Tendering Procedures for Mining Equipment - Wiley Construction Company
Verified
Added on  2023/06/11
|14
|2849
|148
AI Summary
This article discusses the tendering procedures for mining equipment by Wiley Construction Company. It covers the obligations of the principal and tenderers, evaluation of tenders, financial justification, contractual terms, and quality assurance requirements. The article emphasizes the importance of ethics and customer focus in the tendering process.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Name of the Student Name of the Professor City/ State Date/ Month/ Year
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1.Definition. Principal- The Wiley Construction Company request all the locals who are capable of offering the construction materials which shall be needed in the construction. Tenderer- Any person who has the capability of providing the services needed by the County Government. 1.2.Ethics This particular tender is based on the following principles; a)The tendering work shall only be taken by those tenderers who are capable of carrying out that particular work. b)This particular tender on mining equipment shall be done in a free and honest manner. c)The conditions for the tender shall be similar for all the tenderers. 1.3.Tendering Procedure covered The procedures for tendering is discussed below, 1.3.1.OBLIGATION OF THE PRINCIPAL 1.3.1.1. Pre-tender 1.1 The tenders are invited to hand over their Financial and Technical Proposal for transportation services needed. The submission of a technical report may be done in case the client has intentions to apply standard conditions of engagement and scales of fees for professional services. 1.2 The price to be charged for tender document shall not exceed 5000/= 1.3. The review of the tender document by the tenderer shall not be allowed before making the purchase of the certified document from the office1.4. Please note that the cost involves in preparation of the proposal and negotiating the contract is not recognized as a direct cost of the assignment
1.3.1.2.Tender documents 3.1 The English language shall be used in writing the proposal of the tenderers. 3.2. Examination of the documents constituting this RFP in should be looked at detail during the preparation of the Technical Proposal(Rees, 2012, p. 45). 3.3 During preparation of the technical proposal, the tenderers must give attention to the following; i.If the firm considers that it does not have all the expertise for the assignment ii.Alternative professional staff shall not be proposed and only one Curriculum Vitae may be submitted for each position(Moelmann, 2009, p. 178) 1.3.1.3. Selecting tenderers The principal shall apply pre-qualification criteria complying with the applicable code of practice in order to determine who shall be invited to tender and it will be an open tender. 1.3.1.4.Call for tenderers The Wiley Construction Company request any eligible tenderer to provide construction materials which shall be used in the construction of public schools and hospitals in the whole country. The prices set should be net inclusive of all taxes and shall remain valid for a period of 120 days from the closing date of the proposal. The filled tender documents MUST be enclosed in plain sealed envelopes marked with the tender number and delivered to the location provided below. The Operation Manager, The Wiley Building Company. The Chief Building Plaza, Room 231B The opening of Tenders shall take place instantly and in the presence of the representatives representing the tenderers. The selection of the tenderers shall be based on Quality Cost Based
Selection in accordance with the policies laid down in the Public Procurement and Asset Disposal Act(Collins, 2008, p. 142). 1.3.1.5. Tendering The principal shall have obligation to arrange the project funding before arranging the tendering process. 1.3.1.6. Tender Inquiries 3.5. The Technical Proposal shall provide the following information using the attached standard form i.A brief description of the firm organization and an outline of the recent experience of assignment of a similar nature. ii.A description of the methodology and work plan for performing the assignment. iii.The list of a proposed staff team iv.Estimates of the total staff inputs 3.6 The Technical Proposal shall not include any financial information 3.7. During the preparation of the technical proposal, the tenderers shall express the prices of their services in figures, commissions, and gratuities to be paid if there is any. The proposal must remain valid for 60 days after the submission date(Brook, 2016, p. 429). 1.3.1.7.Amendment of the document. The corrections on the document shall be allowed only 7 days after the collection of the tender document by the tenderers. The tenderers are requested to review the document keenly before the mentioned days ends. 1.3.1.8.Receipts and submission of tenders 3.8 The number of copies to be submitted are indicated above. 3.9 The original and all copies of Technical Proposal shall be placed in a sealed envelope labeled TECHNICAL PROPOSAL(Polishuk, 2009, p. 321)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
1.3.1.9.Closing of tenders 4.0The submission of the concluded financial and technical proposal shall be done to the address given above and LATE submission of a proposal shall not be acknowledged. The tender shall be closed on 2ndNovember 2018. 1.3.1.10.Evaluation of the tenders 4.1 None of the evaluators shall have access to the financial proposal until the conclusion of technical evaluation(Uher, 2009, p. 96). 4.2 The criteria mentioned below shall be used in the proposal evaluation by the committee appointed. POINTS The experience of the tenderer relating to this particular task20 Competence of the work plan proposed and style in replying to the terms of reference. 30 Proficiency and qualifications of the key staff for the assignment20 Sustainability to the transfer of Technology program30 Total Points100 4.3 The opening of financial proposal financial proposal shall be done in the presence of all the representatives in place of the tenderers. The prices and the name of every tenderer will be announced loudly when the financial proposal is opened(Moelmann, 2009, p. 197). 4.4 The selected tenderer shall be notified and those whose proposal shall not meet the credentials then the proposal shall be returned to them. Their financial process will also be returned to them immediately after completion of the selection process thereafter, the remaining tenderers will be invited to attend the opening of the financial proposals. 1.3.1.11. Negotiations and selection
