Operations and Project Management: A Review and Critique of Tesco's Operations Management Principles
Verified
Added on 2023/06/07
|18
|4887
|141
AI Summary
This report provides an overview of Tesco's operations management principles, including a review and critique of their implementation, an analysis of their effectiveness, and a discussion of continuous improvement and lean principles. Recommendations for improvement are also provided.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
ID Unit Number and TitleUnit 187 – Operations and Project Management TitleReview and Critique of Operations Management (Part 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Content Part 1: Business Report 1. An introduction to chosen organizationp 2. An explanation of operation vs operations managementp 3. A review and critique of the implementation of operations management principles within the chosen organizationp 4. An analysis of the extent to which the operations management of the organisation in the case study meets the requirements of the organizationp 5. Discussion of continuous improvement as a philosophy and describe the Lean principlesp 6. A continuous improvement plan, including your justified recommendations for improvement, based on your review and critique of operations management principles within your organizationp 7. Conclusionp Referencesp 2
1. An introduction to chosen organization The report on operations management will be prepared on the companyTesco,which is a retail company in UK. Company is operating all around world and is offering groceries, food and other goods as well. It began to trade in 1947 as a public company. By the year 2001,Tescointroduces the range of clothing. By utilizing the name of Fresh and Easy it has marked its presence in markets of united states and therefore become globally popular. The company have 200 outlets and in dreaming to open up more in the upcoming years.Tesco has managed to maintain the sustainability in the environment by going green through opening up of zero carbon super market(Sparks, 2019 ). The main aim behind this report is to get on overview on the operations management ofTesco.The report will further cover principles to management of operations and also the philosophy of continuous improvement and lean principles. The report will also cover the continuous improvement plan along with some justification and recommendations. 2. An explanation of operation vs operations management Operation management-it is the process that convert input into product and services by including the direction and control. It took into account all functional fields as processes are found in all activities of business. Concluding to this “operation” refers to particular department. Therefore the major concern rests with over viewing, controlling and designing. It is narrow concept in which the activities are restricted to one department. Whereas, Operations management-it is the administrating of practices of business with the aim to create efficiency at high level in organization as a whole. This is concerned with the profit maximization from the point of view of whole organization. Referring to this “operations” includes whole organization that covers all department and not just a particular department. Therefore it is a broader concept. Managing the operations at Tesco- Tescohas applied various strategies that prove to be successful in smooth running of its operations . At present is is dealing with the financial services, electronic, furniture and also home decor(Alam, 2020). Company is managing its operations in certain way- 3
keeping the prices somewhat related to that prevailing in the market for the commodities thatTescois offering. In order to have competitive advantage and worthwhile effects,Tescois applying the strategy of manipulation of marketing elements. The tag line “Every little helps” used by company is helpful in focusing on small margins which is the prior consideration for earning the desired returns and provides discounts to customer when they shop in huge quantity. Tescoalso operates in online mode in order to serves the customer at best possible manner by undertaking the unique brand name likeTesco Direct.Operating online and offline depends on the products required and demands of people. But it has a positive influence on the customers to buy their products(Barnes, 2018). Tescois also operating with the gifting strategies in order to have remarkable sales. Also it tends to solve some public issues that is they play publicity stunt in order to mark their presence on wider base. Tescohas huge crowd of front service workers that have direct interaction with the customers. Due to this advantageTescois able to operate its retail business very well along with the coordination of people and management. For operating smoothly,Tescois offering good quality service by implementing robust exercises of recruitment that attracts and bring on the most potential candidates. In order to operate with the calculative part,Tescohas analytical team comprised of statisticians and engineers. 3. A review and critique of the implementation of operations management principles within the chosen organization Every company in the marketplace exist for the purpose of delivering the goods and services to its customers. Hence the role of operations management is of crucial importance as it supports and assist the effective achievement of goals ofTesco.By using the principles of operations management,Tescotends to improve the activities and therefore desires to achieve the outcome in way of(Brown, Bessant and Jia, 2018)- 4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
