Final Project Report on Formation of Target Stores in UK
VerifiedAdded on 2023/06/10
|19
|3961
|371
AI Summary
This report is about the project of “Formation of Target Stores in UK” for forming the implication of the efficient and improved functional formation. It includes literature review, business case, project objectives, performance management, stakeholder analysis, project plan and Gantt chart.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: FINAL PROJECT REPORT
Final Project Report
Name of the Student:
Student ID:
Name of the University:
Author’s note:
Final Project Report
Name of the Student:
Student ID:
Name of the University:
Author’s note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1FINAL PROJECT REPORT
Table of Contents
Part B: Detailed Project report.........................................................................................................2
1. Introduction..............................................................................................................................2
2. Literature review......................................................................................................................2
3. Business Case..........................................................................................................................3
4. Project Objectives....................................................................................................................4
5. Performance Management/Quality Management....................................................................4
6. Stakeholder Analysis...............................................................................................................5
7. Activities to be Carried Out and Project Plan..........................................................................6
7.1 Project Phase and Activities Involved...............................................................................6
7.2 Project Schedule................................................................................................................7
7.3 Gantt chart.........................................................................................................................9
7.4 Work Breakdown Structure.............................................................................................10
8. Resources and Project Budget...............................................................................................11
8.1 Resources and their Usage...............................................................................................11
8.2 Project Budget Estimation...............................................................................................12
8.3 Time Phase Budget..........................................................................................................13
9. Constraints and Risks............................................................................................................14
9.1 Project Constraints...........................................................................................................14
9.2 Risks Involved.................................................................................................................14
10. Communication....................................................................................................................15
11. Conclusion...........................................................................................................................15
References..................................................................................................................................16
Table of Contents
Part B: Detailed Project report.........................................................................................................2
1. Introduction..............................................................................................................................2
2. Literature review......................................................................................................................2
3. Business Case..........................................................................................................................3
4. Project Objectives....................................................................................................................4
5. Performance Management/Quality Management....................................................................4
6. Stakeholder Analysis...............................................................................................................5
7. Activities to be Carried Out and Project Plan..........................................................................6
7.1 Project Phase and Activities Involved...............................................................................6
7.2 Project Schedule................................................................................................................7
7.3 Gantt chart.........................................................................................................................9
7.4 Work Breakdown Structure.............................................................................................10
8. Resources and Project Budget...............................................................................................11
8.1 Resources and their Usage...............................................................................................11
8.2 Project Budget Estimation...............................................................................................12
8.3 Time Phase Budget..........................................................................................................13
9. Constraints and Risks............................................................................................................14
9.1 Project Constraints...........................................................................................................14
9.2 Risks Involved.................................................................................................................14
10. Communication....................................................................................................................15
11. Conclusion...........................................................................................................................15
References..................................................................................................................................16
2FINAL PROJECT REPORT
Part B: Detailed Project report
1. Introduction
The following assignment is made as a final project report on the project of “Formation
of Target Stores in UK” for forming the implication of the efficient and improved functional
formation. The use of the consolidated project management processes would be assisting for
supplying the affirmative inclusion of the functions and defining the implementation of the
factors defining the formation of the efficient function formation. The completion of the
activities would be implied for management of the processes and defining the usefulness of the
successful integration formation (Turner, 2014). The usefulness of the factors would be assisting
for supporting the formation of the improved project integration management. The completion of
the project would result in formation of target stores in UK and successfully implication of the
formation strategy. The completion of the activities would be dependent on the formation of the
improved functional and efficient formation model. The usefulness would be based on the
simplification of the factors defining the usefulness of the improved functional and formation
functions.
2. Literature review
According to Kerzner and Kerzner (2017), the project management forms a major
influence for the implication of the efficient formation process. The usefulness of the factors
aligning the simple formation model would be assisting for improving the formation and
modification of the functions. The use of the consolidated project management processes would
be assisting for supplying the affirmative inclusion of the functions and defining the
implementation of the factors defining the formation of the efficient function formation. The
Part B: Detailed Project report
1. Introduction
The following assignment is made as a final project report on the project of “Formation
of Target Stores in UK” for forming the implication of the efficient and improved functional
formation. The use of the consolidated project management processes would be assisting for
supplying the affirmative inclusion of the functions and defining the implementation of the
factors defining the formation of the efficient function formation. The completion of the
activities would be implied for management of the processes and defining the usefulness of the
successful integration formation (Turner, 2014). The usefulness of the factors would be assisting
for supporting the formation of the improved project integration management. The completion of
the project would result in formation of target stores in UK and successfully implication of the
formation strategy. The completion of the activities would be dependent on the formation of the
improved functional and efficient formation model. The usefulness would be based on the
simplification of the factors defining the usefulness of the improved functional and formation
functions.
