This report discusses the potential issues affecting the construction of a shopping centre project and suggests five different types of sustainable sources that can be used to complete the project. It also covers the principles of supply chain management, health and safety factors, and active or passive systems for the project. The report is relevant to the subject of environmental sustainability in the construction industry and can be useful for students studying related courses in colleges or universities.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Environmental
Sustainable
Construction &
Logistic sources
1
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Contents
INTRODUCTION...........................................................................................................................3
MAIN BODY...................................................................................................................................3
PART A...........................................................................................................................................3
Discussion on issues which can lead to higher costs or delays of the project........................3
Explanation of five different types of sustainable sources which can be used for the project5
PART B............................................................................................................................................7
Supply chain management and procurement material resources for the project....................7
Principle of health and safety factors which need to be considered for the project...............8
PART C..........................................................................................................................................10
Discussion on active or passive system for the project at design stage and its environmental
impact...................................................................................................................................10
CONCLUSION..............................................................................................................................11
REFRENCES.................................................................................................................................12
2
Document Page
INTRODUCTION
Logistics management in the construction industry refers to the process of planning
implementing controlling supply chain resources generally form the point of origin such as raw
material accumulation put a point of destiny suggest delivering goods to the accurate location or
construction site (Chamikara, Perera and Rodrigo, 2020). Logistics management please an
important role in improving bottom line in the construction industry and enhances efficiency and
productivity of the overall construction project. This report focuses on sustainable construction
and logistics sources in context of a project of constructing a shopping building. The potential
issues which can affect costs and time scale of the construction project are discussed in this
report along with different types of renewable energy or sustainable sources which can be used
for completing the project. Supply chain management and procurement of material resources for
the project are also described in this report. The principle of health and safety factors which need
to be considered for the project in production phase and identified and risks associated are
explained. passive or active system for this project and design phase is also discussed in this
report.
Overview of the shopping centre construction project
The construction project for this report is of a four thirty million pounds building
project located in east London at the back of Docklands campus. the project is to build a new
shopping centre under the time period of 36 months with the focus on minimising negative
environmental impact of the construction project.
MAIN BODY
PART A
Discussion on issues which can lead to higher costs or delays of the project
The external environment of a project can create issues in timely completion
and optimal usage of finances in constructing a building. Construction industry is considered to
be one of the primary sources of environmental pollution which showcases that there are
different environmental issues which can affect the construction of shopping centre in the present
project. There are both direct and indirect impacts of construction on environment (Coppola et.
al., 2018). Construction impacts fragile environment because of the adverse aspects associated
with construction activities such as building a shopping centre. The environmental impacts
3
Document Page
include natural resource depletion, loss of biological diversity, adverse human health due to
poor indoor air quality and noise pollution caused because of construction activities. In context
of the project of building a shopping centre the primary issues which can affect
the timely completion of the construction project related to sustainability are Land depletion
and it was impact of construction on employees. These issues can lead to accidents and health
problems on the construction site along with disturbing continuous completion of the
construction project. It is important to consider these environmental issues during the
construction of the shopping centre in order to ensure that night resources are negatively
affected work in a safe environment (Di Maria and et. al., 2020). This will
support timely completion of the project.
The primary economic factors which affected construction activities include tariff trade conflicts
inflation under eyes of cost of construction materials. In case of the project of building a
shopping centre the rising cost of hiring construction employees. The shortage of construction
employees can be contributed to Brexit because it has introduced restrictions related to travel and
employment of EU workers in UK. This is created labour shortage in UK and increase the cost of
hiring labour specifically unskilled labour. This economic factor
can affect economic completion of the construction project of building a shopping centre. It is
important to understand and determine the impact of this economic factor on the shopping centre
construction project in order to create a suitable project and hire employees in a timely
manner so that shortage of labour does not affect or delete the construction project. In addition to
this another factor which can cause dilly or budget extends in the shopping centre construction
project is changes in tariff and international trade laws after the implementation of Brexit. The
changes in construction supply chain introduced by implementation of Brexit needs to be
understood in order to my sister significance of this economic factors and take proactive
measures to reduce the negative impact of brexit on the shopping centre construction project.
