logo

Sustainable Studio: Project Management and Engineering Ethics

   

Added on  2023-06-04

9 Pages2215 Words329 Views
 | 
 | 
 | 
Running head: SUSTAINABLE STUDIO
SUSTAINABLE STUDIO
Name of the Student
Name of the University
Author note
Sustainable Studio: Project Management and Engineering Ethics_1

2SUSTAINABLE STUDIO
Table of Contents
Part 1................................................................................................................................................3
Section A.....................................................................................................................................3
Section B......................................................................................................................................3
Section C......................................................................................................................................4
Part 2................................................................................................................................................4
Section 2......................................................................................................................................4
Section 3......................................................................................................................................5
Section 4......................................................................................................................................5
Section 5......................................................................................................................................6
Section 6......................................................................................................................................6
References........................................................................................................................................8
Sustainable Studio: Project Management and Engineering Ethics_2

3SUSTAINABLE STUDIO
Part 1
Section A
I have majorly seen that in the working of the project there can be different types of
changes which can be implemented. The changes are majorly done in the sector when there is
some form of issue or risk faced with the working of the project. One of the sectors in which the
alteration is made is in the sector of meeting the deadline of the project. In some of the cases, it is
majorly seen that the project would be reaching the deadline and the execution of the project is
not done properly. In this case, the manpower which is involved in the working of the project
would be increased. It can be stated here that the sector of reaching the desired goal of the
project within the timeframe which is predefined can be a crucial success factor (Klein,
Biesenthal and Dehlin 2015). According to me, there are other factors even which is linked with
the aspect of the maintaining of the time framework of the project. It can be stated here if the
time of the project is not maintained it would be directly affecting the sector of the budget of the
project. The budget can be one of the factors which can directly lead the project to the failure of
the project.
Section B
Polymer soil stabilization according to me can directly refer to the concept of the addition
of polymer which would be directly improving the quality which is linked with the aspect of the
physical property of the soil. The physical property of the soil can be considered as one of the
important criteria relating to the sector of physicality of the soil. The concept can be related to
the aspect of the geotechnical engineering. I have seen there are various of polymers which are
implemented into the concept. In the near future, it can be stated that there is different
functionality which can be related to the concept of the improving the standard which is related
Sustainable Studio: Project Management and Engineering Ethics_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Personal Learning Outcomes from Project Management Unit - Desklib
|3
|947
|109

Community Development and Feasibility Aspects in DeKalb 2025 Strategic Plan
|5
|1305
|364

Management - Search Engine Crawlers, Mobile Phone in SEO, and Benefits of Mashup
|5
|742
|213

MBA 642 : Project Initiation, Planning and Execution
|10
|2272
|21

Role of Social Media in Business Operations
|12
|2590
|137

Procurement and Contracts - Study Material and Solved Assignments
|7
|1192
|107