Lessons Learned in Project Management: Framework and Improvement Strategies | PMP20008 Report
VerifiedAdded on 2023/04/26
|6
|1476
|244
AI Summary
In this lesson we will discuss about improvement strategies and below are the summaries point:-
The text is a template for a report on lessons learned in a project management course.
The author planned to gather and document lessons learned with the help of other students.
The author faced a problem with time management and learned to focus on weekly tracking and schedule management.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

TERM 2 ASS_3
LESSONS LEARNT
Name: Insert full name
Student Number Insert student number
Campus: Insert campus or distance
Tutor: Insert tutor name
Tutorial number: Insert the tutorial number
LESSONS LEARNT
Name: Insert full name
Student Number Insert student number
Campus: Insert campus or distance
Tutor: Insert tutor name
Tutorial number: Insert the tutorial number
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Notes to the Author
[This document is a template. It has been tailored to suit the assessment. All fields within the template
should be completed as per the project scenario provided.
Blue italicized text provides an explanation of what should be included for each section. Remove all
blue text prior to submission. If there are two or more options for you to decide between, revert
the option you are keeping to black and remove the other.
[This document is a template. It has been tailored to suit the assessment. All fields within the template
should be completed as per the project scenario provided.
Blue italicized text provides an explanation of what should be included for each section. Remove all
blue text prior to submission. If there are two or more options for you to decide between, revert
the option you are keeping to black and remove the other.

1. INTRODUCTION
The course PMP20008 mainly reflects on the initiation and planning of project. The
main objective of the report is to reflect on the role which is generally played by the
students within the course. The paper mainly focuses on the framework of lessons learnt
and the steps that are generally planned in order to gather the document of the lessons
learnt and how it actually happened. Moreover, the paper also discusses the
improvement strategies that are generally required for resolving the problems that are
associated with the lessons learnt.
2A. LESSONS LEARNT: FRAMEWORK
2.1 How I planned to gather and document lessons learnt
When I planned to
identify and collect
lessons learnt
Who I planned to involve
in the process of
gathering lessons
How I planned to
document lessons
When I started the course
of PMP20008, I planned to
gather the lessons learnt.
I generally planned to
involve some of the
students of the universities
who can help in gathering
the lessons learnt.
I planned to document the
lessons in a weekly report
so that it can be used
further whenever required.
2B. LESSONS LEARNT: FRAMEWORK (CON’T)
2.2 What actually happened?
When I identified and
collected lessons learnt
Who I involved in the
process of gathering
lessons
How I documented
lessons
I collected the lessons
learnt after the end of the
course
I involved member of my
team in gathering lessons
they can also help in the
procedure of lesson learnt
gathering.
The lessons must be
documented in the form of
report as well as
presentation slides.
3.1 LESSON 1
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
When I get involved with
the PMP20008, I found
that I was unable to
manage the time of the
project effectively.
This situation made me
frustrated that I was unable
to meet the deadlines of
the project.
After analyzing the
situation, I found that time
management can be done
by focussing on weekly
tracking as well as
schedule management
plan.
The course PMP20008 mainly reflects on the initiation and planning of project. The
main objective of the report is to reflect on the role which is generally played by the
students within the course. The paper mainly focuses on the framework of lessons learnt
and the steps that are generally planned in order to gather the document of the lessons
learnt and how it actually happened. Moreover, the paper also discusses the
improvement strategies that are generally required for resolving the problems that are
associated with the lessons learnt.
2A. LESSONS LEARNT: FRAMEWORK
2.1 How I planned to gather and document lessons learnt
When I planned to
identify and collect
lessons learnt
Who I planned to involve
in the process of
gathering lessons
How I planned to
document lessons
When I started the course
of PMP20008, I planned to
gather the lessons learnt.
I generally planned to
involve some of the
students of the universities
who can help in gathering
the lessons learnt.
I planned to document the
lessons in a weekly report
so that it can be used
further whenever required.
2B. LESSONS LEARNT: FRAMEWORK (CON’T)
2.2 What actually happened?
When I identified and
collected lessons learnt
Who I involved in the
process of gathering
lessons
How I documented
lessons
I collected the lessons
learnt after the end of the
course
I involved member of my
team in gathering lessons
they can also help in the
procedure of lesson learnt
gathering.
The lessons must be
documented in the form of
report as well as
presentation slides.
3.1 LESSON 1
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
When I get involved with
the PMP20008, I found
that I was unable to
manage the time of the
project effectively.
This situation made me
frustrated that I was unable
to meet the deadlines of
the project.
After analyzing the
situation, I found that time
management can be done
by focussing on weekly
tracking as well as
schedule management
plan.

