To identify impact of sustainable construction management upon project timeline. A study on Balfour Beatty
Verified
Added on 2023/06/10
|15
|3437
|460
AI Summary
The research aims to identify the impact of sustainable construction management on project timeline. The research covers research aim, objective, methodology, anticipated findings as well as time scale and working programme.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Research Proposal (To identify the impact of sustainable construction management and its impact upon project timeline)
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents INTRODUCTION...........................................................................................................................1 Background of the research.........................................................................................................1 Rationale......................................................................................................................................1 Research Aim...............................................................................................................................4 Research Objectives.....................................................................................................................4 RESEARCH METHODOLOGY.....................................................................................................5 ANTICIPATED FINDINGS...........................................................................................................7 TIME SCALE AND WORKING PROGRAMME.........................................................................8 CONCLUSION..............................................................................................................................10 REFERENCES..............................................................................................................................11
INTRODUCTION Background of the research Sustainable construction management described as mixture of sustainable construction practices and sustainable building materials for reducing waste and its impact on environment. Many construction companies are focusing on sustainable construction due to which they faces various challenges such as higher costs of sustainable building process as well as materials, construction process technicalities, long bureaucratic processes and so on(Leoto and Lizarralde, 2019).Theproblemisidentifiedinthisresearchisbarriersinsustainableconstruction management which makes researcher to conduct the research in the topic of barriers in sustainable construction management and its impact upon project timeline in order to find effective solution in overcoming this problem which help company to perform sustainable construction. For the conducting the research on the topic Balfour Beatty organisation has been selected which is a multinational construction organisation of UK. The company is founded in 1909 by George Balfour and Andrew Beatty as well as its headquarters is located in London, England. The following research covers research aim, objective, methodology, anticipated findings as well as time scale and working programme. Rationale While conducting the research the gap is identified in literature is lack of information about impact of sustainable construction management barriers upon project time line. As the information about barriers in sustainable construction management is available through various sources but the information about its impact on project timeline is not available which creates problem for the researcher to conduct the research in appropriate manner(Burke, Parrish and El Asmar, 2018). By conducting research, researcher can effectively help in fulfilling the gap in this research. By collecting data and information from various sources researcher will effectively fulfil the gap in this research. The concept of sustainable construction management According to the view of Callian (2019), Sustainable construction management refers the environmentally-friendlystructureswhichisthecombinationofsustainableconstruction practices and sustainable materials which helps to reduce the environmental and waste impact. It is also define as the practices of using processes and creating the structures which are directly 1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
andenvironmentally responsible. The primary aim of sustainable construction is to reduce the wastematerialofindustrywhichimpactontheenvironment.Sustainableconstruction management is the term of structuring the building by using recyclable and renewable materials. It is helps to creating the environment healthy which is based on the ecological principles. Sustainable construction management responsible for overall process of building life cycle which includes operation, renovation, construction, design, deconstruction and maintenance. In other words, sustainable construction management is defined as the term of create or build the structure by using waste or recyclable materials which helps to minimize the waste production from the industry. In the opinion of Safa (2022), sustainable construction management is defined as the platform which is for green construction and sustainable practices. There are two key aspects of sustainableconstructionmanagementwhichincludesecologicalprinciplesandresources efficiency.Therearemanychallengesandissueswhichisfacedwhenconstructingthe sustainable