logo

Project Placement Design and Implementation - Assignment

24 Pages8089 Words57 Views
   

Added on  2021-02-19

Project Placement Design and Implementation - Assignment

   Added on 2021-02-19

ShareRelated Documents
TASK1Learning Contract Level 5 ProjectSection 1: Student and course detailsName:Tutor:Project/Placement name:Section 2: FocusAim/Problem StatementA learning contract refers to an agreement or document which outlines actionsof an individual where learner promises to achieve the academic success. Thisstatement is in conjunction with the positive results of the module which isProject/Placement Design and Implementation. It includes plan of action as well asin-depth analysis on how the mentioned sections or aim of the topic will be achieved.For this, researcher need to set some objectives, which need to be attain by themwithin given time frame and in effective manner (Agnew, Pill and Orrell, 2017). It hasbeen identified that the aim assist in improving my understanding and knowledge asit is self directed process. On the other hand, while conducting the research,investigator have faced a lot of problem related to time, money and resources. Alongwith this, sometimes researcher feel less motivated while conducting this research inan effective manner. There are some issues while preparing a business plan, as itneed to be within the amount given in the case study. So researcher need to mentioneach and every detail in effective manner. Learning Outcomes As a result of this project I am able:1.Build a portfolio of evidence using a range of methodologies and activities (logbooks; critical incident diaries; employer or supervisor feedback).2.Identify and articulate the development of work related skills mapped toevidence drawn from either the project or placement. 3.Demonstrate knowledge and understanding of the background and contextrelative to the chosen project or placement opportunity.
Project Placement Design and Implementation - Assignment_1
4.Evaluate the effectiveness of preparation and planning undertaken prior to theplacement or project implementation.Section 3: JustificationThe justification will be given by with the help of intense research, bycollecting data and facts and with the help of data analysis. As per the thoughts ofGregory Mocko, case studies are generally used to design research in order todetermine a phenomenon or to validate effective method or to generate effectivehypotheses. As per the analysis it has been identified that, one of the best and mosteffective method is case study in order to conduct the research in an effectivemanner. There are various objectives of this research which includes brief discussionon the topic, its aim and many others (Arbenz, 2016). As per the given case study ithas been identified that the owner wants to sell their existing business in order toestablish their new business venture which is Monet Holiday Park. They wants todevelop the holiday park in a land located at United Kingdom, Essex, Chelmsford.The land is located in Lot 3 which is a wonderful mixture of water, mature woodlandand pasture land. It is the place located outside the popular village. In order to startthis venture near a lake, owner wants huge amount as investment. For this, they selltheir both business which includes Monet Guest House and Monet Restaurant.Along with this both the owner sell their respective houses. Researcher needs todevelop a business plan, in order to establish their new business ventureseffectively, within given time period and within the amount. For this both the ownerhire an investigator in order to prepare a business plan after examining all theinternal and external factors. Researcher need to conduct PESTEL analysis alongwith Porter's five forces model for examining and analysing the whole market area. Section 4: MethodsIn the present method, researcher have choose simulation method so thatthey can conduct the whole research in an effective manner. Simulation methodrefers to a similar imitation or duplication of the project (Ball and Lewis, 2018). Invarious techniques simulation is being used by the researchers such as duplicationof large project. With the aid of this technique large number of researchers providetraining sessions, testing risky projects and work on hazardous machineries.Simulation is the process which is very interactive and by using effectivetechnologies they can develop similar sample projects. As per the view of Frontlinesolver 2019, it has been said that simulation refers to a flexible methodology used byorganisations as well as researchers to examine the behaviour of various businessactivities. In order to develop the new project it is required to make a dummy projectin advance. So that they can perform their task in an effective manner on a project.
Project Placement Design and Implementation - Assignment_2
Section 5: TimetableIn order to prepare a project or organising and managing a project in aneffective manner, time table plays very essential role. Effective timetable is neededfor conducting the research project in an effective manner. It is considered as abackbone of the research, as time table is required to perform each and every time(Ball and Lewis, 2019). For every researcher it is very important to have effectivetime table in order to complete the whole research within given time frame. Timetable is required to keep the whole project on track, to keep the work real andeffective, to maintain the quality as well as to schedule the whole project carefully.With the aid of effective time table, it results in reduction of cost, enhance theperformance as well as quality of the project. Time table includes various activitieswhich need to be done within given time frames. Please see table below:Plan of activities:WeekTaskActivitiesDuration1ACompile and draft thewhole project planwith roles12BReview the projectplans. 23CAnalysis of responses14DProject development, 45ESubmitting of a 5minutes teamelevator pitch16FReceive response 17GRefine business plan1
Project Placement Design and Implementation - Assignment_3
Chart:
Project Placement Design and Implementation - Assignment_4
Section 6: Evidence of accomplishmentBy the end of this project I will produce a portfolio containing:The learning contract and associated appendices Project reportSupporting evidence (log books, critical incident diaries, and employer and/or Tutorfeedback)Section 7: ReferencesSection 8: List of appendices to this learning contractWhat is a Learning Contract/Agreement/Plan?
Project Placement Design and Implementation - Assignment_5
It is a formal document that defines what is expected from you while working on thework based project. The learning contract sets out the parameters for the task thatyou are expected to undertake so as to meet the assessment criteria (learningoutcomes). You would need to focus on the elements given in the above proformafor learning and delineate the details in the learning contract/plan and focus on thefollowing key generic components:What are you going to learn? How are you going to learn it? What objectives are you going to set?What are the target date(s) for each activity and completion?How are you going to know that you have learned and achieved the setobjectives?What evidence are you going to generate to prove that you have learned it? This is your responsibility to tailor the above learning contract to the case study. Youare required to explicitly articulate what objectives you are going to set, whatactivities would be undertaken, which sources of information or data need to becollected to ensure that the learning outcomes are achieved. You would need todiscuss and seek guidelines from Tutors/supervisors. You would need to agree/negotiate the learning contract with your Tutor/supervisor, include the signed copyof the learning contract in final submission and submit it along with the portfolio. It isto ensure that transparent, feasible and verifiable set of activities are established inthe learning contract which enables you to meet the learning outcomes of theModule and achieves the assessment criteria.Signed:Tutor/SupervisorSigned:StudentDate:Learning Contract Appendix 1: Ethics Review FormName:
Project Placement Design and Implementation - Assignment_6

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Learning Contract Level Assignment
|25
|5918
|88

Project/Placement Design and Implementation - Assignment
|17
|5119
|101

Design and Implementation PDF
|16
|5382
|407

Placement Design and Implementation Assignment
|16
|5369
|69

Learning Contract Level 5 Project
|17
|3931
|468

Developing Skills for Director of Strategy Management
|22
|5161
|173