3.2 LESSON 1: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
The specific
improvement
strategy is to
implement
schedule
management
plan as well as
project tracking
strategy in
order to
manage time.
I would know
that the
strategy was
working as I
could measure
the change in
performance
after proper
management of
time.
This strategy is
achievable for
me as I can
focus on the
strategies of
time
management
for finishing
projects on
time.
This strategy is
relevant to
lesson 1 as it
will minimize
the problems
which are
associated with
time
management.
The strategy
will be
implemented in
2 hours by
properly
focussing on
time
management
as well as
schedule
management
plan.
4.1 LESSON 2
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
When I was engaged with
the PMP20008 course, I
identified problems in
accepting the changes
effectively.
This situation make sad as
any type of changes within
the project are not properly
acceptable my me.
After reflecting on the
situation, I analyzed that
proper development of
change management plan
is quite helpful for
managing the changes.
4.2 LESSON 2: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
The specific
improvement
strategy is to
use change
management
plan within the
project for
I would know
the strategy
was working as
I could be able
to measure the
changes that
occur after the
This strategy is
achievable for
me because I
can implement
the change
management
plan with the
This strategy is
relevant to
lesson 2 as it
will generally
help in
minimizing the
problems that
The strategy
will be
implemented in
1 month by
properly
implementing
the change
1.
Improvement
strategy
2. How to
measure if the
strategy works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
The specific
improvement
strategy is to
implement
schedule
management
plan as well as
project tracking
strategy in
order to
manage time.
I would know
that the
strategy was
working as I
could measure
the change in
performance
after proper
management of
time.
This strategy is
achievable for
me as I can
focus on the
strategies of
time
management
for finishing
projects on
time.
This strategy is
relevant to
lesson 1 as it
will minimize
the problems
which are
associated with
time
management.
The strategy
will be
implemented in
2 hours by
properly
focussing on
time
management
as well as
schedule
management
plan.
4.1 LESSON 2
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
When I was engaged with
the PMP20008 course, I
identified problems in
accepting the changes
effectively.
This situation make sad as
any type of changes within
the project are not properly
acceptable my me.
After reflecting on the
situation, I analyzed that
proper development of
change management plan
is quite helpful for
managing the changes.
4.2 LESSON 2: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
The specific
improvement
strategy is to
use change
management
plan within the
project for
I would know
the strategy
was working as
I could be able
to measure the
changes that
occur after the
This strategy is
achievable for
me because I
can implement
the change
management
plan with the
This strategy is
relevant to
lesson 2 as it
will generally
help in
minimizing the
problems that
The strategy
will be
implemented in
1 month by
properly
implementing
the change
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