structure, the main issues of premium cost which is over for conventional practices. It is also refers to the management which helps to construction of structure with using waste and recycle bin materials which helps to reduces the impact of environmentally impact and also the product of waste materials from the industry. SCM can be minimise through improving the resources of communication level, design charrette process and effective planning for project teams and stakeholders. In other words, it is the term of using the waste and recyclable raw materials to build the sustainable constriction of building structure. It is helps to maintain the healthy environment. How to achieve sustainable construction within the organisation. According to the view ofManavalan and Jayakrishna (2019), construction industry is the largest users of the global resources along with the contributors of pollution. It is important for the construction industry to help in building a world that help in improving the lives of future generation by using eco-friendly methods. By working sustainably, construction industry helps in meeting the demand of theexpanding population along with this support the environment in the longer term. There are many ways that help company in order to achieve sustainable construction for operating their business in smooth manner. It involves using renewable energy, using on site water treatments plants to minimise waste as well as recycling as well as building with renewable or waste materials. The other material that can companies used in order to 2
maintain sustainability are wood, recycled metals, sustainable concrete, mud bricks and wool brocks as well as straw bales. With the help of sustainable construction, there are many benefits that an organisation can gain by using sustainable and eco-friendly materials. By the use of building materials and renewable energy help country in order to fight in against with climate change In the opinion ofHall (2019), standard construction practices of construction industry are the major reason that creates water pollution, air pollution as well as waste generation because it consume regular logistics, cheap oil, large amounts of electrical energy as well as large amounts of water. This makes important for the companies to adapt sustainable construction in order to protect the environment in better manner. Sustainable construction practices are some practices that are environmentally responsible as well as resource efficient in all over the projects life cycle. By following some criteria such as enhancement of local flaura and fauna, effective and efficient use of resources, incorporation of renewable sources of energy as well as measures for pollution reduction can effectively fulfil the sustainable construction practices. By performing certainactivitiescompanycaneffectivelyimprovesustainableconstructionwithinthe organisation. The practices are smart designing methods and considerations, use of recycled or sustainable materials as well as use of harvested rainwater during construction. To analyse the impact of sustainable construction management upon project time line. According to view ofKhan and et.al. (2021), there are many kinds of barriers for sustainable construction management which includes economics cost, technology, awareness, management etc.It can be defined as the construction projects which are influence by the sustainability which includes lack of communication understanding , lack knowledge of potential benefits, institutions of research, environmental effect, lack number of systematic approach etc. the impact of these barriers on the team is there is no communication between teams, high cost of rawmaterials,badproductivity,badcommunicationetc.inotherwords,theimpactof sustainable constriction management barriers are conduct by the beginning of the construction of building. In relation to Balfour Beatty, company found many barriers in constructing the structure of their project life cycle, where the employees are not performing well according to company and there is lack of communication networks between employees. InopinionofPezeshkiandIvari(2018),theanalysistheimpactofsustainable constructionmanagement,therearemanybarriersforprojecttimelinessuchas,bad 3
communication,badproductivity,lackknowledgeaboutpotentialservices,nosystematic approach and other construction barriers. While making decision and planning for construction the structure of building, it is need to understand that there is many challenges which can face by the company. In relation to Balfour Beatty, the company faced m,any challenges and problems while making the structure of the building, where lack number of productivity, high cost of raw materials, no communication between employees, lack knowledge and information about the construction etc. in other words the impact can affect the company by economy cost, time, management, technology etc. sustainable construction management having many barriers like layout, design, capital, etc. Research Aim To identify impact of sustainable construction management upon project timeline.“A study on Balfour Beatty” Research Objectives To understand the concept of sustainable construction management To analyse how to achieve sustainable construction within the organisation. To analyse the impact of sustainable construction management upon project time line. 4
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
