Supply Chain Forecasting and Decision Analysis

10 Pages1567 Words173 Views
   

Added on  2020-01-07

Supply Chain Forecasting and Decision Analysis

   Added on 2020-01-07

BookmarkShareRelated Documents
Project Management Status ReportSupply Chain Forecasting and Decision Analysis 2015-16 CourseworkPrepared by: Date: Introduction:Project includes two cases; first case is related to Delivery system design atbullseye department store designed on delaying in warehouse for loading of trucks.Second case relates to DHL supply chain. DHL is supplying LCD’s 32 and42across the china through different transports methods having different cost. Onenvironmental issues on emission of Co2 gas they have to plan trips with minimumcost having minimum Co2 emission.Case 1: Delivery System Design at Bullseye Department Store (50%)Bullseye Department store is a discount retailer of general merchandise. Thecompany owns 50 stores, but they are supplied from a single warehouse. Most ofthe merchandise received at the warehouse arrives in trucks.Trucks are loaded by Dock which is capitalized in warehouse and operate by oneworker. There are 8 docks available in warehouse and one dock will take 30min toload one truck. When all docks are occupied new arriving trucks wait in a queueuntil one become available.Because of large chain of 50 stores but supplied from a single warehouse there isheavy load on single warehouse to entertain quickly. Bullseye also receivecomplaints from some trucking firms that deliveries are taking too long at thewarehouse. In order to mitigate this issue Bullseye has number of optionsavailable.
Supply Chain Forecasting and Decision Analysis_1
First Option:In order to minimize the time taken by trucks in warehouse is to hire an extraworker for each dock, it reduces time for each truck from 30min to 18 min but itwill cost $17 per hour extra. In order to use this option Bullseye can load approx.3.33 trucks per hour.
Supply Chain Forecasting and Decision Analysis_2
Second Option:In order to minimize the time taken by trucks in warehouse is to upgrade forkliftequipment, it reduce time for each truck from 30min to 23 min but it will cost $6per hour extra. In order to use this option Bullseye can load approx. 2.6 trucks perhour.
Supply Chain Forecasting and Decision Analysis_3