report to client, agile and waterfall differences, and video transcript.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: SU YING’S NOODLE BAR
Business Analysis S1 2018 – Assignment 2
Su Ying’s Noodle Bar Case Study
Student Name:
University Name:

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1BUSINESS ANALYSIS ASSIGNMENT 2
Table of Contents
Task 2.01 Work Breakdown Structure............................................................................................2
Task 2.02 “To-be” design activity diagram.....................................................................................3
Task 2.03 Organisational change.....................................................................................................3
Task 2.04 Screen design..................................................................................................................4
Task 2.05 Acceptance Criteria.........................................................................................................5
Task 2.06 Applications Architecture...............................................................................................6
Task 2.07 Report to Client...............................................................................................................6
Task 2.08 Agile and Waterfall differences......................................................................................7
Task 2.09 Video Transcript.............................................................................................................7
Bibliography....................................................................................................................................9
Appendix - Project Journal............................................................................................................10
Document Page
2BUSINESS ANALYSIS ASSIGNMENT 2
Task 2.01 Work Breakdown Structure
Activity Duration
Developing the Work Breakdown Structure to complete the assignment 04 days
Preparing diagram for “To-be” design activity according to case study of Su
Ying’s Noodle Bar
03 days
Comparing AS-IS with To-BE process for assessing the impact of new system and
illustration on the impact on business
03 days
Developing the screen designs after analyzing the identified two must user stories 04 days
Writing the acceptance criteria for the identified user stories 02 days
Drawing of an application architecture diagram to illustrate the various interfaces 03 days
Writing the executive summary to be included for presenting report to client to
explaining the undertaken processes
02 days
Preparing the brief paper for client to present the key differences between Agile
and Waterfall model
01 day
Preparing the video for presenting it to the client as a brief report of the project 01 day
Document Page
3BUSINESS ANALYSIS ASSIGNMENT 2
Task 2.02 “To-be” design activity diagram
Task 2.03 Organisational change
The analysis of existing business operations within Su Ying’s Noodle Bar has reflected
that they are facing difficulties with their manual system. Hence, it has been decided that a new
information system along with website will prove to be beneficial for their business. The website
will help to take the orders online so that there will be no errors or mistaking of orders as the
customers will be able to see the different items before placing an order. The information system
will help to perform the business operations smoothly and efficiently. The information system
will also cater the needs of the business activities.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4BUSINESS ANALYSIS ASSIGNMENT 2
Task 2.04 Screen design
Menu list
Document Page
5BUSINESS ANALYSIS ASSIGNMENT 2
Order list
Task 2.05 Acceptance Criteria
The major acceptance criteria for the new system is the user interface that means the
users must be able to easily understand the functionality being offered by every component. The
interface must be user friendly so that users can easily operate the system and does not face
difficulty while accessing the system. The presentation of the system should be well defined and
structured so that the modules within the system can be easily understood by the users. The
security measure is also an important aspect of acceptance so proper security measure have also
to be implemented as the system will record the information of customers as well as business
related documents.
Document Page
6BUSINESS ANALYSIS ASSIGNMENT 2
Task 2.06 Applications Architecture
Task 2.07 Report to Client
The supplier selection was carried out with the help of various steps that comprise of
firstly identifying the suppliers based on requirements specification. Then the supplier selection
process was started by collecting data from the suppliers and shortlisting them on that basis.
After that, evaluation of the sample was carried out to determine feasibility of the supplier.
Technical review was done as a due diligence process and cross functional visit was made to
determine suitability of the supplier.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7BUSINESS ANALYSIS ASSIGNMENT 2
Task 2.08 Agile and Waterfall differences
The key differences that exist between the Agile and Waterfall approach is illustrated as
below:
Pros Cons
Waterfall
Approach
Simple and easily understood by the
developers.
Clear documentation of all phases
Provides high visibility to developers
No requirement of engaging customers
in later phases (Serrador and Pinto
2015)
Deadline can be easily controlled
It is rigid and does not provided
flexibility to easily change
requirements during development
phase
Identification of progress is difficult
Expensive than other approaches
(Hiekata et al. 2016)
Completion time may vary if project
assumptions are not done correctly
Agile
Approach
Focuses on team collaboration
Development is much quicker and
easier
Cost efficient and cost can be easily
managed (Komai, Saidi and Nakanishi
2016)
Involvement of customer at every step
Cost is not always predictable
Difficult to understand but suitable for
large projects
Easily development can be achieved
with the support of customers by
providing resources
Document Page
8BUSINESS ANALYSIS ASSIGNMENT 2
Task 2.09 Video Transcript
First of all, I would like to thank you for your kind consideration to give me this
opportunity to carry out your project. As we all know this project is related to Su Ying’s Noodle
Bar which is very popular in among the residents and nearby famers of Farawaytown located in
remote northern China. The increase in their reputation is attracting more and more customers so
it is getting difficult for them to handle their business operations manually. I have undertaken
this project to propose an information system along with website which help them to handle their
business operations smoothly and efficiently. So, in the first assignment I have identified the
different modules that will be included in the system and presented them with the help of use
case diagrams. I have identified the various stakeholders who will be associated with the system
and I have also conducted MoSCoW analysis to determine their requirements. A “AS-IS”
process diagram was designed to present the existing system within the business however it has
been modified in assignment as “TO-BE” design to demonstrate the process that will be followed
after implementation of the new system.