4.5The negotiation will entail discussing the technical proposal, work plan or proposed methodology and any suggestions. 4.6 The negotiation will also include the contract draft form. 4.7 For the purpose of the negotiation, a team will be appointed by the procuring entity. 4.8 Award of the contract 4.9 The awarding of the contract will be done based on the negotiation. The tenderer who won the contract will be shortlisted while those who will not qualify, their financial proposal will be returned to them(Mann, 2009, p. 712). 5.0 The tenderer selected is expected to commence the assignment on the date and location specified in the document 5.1 The parties involved in the contract shall have it signed within 30 days from the date of notification of the contract award(Kiiver, 2014, p. 19). 1.3.2.OBLIGATIONS OF THE TENDERERS 1.3.2.1. Genuine belief 5.2 The client shall use his best effort to make sure he renders assistance to the contractor in case he is needed(Duyshart, 2013, p. 567). 5.3 All the services and facilities shall be made available to the contractor(Brook, 2016, p. 120). 1.3.2.2. Return of the documents All the proposals shall be filled keenly and after completion, they shall be dropped in the location stated above in a sealed brown envelope. 1.3.2.3. Evaluation of tender document 5.4 The finance committee will assist in determining whether the financial proposals are complete.
5.5 The formula for determining the financial score will be Sf= 100XFM/fwhereof is the financial score; F is the proposal price(Jacky, 2009, p. 124). 5.6 The evaluation of the tender will be done within 21 days commencing from the date of opening the tender. 5.7 The variations of the contract price shall not be allowed for the contracts not exceeding 12 months or one year(Uher, 2009, p. 347). 5.8 The processing of price variations will be done by procuring entity within 30 days. 1.3.2.4.Formulation of tender and estimates Not tender shall be allowed to participate in unlawful activities not highlighted in the contract such as failing to pay tender fees or bribing the company to be awarded the tender. All the relevant statutory and other legal requirements shall be observed and the tenderers shall not collide with other tenderers, provide or accept the secret commission, present inflated tenderers and influence of contract decision by improper means. The following estimates are made concerning the contract; 1.3.2.4.1. Project labor The assignment is estimated to involve 10 workers who are energetic and ready to work under minimum supervision. 1.3.2.4.2.Project plant The assignment needs vehicles around 4 vehicles which shall be used in transporting the construction materials to various places they are required. 1.3.2.4.3.Project material This particular assignment requires various building materials such as cement, bricks, iron sheets to take place. 1.3.2.4.4. Project subcontractors
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
The project only requires only 1 subcontractor who is capable of supplying construction materials needed for the construction to take place. 2.FINANCIAL JUSTIFICATION AND FINANCIAL ARRANGEMENT 2.1. Source of funds The tenderer shall submit their bank statement to ensure that they have enough money to start delivering the services to where they are required since the organization shall not be liable to underperformed work due to lack of finance. 2.2.Summary of cost Subtotal cost…………………………………………...………… (Amount and currency to be stated) The tax levied……………………………………………………………. (Amount and currency to be stated) Total amount needed…………………………………………. (Amount and currency to be stated) 3.Contractual terms 3.1.Nature of the Contract This contract is the meaning and interpretation and the relationship between the parties and shall be governed by the Laws of Australia. 3.3. Service Notice All the services needed shall be performed at the location specified at the beginning of the document(Kelvin, 2008, p. 56). 3.4. Assignment and Subcontracting
The subcontracting clause and other and other issues should be mentioned clearly. 3.5. Statutory Requirement All the contractors and subcontractors shall pay their fees, taxes, and duties under the law of Australia(Greg, 2008, p. 21) 3.6. Examination and Testing A thorough testing policy is needed to identify the project prerequisites and avoid conflict of contracts. 3.7. Progress and Programming of the work. Monitoring of the ongoing project is needed to ensure the project is completed at the time specified in the tender. 3.8. Suspension of works When the client is involved in illegal activities when performing the contract then it will lead to the suspension of the contract 3.9. Delay of works The work needs to be completed within the stipulated time since delays will lead to escalation in the cost. 3.10. Defects liability A proper defection policy is needed to deal with the issue of defect liability in case there is any. 3.11. Variations. Task variation and its principals needs to be followed to assist in the execution of the task. 3.12. Certificate and Payment Payment shall be made within 30 days of receipt of the invoice and relevant documents and in case of delays then the contractor shall be paid simple interest for each day of delay at a rate of three percentage points(Ayeni, 2011, p. 32).