2. Literature review
According to Kerzner and Kerzner (2017), the project management forms a major
influence for the implication of the efficient formation process. The usefulness of the factors
aligning the simple formation model would be assisting for improving the formation and
modification of the functions. The use of the consolidated project management processes would
be assisting for supplying the affirmative inclusion of the functions and defining the
implementation of the factors defining the formation of the efficient function formation. The
3FINAL PROJECT REPORT
usefulness of the factors would be assisting for supporting the formation of the improved project
integration management. On the other hand Harrison and Lock (2017), have pointed that the
strategies of the project planning using specific methodologies would be assisting for ensuring
that the project would be finished in the estimated time duration. The project planning is a major
factor that defines the significant formation of the factors supporting the simplification of the
improved factors. The completion of the activities would be implied for management of the
processes and defining the usefulness of the successful integration formation. Steinke, Al-Deen
and LaBrie (2017), have stated that the risk management has the most influential part in
management of the risk. There are numerous factors that can form the impact on the successful
completion of the project. The use of the efficient risk management processes would be assisting
for easing the processes of the formation model for aligning the simple usefulness of the
functions. As opined by Hiekata et al. (2016), the agile methodology is also very assisting for
taking care of the project planning of IT formation projects. The support and formation of the
functions would be successful with the help of iterative model of project progress. The iterative
model would allow the change implementation in the project as per the client’s requirements.
3. Business Case
The target stores formation in UK has been the primary motive of the formation in the
project. The target stores allow the organization for promoting their products for a specific class
division of people. For example- the stationary and other items have been targeted for the
schools and office uses. The target stores sell some commodities for an individual group of
people belonging to same class (either in terms of work, liking, or culture). It allows the
maximum sale of the products for the company allowing the formation of the improved
usefulness of the factors would be assisting for supporting the formation of the improved project
integration management. On the other hand Harrison and Lock (2017), have pointed that the
strategies of the project planning using specific methodologies would be assisting for ensuring
that the project would be finished in the estimated time duration. The project planning is a major
factor that defines the significant formation of the factors supporting the simplification of the
improved factors. The completion of the activities would be implied for management of the
processes and defining the usefulness of the successful integration formation. Steinke, Al-Deen
and LaBrie (2017), have stated that the risk management has the most influential part in
management of the risk. There are numerous factors that can form the impact on the successful
completion of the project. The use of the efficient risk management processes would be assisting
for easing the processes of the formation model for aligning the simple usefulness of the
functions. As opined by Hiekata et al. (2016), the agile methodology is also very assisting for
taking care of the project planning of IT formation projects. The support and formation of the
functions would be successful with the help of iterative model of project progress. The iterative
model would allow the change implementation in the project as per the client’s requirements.
3. Business Case
The target stores formation in UK has been the primary motive of the formation in the
project. The target stores allow the organization for promoting their products for a specific class
division of people. For example- the stationary and other items have been targeted for the
schools and office uses. The target stores sell some commodities for an individual group of
people belonging to same class (either in terms of work, liking, or culture). It allows the
maximum sale of the products for the company allowing the formation of the improved
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4FINAL PROJECT REPORT
functional formation. The usefulness of the factors would be formed for easing the implication of
the activities defining the successful formation of the factors.
4. Project Objectives
The project of Formation of Target Stores in UK is formed simplifying the formation of
the improved functional and formation options. The objectives of the project include,
To develop the required target stores in UK for the client successfully with the
help of the improved strategy formation
To utilize the construction and IT project management principles for easing the
process of the forming the efficient formation of the functions
To increase the chances of getting increase in the revenue of the organization
5. Performance Management/Quality Management
The quality management is one of the most crucial factors aligning the simplified
formation of the functions supporting the usefulness of the improved functional and efficient
formation (Verzuh, 2015). The quality management is very assisting for the project of Formation
of Target Stores in UK as the project includes both construction and IT technology processes.
The quality management comprises of quality planning, quality assurance, and quality control.
The quality management planning is based on the simplified formation of the factors aligning the
formation of the successful project completion. The following diagram would show the quality
management process to be carried out,
functional formation. The usefulness of the factors would be formed for easing the implication of
the activities defining the successful formation of the factors.
4. Project Objectives
The project of Formation of Target Stores in UK is formed simplifying the formation of
the improved functional and formation options. The objectives of the project include,
To develop the required target stores in UK for the client successfully with the
help of the improved strategy formation
To utilize the construction and IT project management principles for easing the
process of the forming the efficient formation of the functions
To increase the chances of getting increase in the revenue of the organization
5. Performance Management/Quality Management
The quality management is one of the most crucial factors aligning the simplified
formation of the functions supporting the usefulness of the improved functional and efficient
formation (Verzuh, 2015). The quality management is very assisting for the project of Formation
of Target Stores in UK as the project includes both construction and IT technology processes.
The quality management comprises of quality planning, quality assurance, and quality control.
The quality management planning is based on the simplified formation of the factors aligning the
formation of the successful project completion. The following diagram would show the quality
management process to be carried out,
5FINAL PROJECT REPORT
Figure 1: Quality Management Process
(Source: Mir & Pinnington, 2014, pp-215)
6. Stakeholder Analysis
The stakeholder analysis is done based on the simplified factor utilization for
understanding the key roles of the project stakeholders (Marchewka, 2014). The key stakeholders
of the project would comprise of client, customers, staff, investors, project manager, and
contractor. The key stakeholders of the project would be based on the simplified development of
the information processing and support development of the clients. The following table would
show the stakeholder and their roles and responsibilities for the project activity development,
Serial
no. Stakeholders Interest Influence Roles and Responsibilities
1 Client High High
Client is responsible for the requirements of the
project operations and defining the simplified
approval for the project success.
