This paper applies to £ 320 million building projects located in Manchester encompassing a shopping Centre scheduled for 24 months with significant emphasis in minimizing environmental impacts through sustainable construction. It discusses sustainable energy sources and the procurement process for material resources. It evaluates the challenges of increasing renewable energy sources environmentally, economically, and culturally.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
First Name Last Name
Instructor
Course
11 December 2018
Environmental Management for Sustainable Development
This paper applies to £ 320 million building projects located in Manchester encompassing a
shopping Centre scheduled for 24 months with significant emphasis in minimizing
environmental impacts through sustainable construction. As the client’s project manager, the
following paper has been prepared to inform in specific references as guided by the questions
outline in parts A, B, and C.
Part A
i. Sustainable energy defines a kind of energy consumed at inconsequential degrees
differentiated with its stock and with realistic safety influences, predominantly
likely environmental bearings. Not all sustainable power source is supportable.
Whereas sustainable energy source is regarded as as sources of energy normally
renewable on a human timescale, sustainable clean energy must not give away the
context of receivership until inability to accommodate future need features. There
are numerous categories of adaptable wellsprings of energy, most of which
depend on sunshine. Wind and hydroelectric power are the swift upshot of
differential heating up of the Earth's surface prompting air moving about as wind
and precipitation on all sides of as the air is picked up. Solar energy is the swift
transformation of sunlight by means of collectors and panels. Biomass energy is
put away sunbeams based power confined in florae. Additional feasible power
sources that don't hinge on upon sunshine include geothermal essentialness, which
is an outcome of radioactive decay in the outside layer joined with the main
warmth of gathering the Earth, and tidal energy, which is a conversion of
gravitational energy. Four of these forms of sustainable energy that can be
adopted in this project are as discussed as below:
a) Solar power. This category of energy hinge on on the atomic mixture control
as of the epicenter of the Sun. This energy can be put together and
transformed over in a couple of countless techniques. The array is from sun

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Last Name 2
focused on water warming with sun based collectors or loft cooling with sun
oriented higher room fans for suburban use to the mind boggling innovations
of direct makeover of daylight to electrical energy operating mirrors and
boilers or photovoltaic cells.
b) Hydroelectric energy. This exploits the gravitational proficiency of hove water
that was haul up from the water masses by sun shine. It isn't exclusively
sustainable as all provisions inevitably top off besides have need of pricey
disinterring to wind up helpful o'er. At the moment, the vast widely held of
the easily reached capacities for hydroelectric dams are presently operated in
the created world. 1Hydroelectric powers is mostly recommended if other
options are not available by connecting to the hydroelectric energy power
grid.
c) Biomass is the word for energy derived from plants. This form of energy is
generally consumed wide-reaching and can be easily be adopted as energy
source in this specific project. Lamentably the most well-known is burning of
trees for cooking and warmth. This technique absolutions abundant levels of
carbon dioxide gases into the climate besides is a worth mentioning cause of
uninvited air in significant expanses around the world. A ration of the further
present-day varieties of biomass energy include methane age in addition to
manufacture of alcohol for automobile fuel as well as energizing electric
power plants. The latter is recommended in this project design to ensure
sustainable renewable energy and being environmentally friendly.
d) Hydrogen and power devices. These are likewise not exclusively sustainable
power basis resources nevertheless moderately are extremely inexhaustible in
ease of access besides are abridged in pollution if used. Hydrogen can be
singed as a fuel, typically in a autos, using just H2O as the item for
1 Hydroelectric powers is mostly recommended if other options are not available by connecting to the
hydroelectric energy power grid
Document Page
Last Name 3
consumption of combustion2. This impeccable unbearable fuel be able to
mean a critical diminution of contagion in municipal communities. If not the
hydrogen be able to be consumed in energy units, similar to batteries, to
mechanism an electric engine(s) and systems. In whichever instance huge
conception of hydrogen call for copious power. Few auspicious strategies to
generate hydrogen, for instance, solar power, capable of modifying this
facsimile radically.
ii. The key favorable position of renewables is that they are free of direct
contamination and carbon emanations. Given worry over an unnatural weather
change caused via carbon emanations, there are considerable arrangement
endeavors to increment sustainable infiltrations. The reason for this section of the
paper is to layout and assess the difficulties introduced by expanding infiltrations
of inexhaustible power age environmentally, economically as well as culturally.