3.13. Default or Insolvency Insolvency issue regarding the executing agency within the working structure must not let to pound on the project structure. 3.14. Termination The client shall terminate this contract by not less than 30 days’ written notice of termination to the contractor(Downings, 2011, p. 78). 3.15. Claims There is need to resolve claims such as contractual claims, monetary claims and infrastructural claims. 3.16. Dispute resolution The disputes arising that cannot be settled amicably within thirty days after receipt of one party of the other party request then for such amicable settlement maybe by either party or to the arbitration and final decision of a person to agree between the parties(Ross, 2014, p. 34). 4.Quality Assurance and Control requirements 4.1. Customer focus-Application of the customer focus principle shall enhance systematic managing of the customer relationship, measuring customer satisfaction and acting on them and researching and understanding the experiences and needs of the customers 4.2. Quality Leadership The organization need quality services to be provided to the customers and this will lead to an increase in the market share. 4.3. Involvement of people-People involvement in the ongoing events shall make people understand their role and contribution to the organization, creativity, and innovation in furthering the objectives of the organization.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4.4. Continuous improvement-The performance of the organization generally shall be a permanent objective since it will result in the acknowledgment of improvements and provision of training to the people(Greg, 2008, p. 34). 4.5.Process Approach- The principal shall require efficient managing activities and the related resources as a process to enable the firm realize the necessary activities needed in order to achieve better results, measuring the capabilities of the key activities and evaluation of risks. 4.6. System approach The system approach will assist in the determination market strategy development thus providing profit to the organization. 4.7. Continuous approach A continuous improvement in the organization will assist in the elimination of hindrances in the project execution. 4.8.Mutual benefit- The firm and the tenderer shall enhance their relationship and this will lead to identification and selection of suppliers, clear and open communication and sharing of information and future plans. 5.SAFETY REQUIREMENTS 5.1. Safety management review The organization shall ensure that they understand the safety measures involved in taking large projects. 5.2. Safety management and evaluation The weak areas should be identified before commencing the project and safety procedures should also be undertaken to help in maintaining utmost security system. 5.3. Safety implementation Safety policies should be implemented to avoid safety risk associated with the projects. 5.3.OHS policy
The organization shall allocate the budget for OHS professional, ratio safety officers to workers and appointment of OHS professional. .
References Brandt, T. (2007).Tendering.Wiley. Brook, M. (2016).Estimating and Tendering for Construction.Adventure Works Press. Collins, S. (2008).Effect of Competitive Tendering on Value in Construction.Grupo Planeta. Downings, M. (2011).Winning Government Tenders.Gakken. Duyshart, B. (2013).The Digital Document.Gakken. Greg, B. (2008).Construction Tendering and Estimating.Adventure Works Press. Jacky, T. (2009).Code of Practice for the Selection of Subcontractors.Sanoma. Kelvin, C. (2008).Tendering for Civil Engineering Contracts.HarperCollins. Kenyia, P. (2011).Principles of Tendering and Estimating.Hauffe Gruppe. Kiiver, P. (2014).The Practice of Public Procurement.Cambridge University Press. Lewis, H. (2012).Bids, Tenders, and Proposals.Scholastic. Mann, D. (2009).Facility Management.Adventure Works Press. Marsh, P. (2008).The Art of Tendering.Sanoma. Moelmann, L. (2009).The law of Performance Bonds.McGraw-Hill education. Polishuk, P. (2009).Competitive Tendering.China Publishing Company. Rees, G. (2012).Code of Estimating Practice.Hachette Livre. Ross, B. (2014).Total Facilities Management.Ridders digest. Sayers, P. (2012).Managing Sports and Leisure Facilities.Informa.