This document discusses the implementation and project management of ChemExec, a privately owned pharmacy business. It elaborates on the deployment strategy and risk management analysis of the project.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: SYSTEM ANALYSIS AND DESIGN System Analysis and Design: ChemExec case study Name of the Student: Name of the University:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1SYSTEM ANALYSIS AND DESIGN 5. Implementation and project management a. Deployment strategy The ChemExec operates in many small health care delivery organizations and in the in house pharmacy as well. The company is willing to improve the operational and functional activities, while implementation these facilities the foe the healthcare and patient care. Different deployment strategies are available and based on the type and feature of the project, executives should choose the most suitable deployment strategy. The process of system conversion is referred to as a changing process uses to make conversion of an old system to a new one. Four different conversion methods such as parallel conversion, direct conversion, phased conversion and pilot system are there, used to convert the system from an older to new. Parallel conversion:This approach allows the users to learn about new system. Under this approach the users continuously operates the older system in an accustomed manner however the new system is also being used by the users. This approach is very safe and error free as well. Phased conversion: the phased conversion method is a process where new system is gradually introduced by the business organization. Whenever installations of new system become difficult all at a time this approach is applicable. The reasons for these issues include late arrival, lack of training among the users, overrunning cost etc.
2SYSTEM ANALYSIS AND DESIGN Direct conversion: The process of direct conversion is direct change over method which can successfully convert older system to a new system. Even if no fall back method is available those times also this method forces the uses to develop the new system. After analyzing ChemExec case scenario it can be said that in order to implement the new system the deployment strategy that the company should follow isPhased conversion.It includes split of new information system into small modules.Though, it needs lots of time for the implementation of a full system. Figure 1: Phased conversion (Source:Elmhedwiet al.2015, pp-5) b. Risk management analysis In order to gain commercial revenue and competitive advantages project management application and prcatices are very essential. ChemExec, a privately owned pharmacy business has trading 40 years ago in Melbourne. The risk management plan identifies the impact, likelihood and overall priority of the risks. Based on the priority and impact the project manager of ChemExec should implement accurate asset management program at the project initiation and
3SYSTEM ANALYSIS AND DESIGN progress period. The risk management plans developed for this case scenario are elaborated in the below section: AssetRiskImpactControl/countermeasuresLikelihood Recorded orders If proper security measures are not adopted by the company, then recorded orders may not be properly managed. HighThenetworkengineerofthe companyshoulduseVPNto restrictunwantedinformation flow Possible Entry of new order The system operators are allowed to manage new entry of information therefore, the new orders are needed to be well managed by the project managers to avoid information hacking HighEncryption mechanism is needed to be installed by the project managers to keep data secured from the unwanted external users. Rare Nurse’s records and medical records The financial and personnel details of the nurses and other services offered by the pharmacy are needed to be secured. If proper security MediumThe project executive is needed to install proper security mechanism to make sure that no data are being hacked or hijacked by the external users. Unlikely
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4SYSTEM ANALYSIS AND DESIGN mechanism are not measured by the project managers and project team members then information would be hacked by the unwanted users. Theses information can also be misused.
5SYSTEM ANALYSIS AND DESIGN Bibliography Duggan, J.M., Eichelberger, B.A., Ma, S., Lawler, J.J. and Ziv, G., 2015. Informing management of rare species with an approach combining scenario modeling and spatially explicit risk assessment.Ecosystem Health and Sustainability,1(6), pp.1-18. Elmhedwi, T.R., Elmabrouk, S.K. and Sherif, M.A., 2015, March. Practical risk management plan of Wi-Fi network deployment; case study. In2015 International Conference on Industrial Engineering and Operations Management (IEOM)(pp. 1-10). IEEE. Kerzner, H. and Kerzner, H.R., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Larson, E.W. and Gray, C.F., 2017.Project management: The managerial process. McGraw-Hill Education. Milosevic, D.Z. and Martinelli, R.J., 2016.Project management toolbox: tools and techniques for the practicing project manager. John Wiley & Sons.