These age sources fundamentally incorporate sun based and wind which are
developing quickly and are sufficiently new to the framework that the effect of
high ingresses isn't completely comprehended. The3 inherent idea of sun oriented
and wind control is probably going to show more prominent framework
challenges than "customary" sources. Considering these limits, those challenges
can be survived, however at an expense. The challenges are discussed in the
following 3 subject areas/ perspectives:
a) Environmentally.
Worldwide financial, statistic and ecological megatrends have expanded
association among nations, however with no proportionate reinforcing of
worldwide administration. Subsequently, worldwide macroeconomic irregular
characteristics, transient weights and ecological difficulties are deficiently
tended to, and emergencies happen with expanding recurrence. In the
meantime, nations with developing introduction and interlinkages progress
toward becoming increasingly defenseless against such outer stuns, and
2 Hydrogen can be singed as a fuel, normally in a vehicle, with just water as the product of combustion
3 The inherent idea of sun oriented and wind control is probably going to show more prominent framework
challenges than "customary" sources
Document Page
Last Name 4
emergencies spread all the more rapidly, compromising advancement
advance. While development has quickened in numerous creating nations,
regularly it has been non-comprehensive, neglecting to make adequate work
openings and intensifying imbalances. The union of significant worth chains
and the related deceleration of exchange development may render the
execution of sustainable development techniques considerably progressively
troublesome in the years ahead. Populace elements will likewise force extra
weights on nearby administrations and quickly developing urban communities
and national wellbeing and training frameworks. Quick maturing in various
nations, specifically, will require further interests in sustainability
frameworks. The steadiness of imbalances, regardless of whether in salaries,
or in access to administrations, land or innovation.
b) Economically.
The way that huge stores of non-renewable energy sources are as yet
accessible blocks the eagerness to give adequate significance to the
renewables. Petroleum derivatives get multiple times more in endowments
than sustainable power sources. In their opposition with develop non-
renewable energy source and atomic innovations, renewables experience
significant difficulties to commercialization, including immature framework
and absence of economies of scale. Furthermore, the joining and mix of
various energy sources from a market, approach and specialized points of
view are ending up all the more difficult and requiring capacity to building.
4The achievement of conveying new innovations relies upon the capacity to
construct, screen and keep up energy foundation, also train researchers,
leaders and producers at household and worldwide dimensions. This has
therefore slowed down sustainable energy production and provision. For
developing nations, particularly, costs and the absence of sound approaches
are a portion of the fundamental hindrances. Start-up consumptions, the
4 The achievement of conveying new innovations relies upon the capacity to construct, screen and keep up energy
foundation, also train researchers, leaders and producers at household and worldwide dimensions

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Last Name 5
absence of ways to deal with parity value incongruities among renewables and
petroleum products, and general basic snags.
c) Culturally.
Eminently, the presentation of renewables presents an issue of imbalance. The
issue is that the rate of innovation dispersion, the accessibility of financing
and strategy usage are uneven inside and over nations' national limits.
Imbalances among rustic and urban zones and also inside urban territories
have been highlights of improvement and urbanization in developing nations.
5The disparity among rich and poor neighborhoods can suggest noteworthy
contrasts in access to openings for work and fundamental open
administrations. As a result, numerous urban occupants in developing nations
experience the ill effects of ecological wellbeing issues related to deficient
access to clean water, sewerage administrations, and strong waste transfer. In
numerous urban communities of developing countries, sufficient water and
sanitation administrations are fundamentally diverted to upper-and working
class neighborhoods, while low-salary neighborhoods frequently rely upon
inaccessible and hazardous water wells and private water sellers who charge
more expensive rates than general society rate for water conveyance. Poor
people frequently live in exceedingly packed residences in shacks which need
essential framework and administrations. 6Sustainable energy in the long run
seems unaffordable and not a priority hence people continue to adopt the most
available and familiar energy sources which in most cases include non-
sustainable energy sources.
Part B
I. The purchasing process essentially will encompass the following components:
5 The disparity among rich and poor neighborhoods can suggest noteworthy contrasts in access to openings for
work and fundamental open administrations
6 Sustainable energy in the long run seems unaffordable and not a priority hence people continue to adopt the
most available and familiar energy sources which in most cases include non-sustainable energy sources.
Document Page
Last Name 6
Figure 1. Purchasing process.