Construction projects are also associated with historical issues because construction projects
affect the architectural legacy of an area and there needs to be consideration of the historical
significance of the location of construction in order to ensure that historical heritage of the region
is maintained (Goh and et. al., 2020). In context of the project of shopping centre construction
the region in which the construction project will take place is London Docklands. This area is
the riverfront in former docks in London and is located in inner eastern South East
4
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
London. The docks were formerly part of port of London at one of the world’s
largest port. After the regeneration of the document it became the mean area for commercial and
residential usage. The historical issue associated with constructing a shopping centre in this area
is that steps need to be taken so that the historical legacy associated with one of the most
important historical docks is protected.
The regeneration of the London Docklands area also led to the creation of some conflicts
between the new and old communities which is a social challenge which can impact the
construction of shopping centre in east Docklands London. The social challenge can introduce
time delays as collaboration with community is important in successfully completing a
construction project. It can also increase costs as handling social disputes conflicts and legal
action requires huge amount of financial investment which can lead to budget extensions
(Jędrzejczak and et. al., 2021). There is need to mitigate these social challenges by collaborating
with the community and understanding community problems to ensure that conflict does not
arise during construction and shopping centre is developed harmoniously. This will also support
sustainable construction of the shopping centre as the community will not be negatively affected
because of the construction project.
Explanation of five different types of sustainable sources which can be used for the project
Sustainability is one of the primary concerns in the construction industry because
construction industry main perpetrators of climate change and environmental damage. Different
sustainable sources can be used in construction of the shopping centre project in east Docklands
campus which will have a significant improvement on environmental damage caused by the
construction project. device sustainability sources which can be used for the construction project
explained below:
Industrial prefabrication of precast concrete elements can we use a source of raw material
for the shopping centre construction project. Precast concrete is a construction product produced
by casting concrete in a reusable model or form which is then cured in a controlled environment
transported to the construction site and lifted into the specific place tube used in exterior and
interior walls. This is a sustainable source for construction projects because it is 100%
recyclable in combination with steel safe sustainable earthquake resistant material (Li and et. al.,
2018). The justification for using this sustainable raw material in the construction project for
5
Document Page
building shopping centre is that it improves quality and precision and
reduces manpower requirements tremendously.
Recycled plastic can also be used for constructing the shopping centre in east Docklands
London. There are different ways between recycle plastics can be directly used for improving
sustainability in construction projects. This is because using recycled plastics in construction
projects not only improves The trend of efficient energy but it also saves space in landfills and
reduces costs to even lower level. In addition to this the usage of recycled plastic can also help
save on the cost of other materials such as wood and slate (Li, Gu and Liu,
2018). Recycled plastic can be used in different elements of constructing buildings including
roofing tiles, concrete, indoor insulation, structural lumber, windows, bricks, fences, carpeting
and floor tiles.
Another material which can be used for improving sustainability of shopping centre
constructed in east London Docklands campus is plant based Polyurethane rigid foam. This is
an eco friendly construction material because it protects against mould and pests and has longer
life span in comparison to other understandable sources of construction. The justification for
using this construction material for shopping centre in east London Docklands is that it has high
R value meaning it is high quality thermal material and waste less energy to heat or cool
homes. This will benefit the shopping centre even after construction as less energy will be used
for cooling or heating the building resulting in improving sustainability for longer time.
In addition to this, usage of solar energy in construction of shopping centre in east London
Docklands campus can also improve sustainability of the project. Solar energy in construction
projects can save significant amount of money that may be related to electricity bill and
also it usage of solar energy provides tax benefits to construction projects. These two positive
aspects associated with use of solar energy in construction projects are the justification
of adopting solar energy sources in construction of shopping centre in east London Docklands
campus.
Low emitting materials and products can also be used in construction to enhance
sustainability. This improves human health but also has a long term positive impact on
environment (Liu and et. al., 2019). Extensive range of environmental friendly products can be
used in construction including adhesives interior paints coatings sealants composite wood
flooring thermal ceilings and walls. The justification for suggesting this material to improve
6
Document Page
sustainability of the shopping centre construction project in east London Docklands campus is
that it helps gain green building credits from agencies like LEED, IGCB and GRIHA.