Figure 1: Quality Management Process
(Source: Mir & Pinnington, 2014, pp-215)
6. Stakeholder Analysis
The stakeholder analysis is done based on the simplified factor utilization for
understanding the key roles of the project stakeholders (Marchewka, 2014). The key stakeholders
of the project would comprise of client, customers, staff, investors, project manager, and
contractor. The key stakeholders of the project would be based on the simplified development of
the information processing and support development of the clients. The following table would
show the stakeholder and their roles and responsibilities for the project activity development,
Serial
no. Stakeholders Interest Influence Roles and Responsibilities
1 Client High High
Client is responsible for the requirements of the
project operations and defining the simplified
approval for the project success.
6FINAL PROJECT REPORT
2 Customers Low High
The customers are the end users of the project
and they would get the benefit of the end
products. The success of the project would be
based on the number of customers the
organization would make in UK.
3 Staff High Low
The staffs are another end user of the project
that would be responsible for the customer
handling and sales.
4 Investors High High The investors would be responsible for the
provision of the resources required in the project
5 Project
Manager High Low The project manager is helpful for developing
the complete execution of the project.
6 Contractor Low High
The contractor would be helpful for executing
the simplified development of the external
support to the project completion
7. Activities to be Carried Out and Project Plan
7.1 Project Phase and Activities Involved
The project of “Development of Target Stores in UK” is a combination of both IT and
construction project activities. The new stores would be developed using the principles of the
construction engineering whereas the new equipments and their installation would be executed
by the help of technology development process. The complete project was divided into 4 phases
of Initialization, Planning, Execution, and Closure. The activities involved in these phases have
been listed below,
Initialization: It is the first phase of the Development of Target Stores in UK project and
it comprise of initiation activities of the project. The analysis of the requirements, initiation
2 Customers Low High
The customers are the end users of the project
and they would get the benefit of the end
products. The success of the project would be
based on the number of customers the
organization would make in UK.
3 Staff High Low
The staffs are another end user of the project
that would be responsible for the customer
handling and sales.
4 Investors High High The investors would be responsible for the
provision of the resources required in the project
5 Project
Manager High Low The project manager is helpful for developing
the complete execution of the project.
6 Contractor Low High
The contractor would be helpful for executing
the simplified development of the external
support to the project completion
7. Activities to be Carried Out and Project Plan
7.1 Project Phase and Activities Involved
The project of “Development of Target Stores in UK” is a combination of both IT and
construction project activities. The new stores would be developed using the principles of the
construction engineering whereas the new equipments and their installation would be executed
by the help of technology development process. The complete project was divided into 4 phases
of Initialization, Planning, Execution, and Closure. The activities involved in these phases have
been listed below,
Initialization: It is the first phase of the Development of Target Stores in UK project and
it comprise of initiation activities of the project. The analysis of the requirements, initiation
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7FINAL PROJECT REPORT
documentation, charter development, and submission of documents are the activities involved in
the project. The sign off is the milestone of the project phase.
Planning: It is the second phase of the Development of Target Stores in UK project and
it comprise of scheduling the activities of the project in a compact project plan. The outline of
plan is made, activity listing is done, scheduling the activities, and complete plan is developed
are the activities involved in the project. The plan review is the milestone of the project phase.
Execution: It is the third phase of the Development of Target Stores in UK project and it
comprise of executing the activities of the project plan. The strategy development, infrastructure
development, technology development, installation of new equipments, facility development,
inspection of the new location, and safety and procurement are the activities involved in the
project. The completed is the milestone of the project phase.
Closure: It is the last phase of the Development of Target Stores in UK project and it
comprise of final closure by forming the report on the executed activities of the project plan. The
final report is made and report submission is the activities involved in the project. The sign off is
the milestone of the project phase.
7.2 Project Schedule
The following table would show the project schedule for the project of Development of
Target Stores in UK project,
WBS Task Name Duration Start Finish Predecessors
0 Development of Target Stores in UK 60 days Wed 8/1/18 Tue 10/23/18
1 Initialization 10 days Wed 8/1/18 Tue 8/14/18
documentation, charter development, and submission of documents are the activities involved in
the project. The sign off is the milestone of the project phase.
Planning: It is the second phase of the Development of Target Stores in UK project and
it comprise of scheduling the activities of the project in a compact project plan. The outline of
plan is made, activity listing is done, scheduling the activities, and complete plan is developed
are the activities involved in the project. The plan review is the milestone of the project phase.
Execution: It is the third phase of the Development of Target Stores in UK project and it
comprise of executing the activities of the project plan. The strategy development, infrastructure
development, technology development, installation of new equipments, facility development,
inspection of the new location, and safety and procurement are the activities involved in the
project. The completed is the milestone of the project phase.