RESEARCH METHODOLOGY Research Methodology describes as specific techniques or procedures which helps in using, selecting, identifying, processing and analysing the data and information of the particular topic of the research in better manner(Weller and Gerhart, 2018). It involves many approaches, philosophies, data collection method, choices and many more for obtaining the data on the basis of research needs. In this research onion is uses as it classify research methodology in various topic which are described below for the research topic: Research Philosophy- It refers to a process of collection of concerned beliefs and nature of the reality which have been research. It has been classified in two categories that are positivismandinterpretivism.Inthefollowingconductedresearch,positivismresearch philosophy is used as it helps in collecting and analysing the numerical data and information of the research(Rains, Levine and Weber, 2018). This research philosophy provides freedom to the researcher to obtain data according to their choice. ResearchApproach-Itdescribedasplannedprocesswhichhelpsintestingthe hypothesis and theories in proper manner. It is divided in two parts which includes inductive and deductive approach(Gass, Loewen and Plonsky, 2021). In the following research, deductive research approach has been selected by the researcher because it helps in testing the hypothesis according to the numerical information. Thisresearch approach is cost effective which helps in analysing and understanding data and information about the research topic. Research Strategy-This described as different steps of plan and action that provide direction and guidance to the researcher to gain data on the basis of their thoughts and ideas. There are many types of research strategy in research methodology such as case study, focused group, action research, survey, observation and many more(Shkoler, 2018). In case of present research, survey research strategy has been selected by the researcher because it helps in collecting the quantitative data. This strategy refers to as cheapest strategies from other which in collecting the information about the research topic from different participants. Research Choice-This describe as important component in research methodology which helps in determining the types of research which is required to conduct the research in appropriate manner(Taguchi, 2018). The research choice is divided in two categories which includesquantitativeandqualitative.Inthecaseoffollowingconductedresearch,the quantitative method is used by the researcher which helps in analysing and collecting the 5
numerical information which are in form of facts and figures. This research choice is cost and time effective which help researcher to collect and analyse valuable information about the research. Time horizon- This described as a time period which is required for collecting the information for the research topic(Harari and Lee, 2021). This are available in two form in research methodology that are longitudinal and cross-sectional. In the present research case, the cross-sectional time horizon has been selected as it helps in collecting the information about the research topic in less time. This will also help researcher to observe various variable in short time period in order to gain accurate and valuable information. Data Collection- It described as process which helps in collecting and measuring the information in scientific manner. This are divided in two categories which includes primary and secondary method(Wennberg and Anderson, 2020). In the following research, both the data collection methods selected by the researcher as it helps in collecting the data or information from directly to the respondents as well as from the other sources also. Data analysis-This described as a tool which helps in analysing, cleaning and evaluating the raw information for gaining the valuable and useful information from it. There are several types of data analysis methods in research methodology such as frequency distribution and thematic(Smith and Zajda, 2018). In case of current research, frequency distribution data analysis method is selected by the researcher as it helps in calculating the quantitative data of the research in appropriate manner. This data analysis methods takes less time to analyse the data and gain useful information in low cost. Sampling-It described as a technique which help is collecting samples directly to whom the data is required for the research. The sampling are classified in two categories that are probability and non-probability. In the following conducted research, probability sampling is selected as it helps in taking out the sample for the equal number of the members. In this samplingmethod,sampleisselecteddirectlyfromtherespondents(Sheard,2018). This sampling methods provides equal and fair opportunity to the respondent that are selected for the research. 6