improving the
situation.
implementation
of improvement
strategy.
guidance of
team members.
occurred due to
change
management.
management
strategies.
5.1 LESSON 3
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
When I was engaged with
the PMP20008 course, I
analyzed that I face lot of
communication issues.
The situation made me feel
sad as I was unable to
communication my view
points in front of large
groups of people.
After reflecting on the
situation, I analyzed that
the problems that are
related with communication
must be resolved
5.2 LESSON 3: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
The specific
improvement
strategy is to
engage in
group
discussions for
resolving the
problems that
are associated
with
communication.
I would know
the strategy
was working as
I could be able
to measure the
difference that
occurred after
the
improvement
within the
communication
skill.
This strategy is
achievable for
me because I
can easily
involve within
group
discussion with
different teams
for improving
my skills of
communication
This strategy is
relevant to
lesson 3 as it
will address the
problems that
are associated
with
communication
and helps in
minimizing the
issues.
The strategy
will be
implemented in
1 month by
properly
involving within
the group
discussions.
6. CONCLUSION
It can be concluded from the entire proper that the course PMP20008 reflects on the steps
that focuses on initiating and planning projects. The paper focuses on the lessons learnt
framework and evaluates the lessons that are generally learnt from getting involved within
the entire course. Moreover, the paper also evaluates the improvement strategies that are
used for resolving the issues that occurred after getting involved within the situation. It is
analyzed that the lessons that are learnt after getting involved within the course will be
quite beneficial for as it will guide in successfully executing the future projects effectively.
situation.
implementation
of improvement
strategy.
guidance of
team members.
occurred due to
change
management.
management
strategies.
5.1 LESSON 3
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
When I was engaged with
the PMP20008 course, I
analyzed that I face lot of
communication issues.
The situation made me feel
sad as I was unable to
communication my view
points in front of large
groups of people.
After reflecting on the
situation, I analyzed that
the problems that are
related with communication
must be resolved
5.2 LESSON 3: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
The specific
improvement
strategy is to
engage in
group
discussions for
resolving the
problems that
are associated
with
communication.
I would know
the strategy
was working as
I could be able
to measure the
difference that
occurred after
the
improvement
within the
communication
skill.
This strategy is
achievable for
me because I
can easily
involve within
group
discussion with
different teams
for improving
my skills of
communication
This strategy is
relevant to
lesson 3 as it
will address the
problems that
are associated
with
communication
and helps in
minimizing the
issues.
The strategy
will be
implemented in
1 month by
properly
involving within
the group
discussions.
6. CONCLUSION
It can be concluded from the entire proper that the course PMP20008 reflects on the steps
that focuses on initiating and planning projects. The paper focuses on the lessons learnt
framework and evaluates the lessons that are generally learnt from getting involved within
the entire course. Moreover, the paper also evaluates the improvement strategies that are
used for resolving the issues that occurred after getting involved within the situation. It is
analyzed that the lessons that are learnt after getting involved within the course will be
quite beneficial for as it will guide in successfully executing the future projects effectively.

7. REFERENCES
Hornstein, H. A. (2015). The integration of project management and organizational change
management is now a necessity. International Journal of Project
Management, 33(2), 291-298.
Kaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management
beyond project selection techniques: Understanding the role of structural
alignment. International Journal of Project Management, 33(1), 126-139.
Sears, S. K., Sears, G. A., Clough, R. H., Rounds, J. L., & Segner, R. O.
(2015). Construction project management. John Wiley & Sons.
Serra, C. E. M., & Kunc, M. (2015). Benefits realisation management and its influence on
project success and on the execution of business strategies. International Journal
of Project Management, 33(1), 53-66.
Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), 278-290.
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015).
Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Hornstein, H. A. (2015). The integration of project management and organizational change
management is now a necessity. International Journal of Project
Management, 33(2), 291-298.
Kaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management
beyond project selection techniques: Understanding the role of structural
alignment. International Journal of Project Management, 33(1), 126-139.
Sears, S. K., Sears, G. A., Clough, R. H., Rounds, J. L., & Segner, R. O.
(2015). Construction project management. John Wiley & Sons.
Serra, C. E. M., & Kunc, M. (2015). Benefits realisation management and its influence on
project success and on the execution of business strategies. International Journal
of Project Management, 33(1), 53-66.
Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), 278-290.
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015).
Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
1 out of 6
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.