Closure: It is the last phase of the Development of Target Stores in UK project and it
comprise of final closure by forming the report on the executed activities of the project plan. The
final report is made and report submission is the activities involved in the project. The sign off is
the milestone of the project phase.
7.2 Project Schedule
The following table would show the project schedule for the project of Development of
Target Stores in UK project,
WBS Task Name Duration Start Finish Predecessors
0 Development of Target Stores in UK 60 days Wed 8/1/18 Tue 10/23/18
1 Initialization 10 days Wed 8/1/18 Tue 8/14/18
8FINAL PROJECT REPORT
1.1 Analysis of the requirements 2 days Wed 8/1/18 Thu 8/2/18
1.2 Initiation Documentation 3 days Fri 8/3/18 Tue 8/7/18 2
1.3 Charter Development 3 days Wed 8/8/18 Fri 8/10/18 3
1.4 Submission of documents 2 days Mon 8/13/18 Tue 8/14/18 4
1.5 Sign off 0 days Tue 8/14/18 Tue 8/14/18 5
2 Planning 13 days Wed 8/15/18 Fri 8/31/18
2.1 Outline of plan is made 2 days Wed 8/15/18 Thu 8/16/18 6
2.2 Activity Listing is done 2 days Fri 8/17/18 Mon 8/20/18 8
2.3 Scheduling the activities 4 days Tue 8/21/18 Fri 8/24/18 9
2.4 Complete Plan is developed 5 days Mon 8/27/18 Fri 8/31/18 10
2.5 Plan Review 0 days Fri 8/31/18 Fri 8/31/18 11
3 Execution 31 days Mon 9/3/18 Mon 10/15/18
3.1 Strategy Development 3 days Mon 9/3/18 Wed 9/5/18 12
3.2 Infrastructure development 5 days Thu 9/6/18 Wed 9/12/18 14
3.3 Technology Development 8 days Thu 9/13/18 Mon 9/24/18 15
3.4 Installation of new equipments 6 days Tue 9/25/18 Tue 10/2/18 16
3.5 Facility Development 4 days Wed 10/3/18 Mon 10/8/18 17
3.6 Inspection of the new location 2 days Tue 10/9/18 Wed 10/10/18 18
3.7 Safety and Procurement 3 days Thu 10/11/18 Mon 10/15/18 19
3.8 Completed 0 days Mon 10/15/18 Mon 10/15/18 20
4 Closure 6 days Tue 10/16/18 Tue 10/23/18
4.1 Final Report is made 4 days Tue 10/16/18 Fri 10/19/18 21
4.2 Report Submission 2 days Mon 10/22/18 Tue 10/23/18 23
4.3 Sign off 0 days Tue 10/23/18 Tue 10/23/18 24
1.1 Analysis of the requirements 2 days Wed 8/1/18 Thu 8/2/18
1.2 Initiation Documentation 3 days Fri 8/3/18 Tue 8/7/18 2
1.3 Charter Development 3 days Wed 8/8/18 Fri 8/10/18 3
1.4 Submission of documents 2 days Mon 8/13/18 Tue 8/14/18 4
1.5 Sign off 0 days Tue 8/14/18 Tue 8/14/18 5
2 Planning 13 days Wed 8/15/18 Fri 8/31/18
2.1 Outline of plan is made 2 days Wed 8/15/18 Thu 8/16/18 6
2.2 Activity Listing is done 2 days Fri 8/17/18 Mon 8/20/18 8
2.3 Scheduling the activities 4 days Tue 8/21/18 Fri 8/24/18 9
2.4 Complete Plan is developed 5 days Mon 8/27/18 Fri 8/31/18 10
2.5 Plan Review 0 days Fri 8/31/18 Fri 8/31/18 11
3 Execution 31 days Mon 9/3/18 Mon 10/15/18
3.1 Strategy Development 3 days Mon 9/3/18 Wed 9/5/18 12
3.2 Infrastructure development 5 days Thu 9/6/18 Wed 9/12/18 14
3.3 Technology Development 8 days Thu 9/13/18 Mon 9/24/18 15
3.4 Installation of new equipments 6 days Tue 9/25/18 Tue 10/2/18 16
3.5 Facility Development 4 days Wed 10/3/18 Mon 10/8/18 17
3.6 Inspection of the new location 2 days Tue 10/9/18 Wed 10/10/18 18
3.7 Safety and Procurement 3 days Thu 10/11/18 Mon 10/15/18 19
3.8 Completed 0 days Mon 10/15/18 Mon 10/15/18 20
4 Closure 6 days Tue 10/16/18 Tue 10/23/18
4.1 Final Report is made 4 days Tue 10/16/18 Fri 10/19/18 21
4.2 Report Submission 2 days Mon 10/22/18 Tue 10/23/18 23
4.3 Sign off 0 days Tue 10/23/18 Tue 10/23/18 24
9FINAL PROJECT REPORT
7.3 Gantt chart
The following diagram would show the Gantt chart for the project of Development of Target Stores in UK project,
ID Task
Mode
WBS Task Name Duration Start Finish
0 0 Development of Target
Stores in UK
60 days Wed 8/1/18 Tue
10/23/18
1 1 Initialization 10 days Wed 8/1/18 Tue 8/14/18
2 1.1 Analysis of the
requirements
2 days Wed 8/1/18 Thu 8/2/18
3 1.2 Initiation Documentation3 days Fri 8/3/18 Tue 8/7/18
4 1.3 Charter Development3 days Wed 8/8/18 Fri 8/10/18
5 1.4 Submission of documents2 days Mon 8/13/18 Tue 8/14/18
6 1.5 Sign off 0 days Tue 8/14/18 Tue 8/14/18
7 2 Planning 13 days Wed 8/15/18 Fri 8/31/18
8 2.1 Outline of plan is made2 days Wed 8/15/18 Thu 8/16/18
9 2.2 Activity Listing is done2 days Fri 8/17/18 Mon 8/20/18
10 2.3 Scheduling the activities4 days Tue 8/21/18 Fri 8/24/18
11 2.4 Complete Plan is
developed
5 days Mon 8/27/18 Fri 8/31/18
12 2.5 Plan Review 0 days Fri 8/31/18 Fri 8/31/18
13 3 Execution 31 days Mon 9/3/18 Mon 10/15/18
14 3.1 Strategy Development3 days Mon 9/3/18 Wed 9/5/18
15 3.2 Infrastructure
development
5 days Thu 9/6/18 Wed 9/12/18
16 3.3 Technology Development8 days Thu 9/13/18 Mon 9/24/18
17 3.4 Installation of new
equipments
6 days Tue 9/25/18 Tue 10/2/18