In assignment 2, I have conducted a thorough analysis of activities that are required for
fulfilling the assignment criteria and the business requirements of Su Ying’s Noddle Bar. I have
also presented discussions on the impact of new system on the business. After that, I have
developed the screen designs after analyzing the identified two must user stories from
assignment 1. Then, I have also written the acceptance criteria for the designed screens from
identified user stories. I have designed the screens using Balsamiq Mockup tool which is a
powerful tool for designing interfaces. I have also drawn the application architecture diagram
with the help of MS Visio application for the system to demonstrate the various interfaces. After
that, I was involved with writing the executive summary to be included for presenting report to
Document Page
9BUSINESS ANALYSIS ASSIGNMENT 2
client to explaining the undertaken processes. Finally, I have presented illustrations on the key
differences existing between Agile and Waterfall approach so that proper decision can be made
to select the right system development methodology. Lastly, I would like to thank you for your
kind patience and hearing.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10BUSINESS ANALYSIS ASSIGNMENT 2
Bibliography
Aitken, A., Coombs, C. and Doherty, N., 2015. Towards benefit orientated business process
modelling: a canonical action research study.
Doumeingts, G. and Browne, J. eds., 2016. Modelling techniques for business process re-
engineering and benchmarking. Springer.
Goedertier, S., Vanthienen, J. and Caron, F., 2015. Declarative business process modelling:
principles and modelling languages. Enterprise Information Systems, 9(2), pp.161-185.
Hiekata, K., Mitsuyuki, T., Goto, T. and Moser, B.R., 2016, October. Design of Software
Development Architecture Comparison of Waterfall and Agile Using Reliability Growth Model.
In ISPE TE (pp. 471-480).
Jeston, J., 2014. Business process management. Routledge.
Komai, S., Saidi, H. and Nakanishi, H., 2016. Man-Hour Comparison Between Two Methods of
Agile and Waterfall in IT System Development. INNOVATION AND MANAGEMENT,
p.1707.
Rosemann, M. and vom Brocke, J., 2015. The six core elements of business process
management. In Handbook on business process management 1 (pp. 105-122). Springer Berlin
Heidelberg.
Serrador, P. and Pinto, J.K., 2015. Does Agile work?—A quantitative analysis of agile project
success. International Journal of Project Management, 33(5), pp.1040-1051.
Document Page
11BUSINESS ANALYSIS ASSIGNMENT 2
Appendix - Project Journal
Number Date Activity Explanation Status
1 26/04/201
8
Developing the Work
Breakdown Structure to
complete the
assignment
The Work Breakdown Structure
to complete the assignment has
been completed in this
assignment by determining the
required activities.
Completed
2 30/04/201
8
Preparing diagram for
“To-be” design activity
according to case study
of Su Ying’s Noodle
Bar
The “To-be” process design
diagram has been prepared in
this assignment as per the given
case study of Su Ying’s Noodle
Bar.
Completed
3 03/05/201
8
Comparing AS-IS with
To-BE process for
assessing the impact of
new system and
illustration on the
impact on business
This activity was completed by
Comparing AS-IS with To-BE
process for assessing the impact
of new system and illustration
on the impact on business.
Completed
4 08/05/201
8
Developing the screen
designs after analyzing
the identified two must
user stories
This activity was completed by
developing the screen designs
after analyzing the identified
two must user stories.
Completed
5 10/05/201 Writing the acceptance The acceptance criteria for Completed
Document Page
12BUSINESS ANALYSIS ASSIGNMENT 2
8 criteria for the
identified user stories
identified user stories was
discussed in this activity.
6 14/05/201
8
Drawing of an
application architecture
diagram to illustrate the
various interfaces
The diagram to show the system
architecture has been developed
in this activity to illustrate the
various interfaces.
Completed
7 17/05/201
8
Writing the executive
summary to be included
for presenting report to
client to explaining the
undertaken processes
The executive summary to be
included for presenting report to
client to explaining the
undertaken processes has
prepared in this activity.
Completed
8 19/05/201
8
Preparing the brief
paper for client to
present the key
differences between
Agile and Waterfall
model
A brief paper for client has been
prepared for the client to
present the key differences
between Agile and Waterfall
model.
Completed
9 20/05/201
8
Preparing the video for
presenting it to the
client as a brief report
of the project
A video has been prepared to
provide a brief client report as
per completion of the project.
Completed
1 out of 13
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]