Construction of Tertiary Care Hospital in Saar, Bahrain
VerifiedAdded on 2023/06/12
|9
|684
|130
AI Summary
This paper discusses the construction of a tertiary care hospital in Saar, Bahrain to provide proper healthcare facilities to the people of the region. The project team, milestones, and budget are also discussed.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Topic-Construction of tertiary care hospital
Assessment No
Student Name and ID
Student Email
Assessment No
Student Name and ID
Student Email
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Introduction
The paper mainly focusses on the “construction of
tertiary hospital” in Saar, which is one of the suburb
of Bahrain located alongside the village.
It is found that affluent ambassadors, families as
well as expatriates who mainly inhabit the area faces
lot of challenges as well as issues due to absence of
tertiary healthcare facility.
The people needs to visit tertiary hospital outside the
town in case of emergency after referral from
primary and secondary hospitals
The paper mainly focusses on the “construction of
tertiary hospital” in Saar, which is one of the suburb
of Bahrain located alongside the village.
It is found that affluent ambassadors, families as
well as expatriates who mainly inhabit the area faces
lot of challenges as well as issues due to absence of
tertiary healthcare facility.
The people needs to visit tertiary hospital outside the
town in case of emergency after referral from
primary and secondary hospitals
Project description
The project mainly focusses on the construction
of tertiary hospital in the region of Saar in
order to provide proper healthcare facility to
the people of Saar.
It is identified that with the construction of
tertiary hospital, people does not have to travel
out of the town during healthcare emergency
and can be able to get proper treatment.
The tertiary hospital that is constructed helps in
providing proper healthcare facility in context
to oncology, perinatology, and neonatology as
well as trauma surgery
The project mainly focusses on the construction
of tertiary hospital in the region of Saar in
order to provide proper healthcare facility to
the people of Saar.
It is identified that with the construction of
tertiary hospital, people does not have to travel
out of the town during healthcare emergency
and can be able to get proper treatment.
The tertiary hospital that is constructed helps in
providing proper healthcare facility in context
to oncology, perinatology, and neonatology as
well as trauma surgery
Team members
The team members of the project are listed in the table below:
Resource Name Type Number Max.
Units Std. Rate Cost/Use Accrue At Base Calendar
Project manager Work 1 100% $30.00/hr. $0.00 Prorated Standard
Finance manager Work 4 100% $20.00/hr. $0.00 Prorated Standard
Site supervisor Work 8 200% $25.00/hr. $0.00 Prorated Standard
Contractor Work 1 100% $25.00/hr. $0.00 Prorated Standard
Plumber Work 12 500% $20.00/hr. $0.00 Prorated Standard
Construction manager Work 7 300% $20.00/hr. $0.00 Prorated Standard
Risk manager Work 5 100% $20.00/hr. $0.00 Prorated Standard
Project planner Work 3 400% $25.00/hr. $0.00 Prorated Standard
Work 100% $27.00/hr. $0.00 Prorated Standard
The team members of the project are listed in the table below:
Resource Name Type Number Max.
Units Std. Rate Cost/Use Accrue At Base Calendar
Project manager Work 1 100% $30.00/hr. $0.00 Prorated Standard
Finance manager Work 4 100% $20.00/hr. $0.00 Prorated Standard
Site supervisor Work 8 200% $25.00/hr. $0.00 Prorated Standard
Contractor Work 1 100% $25.00/hr. $0.00 Prorated Standard
Plumber Work 12 500% $20.00/hr. $0.00 Prorated Standard
Construction manager Work 7 300% $20.00/hr. $0.00 Prorated Standard
Risk manager Work 5 100% $20.00/hr. $0.00 Prorated Standard
Project planner Work 3 400% $25.00/hr. $0.00 Prorated Standard
Work 100% $27.00/hr. $0.00 Prorated Standard
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Milestone list
Milestone Completion date
Milestone 1: Completion of project planning phase Thu 21-06-18
Milestone 2:Completion of project initiation phase Tue 11-12-18
Milestone 3:Completion of execution phase Fri 17-04-20
Milestone 4: Completion of project development phase Thu 28-05-20
Milestone 5: Completion of project closure phase Fri 05-06-20
Milestone Completion date
Milestone 1: Completion of project planning phase Thu 21-06-18
Milestone 2:Completion of project initiation phase Tue 11-12-18
Milestone 3:Completion of execution phase Fri 17-04-20
Milestone 4: Completion of project development phase Thu 28-05-20
Milestone 5: Completion of project closure phase Fri 05-06-20
Project cost
Budget calculation for construction of tertiary hospital in Bahrain
Items Cost ($)
Cost of materials 1,67,000
Cost of human resources 3,95,760
Cost of equipment’s 70,000
Maintenance cost 50,000
Cost for land 40,000
Cost for surgical equipment’s 70,000
Total cost/ budget 7,92,760
Budget calculation for construction of tertiary hospital in Bahrain
Items Cost ($)
Cost of materials 1,67,000
Cost of human resources 3,95,760
Cost of equipment’s 70,000
Maintenance cost 50,000
Cost for land 40,000
Cost for surgical equipment’s 70,000
Total cost/ budget 7,92,760
Conclusion
It can be concluded from the entire project that the construction of tertiary hospital
in Saar that is in Bahrain is quite beneficial as the people of that region will get
proper healthcare facility and they don’t need to travel out of the town in case of any
emergency occurs.
It is found that in this paper time as well as budget for the project is estimated with
the help of Microsoft project.
It can be concluded from the entire project that the construction of tertiary hospital
in Saar that is in Bahrain is quite beneficial as the people of that region will get
proper healthcare facility and they don’t need to travel out of the town in case of any
emergency occurs.
It is found that in this paper time as well as budget for the project is estimated with
the help of Microsoft project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Bibliography
Cameron, E. and Green, M., Making sense of change management: A complete guide to the
models, tools and techniques of organizational change. Kogan Page Publishers, 2015.
Costanzo, M., VanderSluis, B., Koch, E.N., Baryshnikova, A., Pons, C., Tan, G., Wang, W., Usaj,
M., Hanchard, J., Lee, S.D. and Pelechano, V., A global genetic interaction network maps a
wiring diagram of cellular function. Science, 353(6306), p.aaf1420, 2016.
Fitzpatrick, B.J., Determining the Optimal Work Breakdown Structure for Defense Acquisition
Contracts. Air Force Institute of Technology WPAFB United States, 2016.
Freeman, R.E. and Ginena, K., Rethinking the purpose of the corporation: Challenges from
stakeholder theory. Notizie di Politeia, 31(117), pp.9-18, 2015.
Cameron, E. and Green, M., Making sense of change management: A complete guide to the
models, tools and techniques of organizational change. Kogan Page Publishers, 2015.
Costanzo, M., VanderSluis, B., Koch, E.N., Baryshnikova, A., Pons, C., Tan, G., Wang, W., Usaj,
M., Hanchard, J., Lee, S.D. and Pelechano, V., A global genetic interaction network maps a
wiring diagram of cellular function. Science, 353(6306), p.aaf1420, 2016.
Fitzpatrick, B.J., Determining the Optimal Work Breakdown Structure for Defense Acquisition
Contracts. Air Force Institute of Technology WPAFB United States, 2016.
Freeman, R.E. and Ginena, K., Rethinking the purpose of the corporation: Challenges from
stakeholder theory. Notizie di Politeia, 31(117), pp.9-18, 2015.
1 out of 9
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.