This document provides an analysis of tender documentation in construction projects. It includes a subcontractor/supplier spreadsheet and a covering letter. The evaluation of quotes and identification of risks for tendering and involving subcontractors and suppliers are discussed. The document also offers insights on selecting the preferred offer.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head:TENDER DOCUMENTATION ANALYSIS Tender documentation analysis Name of the Student Name of the University Author note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
2TENDER DOCUMENTATION ANALYSIS Table of Contents Introduction................................................................................................................................3 Task 1.........................................................................................................................................3 a) Subcontractor/ supplier spreadsheet for the trades................................................................3 b) Covering letter.......................................................................................................................3 Task 2.........................................................................................................................................5 Evaluation of Quote...................................................................................................................5 a) Identification of the main risks for tendering construction project........................................8 b) Identification of the main risks involved with involving sub-contractors and suppliers.......9 Conclusion................................................................................................................................10 References................................................................................................................................11
3TENDER DOCUMENTATION ANALYSIS Introduction The tendering process is used in private as well as public sectors for procurement of goods as well as services. However, the tendering party and respondent require being mindful while ensuring the accuracy of the documentation exchange along with the statements developedduringtheprocessofbidding.Thepresentstudydealswithpreparinga spreadsheet for the trades for the organisation, requesting quotes as well as for supplying bricks,aluminumwindowsanddoors.Acoverletterismadetoaccompanythe documentation. Also, the quotations are analysed, and preferred subcontractor for the trade is selected for the trade. On the other hand, the main risks to tendering for the construction project and involving with the sub-contractors are discussed in the current study. Task 1 a) Subcontractor/ supplier spreadsheet for the trades
4TENDER DOCUMENTATION ANALYSIS b) Covering letter SOUND INTERIORS PTY LTD ABN: 12 345 678 910 Email: soundinteriors@coldmail.com PO BOX 123 First Street 2011 Quote: 01001 Date: 14/03/2019 Attn: Construction Supervisor Sub: Tender Notice No. BE/BHQWU/2019/020/ Dated 10.03.2019 Due on 10.04.2019 We are pleased to present the proposal for your review against the Tender Notice No. BE/BHQWU/2019/020/ Dated 10.03.2019 Due to 10.04.2019. We have gone through the tender and now better understanding of the Dwell Building construction project requirements. For the last five years, our organisation has completed some high profile projects related to the construction industry and achieved great success as one of the leading contracting organisations located in Australia,WEST COAST PLASTERBOARD has been at the forefront in executing a wide range of construction projects for people, large corporations as well as the governments. We are thankful for the opportunity provided to us to participate in the tender. If you have any queries, please do not hesitate to get in contact directly.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
5TENDER DOCUMENTATION ANALYSIS Sincerely, [NAME] [Authorised Signatory] Task 2 Evaluation of Quote Thequotesareassessedwiththeobjecttoidentifytheofferthatencounters requirements of the agents as well as provides the best value for money.It is also an essential equability of the tender and able to withstand public scrutiny. The Evaluation Committee according to the conditions evaluates the submission of tender and compliance criteria using the methodology determined by the committee. StepDescriptionAction 1.Evaluate compliance Evaluate the submissions for determining if they are compliant. The non-compliant offers need to beexcludedfromtheassessment.Thequote submitted by West Coast Plasterboard have provided thelistofjobslikesupplyandinstallingBoral plasterboard to walls and ceiling upstairs. Hence, it is required to evaluate the non-compliant offers consist of the following. ï‚·Itisnotrequiredtocomplywiththe conditions for making participation.' ï‚·Also, it's essential to evaluate the legal action may result if the contract is awarded to the
6TENDER DOCUMENTATION ANALYSIS non-compliant submission (Tu,2015). ï‚·Compliance with the technical specifications like supply and installation of mini spa to ceiling, gyprock to the wall, metal angles as well as casing bead around the stairwell are essential to evaluate the tender. 2.Clarify offersIt may be essential seeking clarification from a supplier whether the offer/quote is not precise. On the other hand, allowing a supplier for providing description does not enable the suppliers to revise the original offer.Also, any type of clarification and response is required to be documented. 3.Evaluate qualitative criteria Theparticularstageengagesadetailed analysis of the offers against qualitative evaluation criteria as well as weighting that are specified in the RFQ or RFT. Also, the criteria for evaluation are requiredtomeet.Ifthequotesdonotmeetthe conditions to participate, it will be ruled out of the procedure. TheinstantquotemadebyWestCoast Plasterboard has initiated that the salesperson installs plasterboard,plaster cover with 50%deposit, and balanceoncompletion.Hence,theevaluation committed finds the right approach to be selected for the tender. 4.EvaluatingtenderThe offers from the government entities are