The process summaries into four essential stages namely; 7identification and/ or
anticipation of required services and materials; evaluation of potential suppliers;
identification of specific supplier(s) for the required material(s) and services(s); and
lastly exchange of purchase requirements. In detail, the procurement of material
resources, supply chain and the purchasing process for this project is discussed in the
following subheadings:
a) Identification and/ or anticipation of required services and materials.
The purchasing system tics with recognizing or envisioning a measureable
otherwise paperwork obligatory to a customer, as well as electronic accounts
might be made use of in any of the complementary configurations: acquisitions
applications from inner clients, Conjectures besides customer remits (by
electronic means), Humdrum rationalization outlines (unvarying identifiers),
Store authorizations, in addition to Material fundamentals distinguished in
innovative product progress.
b) Purchase evaluation and approval of supplier(s)
As figure 1, distinctive gaits in the course necessary could exist, reliant on the
proportion of the buy, then furthermore if the bond has buy history with the
7 identification and/ or anticipation of required services and materials; evaluation of potential suppliers;
identification of specific supplier(s) for the required material(s) and services(s); and lastly exchange of purchase
requirements
Document Page
Last Name 7
supplier already. At the point when the client call for id determined, the system
will sanction if an insisted dealer has recently been enrolled in the catalogue.
Majorly, for a tedious buy, buying could have quite recently orchestrated a
correspondence through the dealer, with set up standings for transport, esteeming,
worth, etc, besides the dealer has recently been enlisted hooked on the accounting
scheme. In statuses while the dollar aggregate overtakes the clients' agree to
generate a buy arrange, the buy should at that time knowledge an indorsing
method, to review interest, augment it, as well as consent a acquisition demand to
be prepared.
In case demand demands for an item for a greater dollar whole by way of no
extant provider, by at that moment obtaining may acquire articulations or bids
from prospective providers. Acquiring impels a demand for citation (RFQ) to
dealers engaging them to pageant an offer for an acquisition indenture.
Exactly when the proportion of the buy deals with that a quick and dirty
evaluation is requisite for alternative purchase, contractor appraisal may be
obligatory. The prospective evaluation of suppliers' begins in the wake of finding
that a buy need subsists then the headway of substantial points of interest ensues.
For ordinary mechanism essentials with understood or cautiously picked
providers, extra dealer valuation and assurance isn't basic, as well as the
underwriting methodology may be created. Regardless, potential hotspots for
fresh materials, principally the kinds of a capricious sort, entail watchful
examination to verify that purchasing surveys simply qualified providers.
c) Bidding, Negotiation, and Supplier Selection.
Most recent supplier select materializes once purchase is finalized the plans
requisite amid the supplier valuation procedure. Picking suppliers is perchance a
standout in the midst of the peak imperative exercises accomplished by
administrations. 8Mistakes made within this section of the purchase phase can be
damaging and long-lasting. After deals have been contracted, or potentially the
business deal has transpired, the sourcing assemblage will pick out a supplier,
8 Mistakes made amid this piece of the purchase cycle can be harming and durable

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Last Name 8
then after that advance on to commend the purchase over the purchase validation/
approval manner.
d) Purchase approval
Subsequently the supplier is selected or a directive for a typical material is
developed, purchasing allows a validation to acquisition the commodity. This is
practiced over and done with an automated enlisting of a purchase order (PO),
some of the time called a purchase agreement, once supplier determination is
completed. Procuring need to consider extraordinary consideration while phrasing
a purchase agreement as it is a legitimately confining record.
e) Release and Receive Purchase Requirements
This time of the obtainment/procurement phase integrates the corporeal
transmittal of purchase essentials. A link of connections convey systematizes
electronically, whereas others send material statements over and done with the
mailing or via facsimile. Electronic data exchange (EDI), which integrates the
automated craft of obtainment reports concerning the purchaser as well as dealer,
be able to benefit abridge arrange process extent. The conveyance and
procurement methods entail a couple of extra basic annals (by electronic means),
comprising of the bill of filling, the material pressing slip, and so forth.
f) Continuously Measure and Accomplish Supplier Performance
One means of dealing with the Grade A providers is to pursue implementation
resulting to giving an assent ion. Provider valuation besides the board is a crucial bit
of the procurement sequence. As in figure 1, buyers ought not to imagine that the
purchase sequence finales with the acknowledgement of a request or the decision of a
provider. Steady estimation is vital to perceive upgrade prospects or dealer
delinquency. Throughout the purchasing process, all receipts and order documents are
to be carefully documented for reference and evaluation of transactions and costs for
the project.9 To ensure efficiency, e-procurement shall be adopted and most
recommended for the better part of the project. This will be achieved through:
i. Automating process of document productions.