ANTICIPATED FINDINGS The anticipated findings and outcomes of the research is has been identified that sustainability is important in construction as it will be helps in improving the health of the people who will use this constructed buildings as well as it will also helps in improving the productivity of workers during the constructions by making surroundings and work environment better and protection from noise(Fatourehchi and Zarghami, 2020). There are several strategies which helps company to improve their sustainable construction management in order to overcome the challenges faced by the construction company on its absence. There are some strategies also which helps company to overcome the barriers of sustainable construction management as it will also help in protecting the timeline of the project from its effects which will help company to complete their sustainable construction on time. This will make company to focus on using sustainable material and conduct sustainable practices in order to operate their business in better manner. This will help company to overcome the challenges that may face by the company due to lack of sustainable construction management in the organisation. This will company to improve the productivity of their employees which help company in order to gain various advantages in order to operate their business in better manner. 7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
TIME SCALE AND WORKING PROGRAMME The time scale and working programme for the research has been made through Gantt Chart. A Gantt Chart is described as a kind of visualized bar chart which helps in illustrating timeline and progress of a project(Kolganov, 2021). It allows the research planner to assess the duration of a project, identify the required resources as well as lay out the order in which tasks is required to be performed. It helps team to plan their work around deadlines as well as properly allocate resources of the research. 8
9
CONCLUSION From the above mentioned report, it has been concluded that barriers in sustainable construction management creating problems for the company in order to make their construction practices sustainable which does not affects the environment. Many kind of challenges are faced by the company in the absence of sustainable construction management in the organisation. Barriers in sustainable construction management provides negative impact on the timeline as more the barriers create problem for the company as more they affects the timeline of the project. Thequantitativeresearchermethodologyisconductedinthisbycollectingprimaryand secondary data through survey method. 10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
REFERENCES Books and Journals: Fatourehchi,D.andZarghami,E.,2020.Socialsustainabilityassessmentframeworkfor managingsustainableconstructioninresidentialbuildings.Journalofbuilding engineering,32, p.101761. Burke, R.D., Parrish, K. and El Asmar, M., 2018. Environmental product declarations: Use in the architecturalandengineeringdesignprocesstosupportsustainable construction.JournalofConstructionEngineeringandManagement,144(5), p.04018026. Leoto, R. and Lizarralde, G., 2019. Challenges for integrated design (ID) in sustainable buildings.Construction Management and Economics,37(11), pp.625-642. Weller,I.andGerhart,B.,2018.Methodologicalchallengesforquantitativeresearchin comparativeHRM.InHandbookofresearchoncomparativehumanresource management. Edward Elgar Publishing. Rains, S.A., Levine, T.R. and Weber, R., 2018. Sixty years of quantitative communication research summarized: Lessons from 149 meta-analyses.Annals of the International Communication Association,42(2), pp.105-124. Gass, S., Loewen, S. and Plonsky, L., 2021. Coming of age: The past, present, and future of quantitative SLA research.Language Teaching,54(2), pp.245-258. Shkoler,O.,2018.Usingcontemporaryquantitativetechniques.InQuantitativeResearch Methods in Consumer Psychology(pp. 22-58). Routledge. Taguchi,N.,2018.Descriptionandexplanationofpragmaticdevelopment:Quantitative, qualitative, and mixed methods research.System,75, pp.23-32. Harari, L. and Lee, C., 2021. Intersectionality in quantitative health disparities research: a systematic review of challenges and limitations in empirical studies.Social Science & Medicine,277, p.113876. Wennberg, K. and Anderson, B.S., 2020. Enhancing the exploration and communication of quantitative entrepreneurship research.Journal of Business Venturing,35(3), p.105938. Smith, K. and Zajda,J., 2018. Qualitative and quantitative methodologies:A minimalist view.Education and Society,36(1), pp.73-83. Sheard, J., 2018. Quantitative data analysis. InResearch Methods: Information, Systems, and Contexts, Second Edition(pp. 429-452). Elsevier. Kolganov,O.S.,2021.ONTHETASKOFMODELINGASOFTWARELIFECYCLE BASING ON PETRI NETS. InInformation Innovative Technologies(pp. 269-271). Khan, S.A.R., and et.al., 2021. A state-of-the-art review and meta-analysis on sustainable supply chain management: Future research directions.Journal of Cleaner Production,278, p.123357. Pezeshki,Z.andIvari,S.A.S.,2018.ApplicationsofBIM:abriefreviewandfuture outline.Archives of Computational Methods in Engineering,25(2), pp.273-312. Manavalan, E. and Jayakrishna, K., 2019. A review of Internet of Things (IoT) embedded sustainablesupplychainforindustry4.0requirements.Computers&Industrial Engineering,127, pp.925-953. 11
Hall, C.M., 2019. Constructing sustainable tourism development: The 2030 agenda and the managerialecologyofsustainabletourism.JournalofSustainableTourism,27(7), pp.1044-1060. Online: Callinan, T., 2019, [Online].Available through:<https://www.fieldwire.com/blog/four-steps-for- more-sustainable-construction-management/#:~:text=Sustainable%20construction %20management%20means%20far,reduce%20waste%20and%20environmental %20impact.> Safa, M., 2022, [Online].Available through: <https://www.mdpi.com/journal/sustainability/special_issues/sustainable_construction_ management> 12