ProductsLogo
LogoStudy Documents
LogoAI Grader
LogoAI Answer
LogoAI Code Checker
LogoPlagiarism Checker
LogoAI Paraphraser
LogoAI Quiz
LogoAI Detector
PricingBlogAbout Us
logo

Professional Engineer Summary Statement for Desklib

Verified

Added on  2023/04/22

|5
|1680
|327
AI Summary
This document contains the competency units and elements required for the Professional Engineer assessment. It includes a brief summary of how the elements were applied in the career episodes, along with the paragraph numbers. The document covers knowledge and skill base, engineering application ability, and professional and personal attributes.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
PROFESSIONAL ENGINEER
Summary Statement
These are the competency Units and Elements. These elements must be addressed in the Summary Statement
(see Section C). If you are applying for assessment as a Professional Engineer, you will need to download this
page, complete it and lodge it with your application.
Competency Element A brief summary of how you have
applied the element
Paragraph number in the
career episode(s) where
the element is addressed
PE1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive, theory-based
understanding of the underpinning
natural and physical sciences and the
engineering fundamentals applicable to
the engineering discipline
1. I spent a lot of time to study deeply in
order to understand about the scope of
our work.
2. Normally starting stage of the project,
I studied carefully about the terms of
work scope with the tender drawing and
contract documents.
3. I started my project with the
documentation study and learn the
overall project scope of work
CE 1.3
CE 2.4
CE 3.4
PE1.2 Conceptual understanding of the
mathematics, numerical analysis,
statistics and computer and
information sciences which underpin
the engineering discipline
1. At the initial stage of the project, I plan
my work meticulously to ensure that I
am able to complete it within the
deadline given. The project management
software was utilized, and this has
helped me to complete the project in
time.
2. For terminal 4 Changi Airport project
required synchronization to a power grid.
During this process, I learnt about the
new electrical circuit drawing. I also
attended a training, to learn how to
operate the generator of the
synchronization controller
3. Tuas cable tunnel project used a new
system that could test a fuel leak
through a hydro carbon leak detector
CE 1.4
CE 2.2, CE 2.5
CE 3.6
PE1.3 In-depth understanding of
specialist bodies of knowledge within
the engineering discipline
1. During our design stage I calculated
the air flow rate according to the engine
and size of the canopy.
2. I involved in the radiographic testing
to make sure tested according to the
Specifications
3. First time I used this hydrocarbon leak
sensor. It was quite interesting during
our testing because it will differentiate
the water and the hydrocarbon
CE 1.9
CE 2.13
CE 3.14