9 To ensure efficiency, e-procurement shall be adopted and most recommended for the better part of the project
Document Page
Last Name 9
ii. Purchase documents to suppliers shall be communicated electronically and
responses encouraged via same means.
By adopting e-procurement procedures and processes, the project shall accrue the
following advantages:
a) A simulated transmission of transcribed word plus texts dealing with
b) A decline in the interval between affirmation as well as the statement and
acknowledgement of a request.
c) Enhanced communication with suppliers
d) A decline in oversights
e) Lower above costs in the obtaining zone.
f) Acquiring faculty capitalize fewer energy in preparing of attaining demands as well
as invoices, plus supplementary time on key regard encompassed procurement
maneuvers.
II. The 10different risks associated with the project at the production stage include;
logistical risks, environmental risks, technical risks, financial risks, and socio-
political risks as discusses as follows.
a) Logistical risks
These risks slot in the convenience of transportation offices and ease of access of
gear, for instance, parts, fuel, and man power. Devoid of tending to these risks,
project rescheduling and losses result due to increased operating costs.
b) Technical risks
This incorporate whatever limits you from creating the product client desires. This
can add in susceptibility of assets and ease of access of materials, unsatisfactory
situate analysis, or inadequate structure. These hazards can regularly ensue when
there are vagaries in course extension as well as prerequisites, and if there are
structure slip-ups or omissions.
c) Environmental risks
Ecological risks integrate catastrophic proceedings, weather, in addition to
infrequent upshots. These risks are regularly disused when persons are different to
proximate settings. An attempt on an undertaking in another city, one have to get
10 different risks associated with the project at the production stage include; logistical risks, environmental risks,
technical risks, financial risks, and socio-political risks
Document Page
Last Name 10
at ease with that district's weather designs. This hugely impacted experts before
they could adequately acclimatize with the environmental condition of the site
area.
d) Management risks
The most widely recognized administration related hazard is questionable
profitability of assets. Before starting the task one should make certain there are
adequately talented staff and that you have sufficiently defined their jobs in
addition to obligations. Deserting to do this can prompt appalling damages.
e) Budgetary Risks
Also identified as financial risks. 11Inflation, nearby assessments, in addition to
ease of use and variance in foreign exchange are a combine of the imaginable
monetary risks that result in a development project. Assorted nations have
radically astonishing duties also, so you have to deliberate afore launching a task.
In tax exempt city, this would not be an issue.
f) Socio-political dangers
Traditions in addition to import limitations besides troubles dumping equipment
are a couple of the socio-political vulnerabilities you may face during the project.
Contingent upon project location, there will be miscellaneous directions in
addition to codes that you should comply with. In the event that you accept that
each task will have similar codes and directions, you will be in for a reality check.
Experts therefore have to constantly reminded and ensure compliance with
applicable standards and codes.
Part C
I. Passive or active systems for the projects was achieved through:
i. Adoption of zero incident philosophy
The project embraced a Zero Incidents rationality that all project related
mishaps, occurrences, injuries, and ailments are avertible. This logic
advances:
11 Inflation, nearby assessments, and accessibility and variance in foreign exchange are a couple of the conceivable
budgetary risks

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Last Name 11
i. Consistent attention to every individual's duty to recognize and dispose
of hazardous practices and conditions in the work environment;
ii. Building a security group attitude with the end goal that all specialists
add to the exertion, and all managers are completely mindful of their
group's abilities and confinements and are considered responsible for
the group's activities; and
iii. Building a culture in which everybody acknowledges obligation and
responsibility for his or her own wellbeing and wellbeing and in
addition the security and strength of associates.
Besides, 12increased vigilance and enhanced safe working environment
through the zero incidents philosophy.
Other systems would include measures such as hazardous materials
management, storm water management, clean up and restoration of the
project site after completion of work, dust and air emission control, as well
provision of gear and protective gears to workers during project works.