18 3.5 Facility Development4 days Wed 10/3/18 Mon 10/8/18
19 3.6 Inspection of the
new location
2 days Tue 10/9/18 Wed 10/10/18
20 3.7 Safety and Procurement3 days Thu 10/11/18 Mon 10/15/18
21 3.8 Completed 0 days Mon 10/15/18 Mon 10/15/18
22 4 Closure 6 days Tue 10/16/18 Tue 10/23/18
23 4.1 Final Report is made 4 days Tue 10/16/18 Fri 10/19/18
24 4.2 Report Submission 2 days Mon 10/22/18 Tue 10/23/18
25 4.3 Sign off 0 days Tue 10/23/18 Tue 10/23/18
Manager
Documenter,Documents[1]
Documenter,Documents[1]
Documenter
8/14
Planner
Planner
Planner
Planner
8/31
Manager
Contractor,Construction Costs[1]
Engineer,System and Devices[1]
Workers,Equipments Price[1]
Workers,Tools[1]
Engineer
Contractor
10/15
Documenter,Documents[1]
Documenter
10/23
S T M F T S W S T M F
Jul 29, '18 Aug 26, '18 Sep 23, '18 Oct 21, '18 Nov 18, '18
Figure 2: Project Gantt chart
7.3 Gantt chart
The following diagram would show the Gantt chart for the project of Development of Target Stores in UK project,
ID Task
Mode
WBS Task Name Duration Start Finish
0 0 Development of Target
Stores in UK
60 days Wed 8/1/18 Tue
10/23/18
1 1 Initialization 10 days Wed 8/1/18 Tue 8/14/18
2 1.1 Analysis of the
requirements
2 days Wed 8/1/18 Thu 8/2/18
3 1.2 Initiation Documentation3 days Fri 8/3/18 Tue 8/7/18
4 1.3 Charter Development3 days Wed 8/8/18 Fri 8/10/18
5 1.4 Submission of documents2 days Mon 8/13/18 Tue 8/14/18
6 1.5 Sign off 0 days Tue 8/14/18 Tue 8/14/18
7 2 Planning 13 days Wed 8/15/18 Fri 8/31/18
8 2.1 Outline of plan is made2 days Wed 8/15/18 Thu 8/16/18
9 2.2 Activity Listing is done2 days Fri 8/17/18 Mon 8/20/18
10 2.3 Scheduling the activities4 days Tue 8/21/18 Fri 8/24/18
11 2.4 Complete Plan is
developed
5 days Mon 8/27/18 Fri 8/31/18
12 2.5 Plan Review 0 days Fri 8/31/18 Fri 8/31/18
13 3 Execution 31 days Mon 9/3/18 Mon 10/15/18
14 3.1 Strategy Development3 days Mon 9/3/18 Wed 9/5/18
15 3.2 Infrastructure
development
5 days Thu 9/6/18 Wed 9/12/18
16 3.3 Technology Development8 days Thu 9/13/18 Mon 9/24/18
17 3.4 Installation of new
equipments
6 days Tue 9/25/18 Tue 10/2/18
18 3.5 Facility Development4 days Wed 10/3/18 Mon 10/8/18
19 3.6 Inspection of the
new location
2 days Tue 10/9/18 Wed 10/10/18
20 3.7 Safety and Procurement3 days Thu 10/11/18 Mon 10/15/18
21 3.8 Completed 0 days Mon 10/15/18 Mon 10/15/18
22 4 Closure 6 days Tue 10/16/18 Tue 10/23/18
23 4.1 Final Report is made 4 days Tue 10/16/18 Fri 10/19/18
24 4.2 Report Submission 2 days Mon 10/22/18 Tue 10/23/18
25 4.3 Sign off 0 days Tue 10/23/18 Tue 10/23/18
Manager
Documenter,Documents[1]
Documenter,Documents[1]
Documenter
8/14
Planner
Planner
Planner
Planner
8/31
Manager
Contractor,Construction Costs[1]
Engineer,System and Devices[1]
Workers,Equipments Price[1]
Workers,Tools[1]
Engineer
Contractor
10/15
Documenter,Documents[1]
Documenter
10/23
S T M F T S W S T M F
Jul 29, '18 Aug 26, '18 Sep 23, '18 Oct 21, '18 Nov 18, '18
Figure 2: Project Gantt chart
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
10FINAL PROJECT REPORT
7.4 Work Breakdown Structure
The following diagram would show the work breakdown structure for the project of Development of Target Stores in UK
project,
Development of Target
Stores in UK
Initialization
Analysis of the
requirements
Initiation
Documentation
Charter
Development
Submission of
documents
Sign off
Planning
Outline of plan is
made
Activity Listing is
done
Scheduling the
activities
Complete Plan is
developed
Plan Review
Execution
Strategy
Development
Infrastructure
development
Technology
Development
Installation of new
equipments
Facility
Development
Inspection of the
new location
Safety and
Procurement
Completed
Closure
Final Report is made
Report Submission
Sign off
Figure 3: Work Breakdown Structure
7.4 Work Breakdown Structure
The following diagram would show the work breakdown structure for the project of Development of Target Stores in UK
project,
Development of Target
Stores in UK
Initialization
Analysis of the
requirements
Initiation
Documentation
Charter
Development
Submission of
documents
Sign off
Planning
Outline of plan is
made
Activity Listing is
done
Scheduling the
activities
Complete Plan is
developed
Plan Review
Execution
Strategy
Development
Infrastructure
development
Technology
Development
Installation of new
equipments
Facility
Development
Inspection of the
new location
Safety and
Procurement
Completed
Closure
Final Report is made
Report Submission
Sign off
Figure 3: Work Breakdown Structure
11FINAL PROJECT REPORT
8. Resources and Project Budget
8.1 Resources and their Usage
The following table would show the resource usage for the project of Development of
Target Stores in UK project,