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
substances.
PE1.4 Discernment of knowledge
development and research directions
within the engineering discipline
1. I am an ambitious in learning new
technologies to improve the efficiency of
the project
2. I understood the electrical and
mechanical design from the technical
specification
3. I had taken proactive measures to get
the qualified suppliers to ensure they
supplied good standard of products
CE 1.4
CE 2.4
CE 3.6
PE1.5 Knowledge of contextual factors
impacting the engineering discipline
1. Time delays were calculated earlier, so
there was no delay on fabrication of our
generators and fuel storage tanks.
2. Manpower is planned in accordance to
the project time frame. Sufficient
manpower decreased the time needed
to make delivery. The material and
quality of our works are well maintained
too.
3. It was passed with zero defects,
achieved by conducting the engineering
checks internally.
CE 1.5, CE 1.15
CE 2.9, CE 2.15
CE 3.14, CE 3.16
PE1.6 Understanding of the scope,
principles, norms, accountabilities and
bounds of contemporary engineering
practice in the specific discipline
1. During the factory acceptance test,
our generator system complies with the
Singapore standard SS535:2007 code of
practice of installation, operation,
maintenance, performance, construction
requirements of mains failure standby
generator systems.
2. Underground tanks are complied with
Singapore standard SS 532:2007 code of
practice for the storage of flammable
liquids and BS 2594:1975 specification
for carbon steel welded horizontal
cylindrical storage tanks
3. First time I used this hydrocarbon leak
sensor. It was quite interesting during
our testing because it will differentiate
the water and the hydrocarbon
substances
CE 1.8, CE 1.17
CE 2.13, CE 2.16
CE 3.14, CE 3.16, CE 3.19
PE2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of established
engineering methods to complex
engineering problem solving
1. I faced a major problem on getting the
drawing approval due to the changes in
the architectural drawing. Time delays
were calculated earlier, so there was no
delay on fabrication of our generators
and fuel storage tanks.
2. During the delivery we are accounted
the few major things in an account, the
major was height limit of the entrance of
CE 1.5, CE 1.16
CE 2.10
Document Page
the building. There was a bridge along
the delivery route according to the
height limit, I studied and arranged a low
bed trailer to pass by the routing.
3. There was a delay on delivery from the
customer side, generator room was not
ready. I wrote an official email to them
about the status of the generator room
and ask them to give us the exact
delivery date.
CE 3.10, CE 3.17
PE2.2 Fluent application of engineering
techniques, tools and resources
1. Testing equipment we used are
vibration meter, sound level meter, infra-
red thermometer to measure the
temperature and familiarized with the
listed testing equipment
2. There was check list on our factory
acceptance test by visual and measure
the size of the tanks on site. Our
underground tank made of carbon steel
coated with the bituminous paint, after
our fabrication we test the welding joints
by the approved radiographic test
procedure to make sure there was no
leakage.
3. Production department worked well
by catching the customer comments on
our drawing with less defects it also
reduces our time consumption.
CE 1.8
CE 2.13
CE 3.9
PE2.3 Application of systematic
engineering synthesis and design
processes
1. Our manufacturing factory is located
at the Malaysia, I travel once in a week
to check the quality of our production
with our QA/QC department. I have also
used AutoCAD software for 3D
modelling.
2. There was a bridge along the delivery
route according to the height limit, I
studied and arranged a low bed trailer to
pass by the routing. I even completed
the generator synchronization.
3. Underground storage tank was
conducted the Factory acceptance
arranged with customer and consultant
witness. I even arranged for manpower
when one of my workers was injured.
CE 1.6, CE 1.18
CE 2.10, CE 2.17
CE 3.14, CE 3.18
PE2.4 Application of systematic
approaches to the conduct and
management of engineering projects
1. I plan my work meticulously to ensure
that I am able to complete it within the
deadline given.
2. I learned the new electrical circuit
drawing and went for an operation
training of the generator synchronization
controller.
CE 1.4
CE 2.5, CE 2.17
Document Page
3. In this project we used a new system
of testing a fuel leak was hydro carbon
leak detector.
CE 3.5, CE 3.19
PE3 PROFESSIONAL AND PERSONAL ATTRIBUTES
PE3.1 Ethical conduct and professional
accountability
1. Monitor the progress of the project
according to the planned schedule with
the safety concern.
2. We organize the one new group for
safety department with safety manager,
safety coordinator and safety supervisors
to make it efficient.
3. I arranged a training for our team to
be acquainted with the safety
regulations of our working environment.
CE 1.13
CE 2.11
CE 3.4
PE3.2 Effective oral and written
communication in professional and lay
domains
1. Proper communication with the
workers till the managerial level.
2. Make it work promptly I arranged a
kick off meeting while we get the order
confirmation from the customer.
3. I created a hand over meeting with all
our department HOD and handover to
them
CE 1.13
CE 2.4
CE 3.9
PE3.3 Creative innovative and proactive
demeanor
1. During our design stage I calculated
the air flow rate according to the engine
and size of the canopy, so there was no
over heat and improve the efficiency of
the engine.
2. I developed the design team to clearly
know the customer requirement, layout
drawing to match with the approved
documents.
3. It was passed with zero defects,
achieved by conducting the engineering
checks internally
CE 1.9
CE 2.4
CE 3.14
PE3.4 Professional use and
management of information
1. The project management software
was utilized, and this has helped me to
complete the project in time.
2. I coordinate with consultant and
customer by propose the date and
sequence of testing
3. It was passed with zero defects,
achieved by conducting the engineering
checks internally.
CE 1.4
CE 2.7
CE 3.14
PE3.5 Orderly management of self, and
professional conduct
1. I have successfully completed this
project with good profit.
2. Profitably completed the project with
the given time frame, I always think
about the cost savings with good quality
CE 1.19
CE 2.18

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
of work.
3. I had a new experience to work with
the well-established company
infrastructure like Singapore power and I
complete this project profitable.
CE 3.20
PE3.6 Effective team membership and
team leadership
1. Coordinating with the site team and
the production team.
2. I arranged an internal testing and
quality check with our QA/QC team
weekly basics to increase the quality and
productivity effectively.
3. Coordinate with the Malaysia
company regarding the delivery date and
time, they arranged the transport and
delivered according to the given time
frame.
CE 1.12
CE 2.7
CE 3.11
1 out of 5
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]