7TENDER DOCUMENTATION ANALYSIS whenprocuringfromthe government entities acceptedwherethepriceneedstobereflected incomplete cost attribution basis whether there are any private sector suppliers. Also,iftheoffersreceivedfromthe government authorities do not fulfill the conditions are declined. 5.Clarificationfrom the referees Whethermakinganydiscussionthata supplier with the nominated referee is significant that referred provided information is used to clarify the purposes(ErasmusBeyers,Mbuya,Rachidi& Kanjere, 2016). To make sure integrity, the discussions with the referees need to be adequately documented, 6.Selectionofthe preferred offer ThepreferredoffersentbyWestCoast Plasterboard is considered as representing the best value for money 7.Documentingthe evaluation report After completing the process of evaluation, the selection needs to be recorded in the evaluation report. The members of the committee need to sign the statement. Ontheotherhand,itconsistsofa comprehensive record of the method of assessing the rationale used in selecting the preferred supplier. The final decision of tender is needed to stand with public scrutiny. 8.Providingan evaluationreportand ThequoteprovidedbyWestCoast Plasterboardisconsideredbythecommittee
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
8TENDER DOCUMENTATION ANALYSIS reviewingcommittee endorsement endorsement and makes the evaluation report.The committeeevaluatesthequotewiththeabove- specified criteria and develops final documentation of the selection. a) Identification of the main risks for tendering construction project Mahmud (2015) mentioned that risk management is considered as significant when bidding for the construction project. One of the significant risks in the tender documentation process is a lack of clarity, which can lead to uncertainty as well as misunderstanding. Thus, it is essential to ensure that the tender procedure is complete and documented for the tenders that help to meet the requirements to be a conforming tender.In the residential dwelling project, multiple potential risks can arise when responding to the requests for making a quote or tenders. The risks are usually the same, as it would identify the building project. ï‚·The aspects that contribute a breach of contract and the resultant impact are important to identify (Scheepbouwer, Gransberg & Puerto, 2017). The process of terminating the contract is required to find out at the time of making a tender for the construction project. ï‚·Delays caused by several circumstances outside the control of the builders like delivery delays impact on delaying on completion of the project and subsequent delays in the process of payments are required to identify. On the other hand, it is necessary to ensure that the tender is liable for any delays and impact of this liability.
9TENDER DOCUMENTATION ANALYSIS ï‚·According to (Adafin, Rotimi & Wilkinson, 2015), evaluation of the cash flows to make sure that payments can be made to subcontractors of it is not paid by the client for a specific milestone. ï‚·However, positive risks like currency fluctuations as well as proposed changes to legislation could simplify the compliance requirements and minimize the overall costs of the contract. b) Identification of the main risks involved with involving sub-contractors and suppliers Cunningham (2015) mentioned that it is essential for a project manager in a dwell- building construction project to identify the significant risks involved with sub-contractors as well as suppliers involved with the project. The risks can be listed as followed. ï‚·It is necessary for the project manager to be aware of the risks before tackling a specific project. The sub-contractor needs to take prior tacking a project and identify thepossibleriskfactors.Hence,withoutthestepofrisksidentification,the subcontractors cannot develop a plan for management. ï‚·Also, prioritizing the risks is significant, as the sub-contractors need to allocate the resources properly toward mitigation of the risks, which are critical for the project (Reeves-Latour& Morselli, 2017). In this aspect, the sub-contractors need to be ranked as per the criteria like the possibility of occurring as well as the level of impact on the project. Financial risks have a probability that the subcontractors faced against delays of the project as well as manual errors. ï‚·Adverse physical conditions and obstructions can be the risks in the project. Also, defective materials, as well as workmanship with the contractor, are required to fix while dealing with sub-contractors and suppliers.
10TENDER DOCUMENTATION ANALYSIS ï‚·Also, due to negligence or breach of the contractor warranty while designing the project may generate risks in the project (Yan, Liu & Skitmore, 2018). Negligence of consultant and shortage of resources may produce risks in the dwell building project. ï‚·Assigning part of the project to a new subcontractor without making informed to the original subcontractor, financial issues of the contractor as well as non-adherence t the time-schedule and conditions of the contract are responsible for generating risks in the project with sub-contractors and suppliers. Conclusion The study concludes that tender documentation for a construction project and its evaluation is essential for the project. Hence, being a project manager, it is necessary to understand the criteria required to fulfill for the selection of the tender. On the other hand, the spreadsheet provided in the study would be helpful to know the process of tendering and get a brief about the quote. The tender assessment performed in the study would be useful to select the appropriate and suitable quote for the dwell building project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
11TENDER DOCUMENTATION ANALYSIS References Adafin, J., Rotimi, J.O. & Wilkinson, S., (2015). Why do the design stage elemental cost plan and final tender sum differ in New Zealand?.Journal of Financial Management of property and construction,20(2), pp.116-131. Cunningham, T., (2015). Tender Documentation for Construction Projects-An Overview. Erasmus Beyers, L.J., Mbuya, J.C., Rachidi, M.F. & Kanjere, M.M., 2016. Standardizing the Technical Tender Process in the Construction Industry.Journal of Economics,7(2-3), pp.161-168. Mahmud, M., (2015).A study of standard tender documents (goods) of PPR 2008 under un procurement manual(Doctoral dissertation, BRAC University). Reeves-Latour, M. & Morselli, C., (2017). Bid-rigging networks and state-corporate crime in the construction industry.Social Networks,51, pp.158-170. Scheepbouwer,E.,Gransberg,D.D.&LopezdelPuerto,C.,(2017).Construction engineering management culture shift: Is the lowest tender offer dead?.Frontiers of Engineering Management,4(1), p.49. Tu, Z., (2015). The Quality of the Tender Documents should Have a Few Elements.Science and Technology & Innovation, (3), p.22. Yan, P., Liu, J. & Skitmore, M., (2018). Individual, group, and organizational factors affectinggroupbiddingdecisionsforconstructionprojects.AdvancesinCivil Engineering, 6