Resource Name Activities Usage (hrs and units)
Documenter
Initiation Documentation 24 hrs
Charter Development 24 hrs
Submission of documents 16 hrs
Final Report is made 32 hrs
Report Submission 16 hrs
Total 112 hrs
Planner
Outline of plan is made 16 hrs
Activity Listing is done 16 hrs
Scheduling the activities 32 hrs
Complete Plan is developed 40 hrs
Total 104 hrs
Manager
Analysis of the requirements 16 hrs
Strategy Development 24 hrs
Total 40 hrs
Contractor
Infrastructure development 40 hrs
Safety and Procurement 24 hrs
Total 64 hrs
Engineer Technology Development 64 hrs
8. Resources and Project Budget
8.1 Resources and their Usage
The following table would show the resource usage for the project of Development of
Target Stores in UK project,
Resource Name Activities Usage (hrs and units)
Documenter
Initiation Documentation 24 hrs
Charter Development 24 hrs
Submission of documents 16 hrs
Final Report is made 32 hrs
Report Submission 16 hrs
Total 112 hrs
Planner
Outline of plan is made 16 hrs
Activity Listing is done 16 hrs
Scheduling the activities 32 hrs
Complete Plan is developed 40 hrs
Total 104 hrs
Manager
Analysis of the requirements 16 hrs
Strategy Development 24 hrs
Total 40 hrs
Contractor
Infrastructure development 40 hrs
Safety and Procurement 24 hrs
Total 64 hrs
Engineer Technology Development 64 hrs
12FINAL PROJECT REPORT
Inspection of the new location 16 hrs
Total 80 hrs
Workers
Installation of new equipments 48 hrs
Facility Development 32 hrs
Total 80 hrs
Documents
Initiation Documentation 1
Charter Development 1
Final Report is made 1
Total 3
Construction Costs Infrastructure development 1
Equipments Price Installation of new equipments 1
System and Devices Technology Development 1
Tools Facility Development 1
8.2 Project Budget Estimation
The following table would show the project budget for the project of Development of
Target Stores in UK project,
Resource Name Type Work Standard Rate Cost
Documenter Work 112 hrs £80.00/hr £8,960.00
Planner Work 104 hrs £80.00/hr £8,320.00
Manager Work 40 hrs £150.00/hr £6,000.00
Contractor Work 64 hrs £100.00/hr £6,400.00
Engineer Work 80 hrs £120.00/hr £9,600.00
Inspection of the new location 16 hrs
Total 80 hrs
Workers
Installation of new equipments 48 hrs
Facility Development 32 hrs
Total 80 hrs
Documents
Initiation Documentation 1
Charter Development 1
Final Report is made 1
Total 3
Construction Costs Infrastructure development 1
Equipments Price Installation of new equipments 1
System and Devices Technology Development 1
Tools Facility Development 1
8.2 Project Budget Estimation
The following table would show the project budget for the project of Development of
Target Stores in UK project,
Resource Name Type Work Standard Rate Cost
Documenter Work 112 hrs £80.00/hr £8,960.00
Planner Work 104 hrs £80.00/hr £8,320.00
Manager Work 40 hrs £150.00/hr £6,000.00
Contractor Work 64 hrs £100.00/hr £6,400.00
Engineer Work 80 hrs £120.00/hr £9,600.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
13FINAL PROJECT REPORT
Workers Work 80 hrs £90.00/hr £7,200.00
Documents Material 3 £100.00 £300.00
Construction Costs Material 1 £12,720.00 £12,720.00
Equipments Price Material 1 £7,500.00 £7,500.00
System and Devices Material 1 £4,500.00 £4,500.00
Tools Material 1 £3,500.00 £3,500.00
Total Budget £75,000.00
8.3 Time Phase Budget
The following diagram would show the time phased budget for the project of
Development of Target Stores in UK project,
Figure 4: Time Phased Bugdet
Workers Work 80 hrs £90.00/hr £7,200.00
Documents Material 3 £100.00 £300.00
Construction Costs Material 1 £12,720.00 £12,720.00
Equipments Price Material 1 £7,500.00 £7,500.00
System and Devices Material 1 £4,500.00 £4,500.00
Tools Material 1 £3,500.00 £3,500.00
Total Budget £75,000.00
8.3 Time Phase Budget
The following diagram would show the time phased budget for the project of
Development of Target Stores in UK project,
Figure 4: Time Phased Bugdet
14FINAL PROJECT REPORT
9. Constraints and Risks
9.1 Project Constraints
The constraints of the project of Development of Target Stores in UK project are time,
budget, and quality of the final deliverable. The explanation of the project constraints is given
below,
Time: The time plays a significant role in the development of the project activity
development. The limitation of the time is a major factor forming the development of the
completion of the project.
Budget: The budget for the project is simplified for easing the alignment factors
supporting the simplified development of the project. The budget estimation is developed
confining the utilization of the resources for the project.
Quality: The quality of the final deliverable is a major factor for confining the project
