logo

System Analysis PG

   

Added on  2022-10-14

7 Pages1146 Words211 Views
 | 
 | 
 | 
Running head: SYSTEM ANALYSIS PG
System Analysis PG
Name of Student
Name of University
Author Note
System Analysis PG_1

1
SYSTEM ANALYSIS PG
Table of Contents
Introduction..........................................................................................................................2
1. Problem............................................................................................................................2
2. Capabilities......................................................................................................................3
3. Benefits............................................................................................................................4
Conclusion...........................................................................................................................4
References............................................................................................................................5
System Analysis PG_2

2
SYSTEM ANALYSIS PG
Introduction
Jack Greig and Danil Cox has considerable experience in management and running of an
auto-part business as a major supplier in the city of Australia. Most of the businesses are linked
with a warehouse management system (WMS) (Richards, 2017). The WMS in the auto-art
business of Griel and Cox has certain limitations and therefore, a system vision document is
being developed to identify the problem, capabilities and the benefits of a new WMS (Atieh et
al., 2016). The system vision document that is being prepared will help in analysis of the
feasibility of the system that is being proposed.
1. Problem
There are certain problems that are being faced with the current WMS. The system is
incapable of handling dynamic procedures which is related to storing and moving of the store
inventory when it is required at a peak efficiency and in lowest cost. Appropriate functioning of
the WMS is necessary to ascertain accurate functioning of the system (Richards, 2017). The
issues that are faced in the current warehouse management is extended to the core warehouse
processes as well. The problems that are faced in the current warehouse management process
should be mitigated to ascertain proper running of the business processes. The basic operations
of the WMS is to be improved for addressing the capabilities and the benefits of WMS.
A business system analyst has been assigned to develop a particular system. The basic
operations of the WMS is needed to be improved in order to ascertain normal operations of a
organization (Battini, Persona & Sgarbossa, 2014). With an aim of improving the current
operations, development of an improved warehouse management system is needed to be
developed.
System Analysis PG_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
ITC 548 - System Analysis PG Name of University Author
|7
|1171
|394

System Vision Document for Auto-Parts Warehouse Management System
|6
|1160
|173

Vision Document Assignment 2022
|6
|1179
|9

Warehouse Management System Assignment 2022
|5
|1005
|12

Vision Document for Auto-Parts Warehouse Management System
|6
|1148
|161

Warehouse Management System Analysis
|7
|1182
|217