These measures achieves safety from hazardous materials and eliminating
environmental pollution through improper disposal and handling of
hazardous wastes. Storm water management is key to minimize flooding
and water wastage through harnessing of storm water and directing the
flow for safe storage and treatment for use when need arises. This helps to
protect water table and reduce pollution which would be a consequence if
contrary measures are considered. Clean up and restoration of project site
ensures proper disposal of wastes and control degradation within the
project site. This include cut and fill and maintaining a comfortable
gradient and clean environment. Dust and air emission control help
minimize pollution as well as safety of workers and surrounding residents
from dieses that accompany exposure to such materials in the breathing
system hence ensuring safety around the project area.
12 increased vigilance and enhanced safe working environment through the zero incidents philosophy
Document Page
Last Name 12
Bibliography
Banarjee, V.J., 2013. Strategic logistic management. New Delhi: Anmol
Publications.
Document Page
Last Name 13
Construction Project Management - Professional [online], 2018. [online].
Available from: https://ccpe.kennesaw.edu/professional/business-
management/construction-project-management/ [Accessed 11 Dec 2018].
Construction Project Management - Villanova University [online], 2018.
[online]. Available from: https://www.villanovau.com/resources/project-
management/construction-project-management/ [Accessed 11 Dec 2018].
Cooke, B. and Williams, P., 2009. Construction planning, programming and
control. Chichester, U.K.: Wiley-Blackwell.
Cooke, B., 2015. Management of construction projects. Chichester, West
Sussex, United Kingdom: Wiley/Blackwell.
Gevorkian, P., 2010. Alternative energy systems in building design. New
York: McGraw-Hill.
Grant, D.B. and Grant, D.B., 2012. Logistics management. Harlow: Financial
Times Prentice Hall.
Hagerty, D.J., Cohn, L.F., Perry, P.A., and Cosgrove, T., 1999. Opportunities
in civil engineering careers. Boulder, CO: NetLibrary, Inc.
Krygiel, E. and Nies, B., 2008. Green BIM: successful sustainable design
with building information modeling. INpolis, IN: Wiley Publishing.
Kubba, S., 2017. Handbook of green building design and construction:
LEED, BREEAM, and Green Globes. Oxford, United Kingdom: Butterworth-
Heinemann is an imprint of Elsevier.
LEED reference guide for building design and construction, 2016.
Washington, DC: U.S. Green Building Council.
Management of construction projects - Construction Manager [online], 2018.
[online]. Available from: https://www.pmi.org/learning/library/management-
construction-projects-manager-contracts-1750 [Accessed 11 Dec 2018].
Managing Inventories in Supply Chain, 2008. Supply Chain Management:
Concepts, Techniques and Practices, 173–211.
Montoya, M., 2011. Green building fundamentals: practical guide to
understanding and applying fundamental sustainable construction practices
and the LEED system. Upper Saddle River, NJ: Prentice Hall.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Last Name 14
Mullick, N.H. and Khan, M.A., 2011. Supply chain management. New Delhi:
Enkay Pub. House.
rang, G.bo and yu, L., 2008. Gong cheng xiang mu guan li. Bei jing: Ji xie
gong ye chu ban she.
Ross, D.F., 2015. Crafting Business and Supply Chain Strategies. Distribution
Planning and Control, 83–140.
Sabnis, G.M., 2016. Green building with concrete: sustainable design and
construction. Boca Raton: CRC Press.
SCHAUFELBERGER, J.O.H.N., 2017. MANAGEMENT OF
CONSTRUCTION PROJECTS: a constructors perspective. Place of
publication not identified: TAYLOR & FRANCIS.
SIEGEL, 2019. ENGINEERING PROJECT MANAGEMENT. S.l.: JOHN
WILEY.
Sorvig, K., Thompson, J.W., and Farnsworth, C.D., 2018. Sustainable
landscape construction: a guide to green building outdoors. Washington, DC:
Island Press.
Value Management of Construction Projects, 2nd Edition ... [online], 2018.
[online]. Available from: https://www.wiley.com/en-us/Value Management of
Construction Projects, 2nd Edition-p-9781118351239 [Accessed 11 Dec
2018].
Welcome to Hillwood Construction Services Project Management Software
Portal [online], 2018. [online]. Projectmates Construction Project
Management Software: Hillwood Construction Services. Available from:
https://hillwoodconstructionservices.projectmates.com/ [Accessed 11 Dec
2018].
Wisner, J.D. and Stanley, L.L., 2008. Process management: creating value
along the supply chain: text & cases. Ohio: Thomson South-Western.
1 out of 14
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]