quality assurance and the simplification of the effective plan development.
9.2 Risks Involved
The risk involved in the Development of Target Stores in UK project are shown in the
following table,
Risk Name Probability Likelihood Mitigation
Delay in
Completion High Low Utilization of the project scheduling process and
alignment process
Over budget Medium Medium Provisional budget should be made
Quality Issues Low High Quality Management plan should be used
9. Constraints and Risks
9.1 Project Constraints
The constraints of the project of Development of Target Stores in UK project are time,
budget, and quality of the final deliverable. The explanation of the project constraints is given
below,
Time: The time plays a significant role in the development of the project activity
development. The limitation of the time is a major factor forming the development of the
completion of the project.
Budget: The budget for the project is simplified for easing the alignment factors
supporting the simplified development of the project. The budget estimation is developed
confining the utilization of the resources for the project.
Quality: The quality of the final deliverable is a major factor for confining the project
quality assurance and the simplification of the effective plan development.
9.2 Risks Involved
The risk involved in the Development of Target Stores in UK project are shown in the
following table,
Risk Name Probability Likelihood Mitigation
Delay in
Completion High Low Utilization of the project scheduling process and
alignment process
Over budget Medium Medium Provisional budget should be made
Quality Issues Low High Quality Management plan should be used
15FINAL PROJECT REPORT
10. Communication
The communication plays a significant role in the formation of the efficient management
of the functions (Lock, 2017). The completion of the project would be formed for easing the
formation of the factors developing the simplification of the factors aligning the usefulness of the
improved communication formation. The communication process would be eased with the help
of the successful completion of the activities. The communication planning is assisting for easing
the usefulness of the factors.
11. Conclusion
The usefulness of the factors had been assisting for supporting the formation of the
improved project integration management. The completion of the project would result in
formation of target stores in UK and successfully implication of the formation strategy. The
completion of the activities had been dependent on the formation of the improved functional and
efficient formation model. The usefulness had been based on the simplification of the factors
defining the usefulness of the improved functional and formation functions. The limitation of the
time had been formed successfully aligning the usefulness of the factors aligning the formation
of the improved factors. The formation of the factors had been implied of the time factor
formation. The limitation of the project budget had been required in the project.
10. Communication
The communication plays a significant role in the formation of the efficient management
of the functions (Lock, 2017). The completion of the project would be formed for easing the
formation of the factors developing the simplification of the factors aligning the usefulness of the
improved communication formation. The communication process would be eased with the help
of the successful completion of the activities. The communication planning is assisting for easing
the usefulness of the factors.
11. Conclusion
The usefulness of the factors had been assisting for supporting the formation of the
improved project integration management. The completion of the project would result in
formation of target stores in UK and successfully implication of the formation strategy. The
completion of the activities had been dependent on the formation of the improved functional and
efficient formation model. The usefulness had been based on the simplification of the factors
defining the usefulness of the improved functional and formation functions. The limitation of the
time had been formed successfully aligning the usefulness of the factors aligning the formation
of the improved factors. The formation of the factors had been implied of the time factor
formation. The limitation of the project budget had been required in the project.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
16FINAL PROJECT REPORT
References
Binder, J. (2016). Global project management: communication, collaboration and management
across borders. Routledge.