PART B
Supply chain management and procurement material resources for the project
In context of the construction industry supply chain is defined as a network of
autonomous or semi autonomous business forms who gained the collective responsibility
of procuring manufacturing and distributing activities associated with construction projects (Mi
and et. al., 2020). This involves procuring raw materials transforming them into immediate
goods and final products and delivering their products to consumers through distribution
system. Supply chain management describes the ways in which business forms need to manage
their supply chains to achieve strategic advantages. The focus of supply chain management in
the construction industry is synchronisation of consumer needs with raw materials and
information flows along the supply chain to create perfect balance between consumer satisfaction
and cost of the construction project. Supply chain management in the project of constructing
shopping centre in east London Docklands will support successful integration between internal
and external suppliers designers when this contractors are contractors internal and external
clients to ensure timely completion of the project. The time required for completing the
construction project of shopping centre is of 36 months well the total cost of the project is 430
million pounds. The budget of the shopping centre construction project in east London
Docklands campus is provided below:
Expenses Cost ( In £)
Architect Fees 5 million
Builder fees 4 million
Equipment Fees 58 million
Construction material 170 million
Displays and Fixtures 90 million
Electricity and lighting 38 million
Outdoor signage 12 million
Indoor signage 18 million
Roofing 13 million
7
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Costs for hiring professionals
(Excavator, structural engineer etc.)
22 million
Total 430 million
The quality of the construction project will be high as quality management techniques
will be adopted throughout the construction purchase to ensure each aspect of the project is of
high quality. Procurement is defined as the process of acquiring goods and services for
completing a construction project. The Four major types of procurements in the construction
industry are traditional procurement where do sponsored a contractor is limited only to build the
required structure. Management contacting is different type of procurement in which consultants
and contractors and specialist contractors participate to construct specific building for the
client. design and build procurement involves the same contractor designing and constructing
the project where all risks are allocated to the contractor and the responsibility of designing and
building is covered by the contractor (Oke and et. al., 2021). The final type of procurement is
joint venture or partnering in which different parties establish a working environment based on
trust mutual objectives team works and sharing risks and rewards to
ensure timely completion of the building. In context of the respective construction project the
type of procurement utilised is traditional procurement because it is simplistic and
ensures timely completion of the project. There needs to be careful approach to procurement in
the respective project of building shopping centre in east London Docklands campus because it
affects the overall quality of the project. Supplies need to be purchase cost effectively
considering factors such as timeline quality of the project and budget so that
the outcome satisfies consumer demands.
Principle of health and safety factors which need to be considered for the project
Health and safety is a significant concern in construction because construction is labour
intensive industry. Health and safety in context of the construction industry focuses on
protecting construction site workers in others from that injury disease or health delete
risks during completion of construction projects. Risk assessment is one of the most crucial
aspects of ensuring health and safety in construction site because it supports identification of
risks and help take proactive measures to reduce risks to health and safety (Siddique, Singh and
Singh, 2020). Risk assessment is defined as the systematic process of evaluating the potential
8
Document Page
risks may be involved in the construction project. The process of risk assessment for the
construction project of building a shopping centre in east London Docklands is covered below:
Identifying risk: In this part of this assessment the primary risk factors related to the
construction project identified. The primary risk associated with the health and safety in case
of the construction of shopping centre in east London Docklands campus include risks
involving height moving machinery such as vehicles and cranes, risks related to power tools
and electrical equipment and health and safety impact of excessive noise dust and vibration.
Determining risk: In this step of the risk assessment process the level of risks is
determined so That the most significant risks related to health and safety of construction site
workers can be recognised (Sokas and et. al., 2019). This step helps create suitable plans for
reducing health and safety risks as discretize possibility are identified. The high level risks
in case of the construction of shopping centre in east London Docklands include machinery
risks end the risk of excessive noise Justin vibration affecting health and safety of on
site workers.
Evaluation: The risks of the construction project are evaluated true that possible solutions
for mitigating risk can be identified. The risk of moving machinery in context of
construction of shopping centre his brother do impact of improving consistent speed through
machinery while negative impact is that moving machinery is difficult to handle and can
lead to deadly accidents on the construction site.
Planning: In this part suitable plans are constructed to mitigating and minimise risks. The
risk mitigation plan for reducing this created two moving machinery at the construction site
for building shopping centre in east London Docklands campus still transfer risks but
gaining insurance for such accidents and avoid such as but quite high quality machinery for
the construction.
Tracking: This is defined as the process of systematically tracking and evaluating
performance of risk mitigation action against suitable metrics (Udomsap and Hallinger,
2020). In case of the risk introduced by moving machinery in the construction project of
shopping centre the distracting will be completed by determining suitable metrics for such
construction accidents and measuring the impact of risk mitigation with the help of the
determined metrics.