Edwards Jr, T. V. (2017). APPLICATION OF AGILE METHODOLOGY TO
ELECTROMECHANICAL DESIGN: A CASE STUDY. In Proceedings of the
International Annual Conference of the American Society for Engineering
Management. (pp. 1-5). American Society for Engineering Management (ASEM).
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Hiekata, K., Mitsuyuki, T., Goto, T., & Moser, B. R. (2016, October). Design of Software
Development Architecture Comparison of Waterfall and Agile Using Reliability Growth
Model. In ISPE TE (pp. 471-480).
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John
Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
References
Binder, J. (2016). Global project management: communication, collaboration and management
across borders. Routledge.
Edwards Jr, T. V. (2017). APPLICATION OF AGILE METHODOLOGY TO
ELECTROMECHANICAL DESIGN: A CASE STUDY. In Proceedings of the
International Annual Conference of the American Society for Engineering
Management. (pp. 1-5). American Society for Engineering Management (ASEM).
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Hiekata, K., Mitsuyuki, T., Goto, T., & Moser, B. R. (2016, October). Design of Software
Development Architecture Comparison of Waterfall and Agile Using Reliability Growth
Model. In ISPE TE (pp. 471-480).
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John
Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
17FINAL PROJECT REPORT
Larson, E. W., Gray, C. F., Danlin, U., Honig, B., & Bacarini, D. (2014). Project management:
The managerial process (Vol. 6). Grandview Heights, OH: McGraw-Hill Education.
Leach, L. P. (2014). Critical chain project management. Artech House.
Lock, D. (2017). The essentials of project management. Routledge.
Mahadevan, L., Kettinger, W. J., & Meservy, T. O. (2015). Running on Hybrid: Control Changes
when Introducing an Agile Methodology in a Traditional" Waterfall" System
Development Environment. CAIS, 36, 5.
Marchewka, J. T. (2014). Information technology project management. John Wiley & Sons.
McNeil, A. J., Frey, R., & Embrechts, P. (2015). Quantitative Risk Management: Concepts,
Techniques and Tools-revised edition. Princeton university press.
Meredith, J. R., Mantel, S. J., Shafer, S. M., & Sutton, M. M. (2014). Project management in
practice. Wiley.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking
project management performance and project success. International journal of project
management, 32(2), 202-217.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and
technology. Routledge.
Patwardhan, A., Kidd, J., Urena, T., & Rajgopalan, A. (2016). Embracing Agile methodology
during DevOps Developer Internship Program. arXiv preprint arXiv:1607.01893.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
Larson, E. W., Gray, C. F., Danlin, U., Honig, B., & Bacarini, D. (2014). Project management:
The managerial process (Vol. 6). Grandview Heights, OH: McGraw-Hill Education.
Leach, L. P. (2014). Critical chain project management. Artech House.
Lock, D. (2017). The essentials of project management. Routledge.
Mahadevan, L., Kettinger, W. J., & Meservy, T. O. (2015). Running on Hybrid: Control Changes
when Introducing an Agile Methodology in a Traditional" Waterfall" System
Development Environment. CAIS, 36, 5.
Marchewka, J. T. (2014). Information technology project management. John Wiley & Sons.
McNeil, A. J., Frey, R., & Embrechts, P. (2015). Quantitative Risk Management: Concepts,
Techniques and Tools-revised edition. Princeton university press.
Meredith, J. R., Mantel, S. J., Shafer, S. M., & Sutton, M. M. (2014). Project management in
practice. Wiley.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking
project management performance and project success. International journal of project
management, 32(2), 202-217.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and
technology. Routledge.
Patwardhan, A., Kidd, J., Urena, T., & Rajgopalan, A. (2016). Embracing Agile methodology
during DevOps Developer Internship Program. arXiv preprint arXiv:1607.01893.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
18FINAL PROJECT REPORT
Steinke, G. H., Al-Deen, M. S., & LaBrie, R. C. (2017). NNOVATING INFORMATION
SYSTEM DEVELOPMENT METHODOLOGIES WITH DESIGN THINKING.
In Proceedings of the 5th International Conference on Applied Innovations in IT (pp. 51-
55).
Turner, J. R. (2014). Handbook of project-based management(Vol. 92). New York, NY:
McGraw-hill.
Turner, R. (2016). Gower handbook of project management. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
Walker, A. (2015). Project management in construction. John Wiley & Sons.
Steinke, G. H., Al-Deen, M. S., & LaBrie, R. C. (2017). NNOVATING INFORMATION
SYSTEM DEVELOPMENT METHODOLOGIES WITH DESIGN THINKING.
In Proceedings of the 5th International Conference on Applied Innovations in IT (pp. 51-
55).
Turner, J. R. (2014). Handbook of project-based management(Vol. 92). New York, NY:
McGraw-hill.
Turner, R. (2016). Gower handbook of project management. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
Walker, A. (2015). Project management in construction. John Wiley & Sons.
1 out of 19
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.