9
Document Page
PART C
Discussion on active or passive system for the project at design stage and its environmental
impact
Passive design system involves maximum usage of natural sausage for heating cooling
and ventilation to create compatible conditions inside buildings (Di Maria and et. al., 2020). The
respective construction project would be completed with the help of passive design systems. In
case of the shopping centre best of design measures such as building orientation air sealing
continuous insulation windows and the lighting will be considered to maximise advantages gain
from natural ventilation opportunities and reduce dependence on mechanical heating and cooling
systems. This will positively impact the environment because it will reduce energy consumption
of the building and make the building sustainable for the long run. The passive design technique
which will be constructing shopping centre in east London Dock Woods campus is the use of
thermal mass insulation and glazing work to minimise unwanted heat gain and loss. This
technique for passive design system will benefit the environment as extra energy will not be
consumed for keeping the building at appropriate temperature during season change. The passive
cooling technique which will be used for the construction of the shopping centre in East London
is to emphasize cross ventilation. This will support natural environment acting as a cooling
system to keep the building cool and airy during summer. In addition to this, the passive design
technique will also be beneficial for creating an open environment which is necessary
requirement for safe and secure buildings after the COVID-19 pandemic. Optimal insulation
and wooden shutter will also be part of the passive design technique to control heat of the
building without much energy consumption. This will support sustainable construction and have
positive impact on the environment.
10
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
CONCLUSION
From the above report it is determined that construction of a sustainable building requires
understanding the political, social historical and economical issues related to construction.
Different energy sources such as recycled plastic and low emitting materials can be used to
enhance sustainability during construction project. Focus on health and safety of the onsite
workers need to be prime concern during construction project because there is high risk of
different accidents to health and safety of workers. Passive designs techniques such as optimal
insulation support sustainable construction.
11
Document Page
REFRENCES
Books and Journals
Chamikara, P. B. S., Perera, B. S. and Rodrigo, M. N., 2020. Competencies of the quantity
surveyor in performing for sustainable construction. International Journal of Construction
Management, 20(3), pp.237-251.
Coppola et. al., 2018. Binders alternative to Portland cement and waste management for
sustainable construction—Part 1. Journal of applied biomaterials & functional materials, 16(3),
pp.186-202.
Di Maria and et. al., 2020. Environmental assessment of CO2 mineralisation for sustainable
construction materials. International Journal of Greenhouse Gas Control, 93. p.102882.
Goh and et. al., 2020. Revisiting triple bottom line within the context of sustainable construction:
A systematic review. Journal of Cleaner Production, 252. p.119884.
Jędrzejczak and et. al., 2021. The role of lignin and lignin-based materials in sustainable
construction–a comprehensive review. International Journal of Biological Macromolecules, 187.
pp.624-650.
Li and et. al., 2018. Quantifying stakeholder influence in decision/evaluations relating to
sustainable construction in China–A Delphi approach. Journal of cleaner production, 173.
pp.160-170.
Li, Y., Gu, Y. and Liu, C., 2018. Prioritising performance indicators for sustainable construction
and development of university campuses using an integrated assessment approach. Journal of
cleaner production, 202. pp.959-968.
Liu and et. al., 2019. Towards sustainable construction: BIM-enabled design and planning of
roof sheathing installation for prefabricated buildings. Journal of Cleaner Production, 235.
pp.1189-1201.
Mi and et. al., 2020. Utilizing recycled aggregate concrete in sustainable construction for a
required compressive strength ratio. Journal of Cleaner Production, 276. p.124249.
Oke and et. al., 2021. Exploring the benefits of cloud computing for sustainable construction in
Nigeria. Journal of Engineering, Design and Technology.
Siddique, R., Singh, G. and Singh, M., 2018. Recycle option for metallurgical by-product (Spent
Foundry Sand) in green concrete for sustainable construction. Journal of Cleaner
Production, 172. pp.1111-1120.
Sokas and et. al., 2019. Building a sustainable construction workforce. International journal of
environmental research and public health, 16(21). p.4202.
Udomsap, A. D. and Hallinger, P., 2020. A bibliometric review of research on sustainable
construction, 1994–2018. Journal of Cleaner Production, 254. p.120073.
12
chevron_up_icon