1.an enhanced quality of product 2.No delayed delivery 3.Effective and efficient workforce 4.Appropriate utilization of resources 5.Left over with little closing stock 6.Decreased work-in-process. Tescoin avoiding the problems associated with the effective management of operations follow the principles of operations management that includes - Reality- Company is focusing on the major issue that has wider impact on the business and not on the part of it. Therefore it has been observed that there no one way to solve the problem. It is advisable to go in depth in order to identify the root of it and solving it accordingly. Humility- Managers at knows their roles and responsibilities and also respects the limitations imposed on them therefore neglects and not the use the concept of trial and error. Furthermore for the purpose of long term, this principle is recommendable to save the money and time that brings out the positive outcome. Organization- All elements of production process ofTescois consistent and predictable because they are related to each other. It is suggested that in order to make positive outcome out of management of operations and promotion of consistency and predictability it is required an appropriate production planning(Efendi, Raharjo and Suhanto, 2021). Accountability- Tescois into making of person accountable for the performed operation. Therefore managers atTescohave checks and balances that guarantees accountability. Change- The main reason behind the issues of operations is change that is emerging.Tescohas adopted certain modern change methodologies that includes but are not restricted to Six 5
sigma, lean and Kaizen. The methodologies mentioned above is helpingTescoin making various decisions with respect to up-gradation and replacements. Quality control- Operations to manage successfully requires quality control asTescobelieves that avoiding this would not help in guarantying the quality of offered product and services. This involves getting advantage in areas like 1.Procurement 2.Logistics 3.material management 4.warehousing It is required forTescoto keep its primary focus on the monitoring the raw materials because it moves through the entire logistics part. Success- Tescoensures that the reason for its success is only its customers whom the product or service is offered. As once customer gets satisfied, they tend to come back more with bigger impact. Know your competition- Tescofollows procedure to know their competitors , understand them with their operational level and customers and what provides them competitive edge. Causality- Problems provides indication before its occurrence.Tescoin this context first formulate the operations and then eliminate the same. Company uses the reports generated from the enterprise planning system and manufacturing execution system to analyze the inefficiencies and blockage point. Consumer Collaboration- Managers atTescohas the capability to gain the insight of customer with what they believe in enhancing the product or service(Paavola and Cuthbertson, 2022). Taylor's theory of scientific management- 6
as per this theory production of whole organization can be increased by increasing the productivity level of the individual. ThereforeTescoadopted this in context to planning of operating activities. This also required a proper understanding of the responsibilities to the managers and workers. 4. An analysis of the extent to which the operations management of the organisation in the case study meets the requirements of the organization BeingTescois operating on wider base that has global effect and have huge market share, exist with some objectives to be achieved like- Revenue objectives-Profitability is the only key that derives the existence of any business. SoTesconeeds to ensure that it must have consistent profits and in order to track the sustainability of firm revenue measurement is the great way. Operational objectives-this includes the confirmation with respect to the arrival of supplies from the manufacturer at same time at which it occur always. This helps Tescoin running smoothly Productivity and performance-Employees is considered as base to the organization so it is required forTescothat its employees remain constant for driving the revenue that in return enhance the satisfaction level of customer. Customer satisfaction-Customer is the reason for which organization produces the goods or services(Shakir and Iqbal, 2018). SoTescoin this context conducts a survey of its customer to understand that it is delivering the correct value and also drive of loyalty. Growth-Growth can be measured in long term and short term.Tescooverview its growth level through traffic on website, turnover and sales of product. Operations management therefore meets the requirements of Tesco as it is inclusive of various important functions that derive the success of company- Product design- this is associated with the introduction of new product that will be offered to customer. Therefore it is the responsibility of operational manager that products sold meet the needs of consumer and relates to present market trend. 7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Forecasting- this is associated with the prediction with the use of past data. For the product ofTesco,the responsibility of operational manager is to identify the demand of consumer. Supply chain Management-this is related to the managing of process of production that ranges from raw material to the finished product. Therefore the supply chain management ofTescoincludes production, shipping, distribution and delivery of products. Delivery management- the responsibility of this is handled by operational manager. The manager ofTescoensures that goods delivered to customer as per prescribed time and also a follow up is done with the consumer to ensure with the requirements met of the product. 5. Discussion of continuous improvement as a philosophy and describe the Lean principles Continuous improvement plan-it refers to the group of activities which is created for the purpose of bringing slow improvements to products or services or the processes through constant review, action and measurement. Lean method of production-this provides the management a way to focus on cutting out waste in aid of ensuring the quality. Therefore this approach is applicable to all fields of business that includes design, production and distribution. The lean principles forTescoaims to cut cost my making it efficient and also responsive to the needs of markets. The lean approach to managing operations is about- In context toTesco To do things in simple manner to do things in better manner In the continuous process of improvement involve employees. There are certain key aspects of lean production that includes time based management, simultaneous management, just in time production, cell production, kaizen and quality improvement(Terpend and Shannon, 2021). The most common used is Kaizen for the continuous incremental improvements and also reduced cost, simplified work processes, reduced waste and improved customer satisfaction. 8
6. A continuous improvement plan, including your justified recommendations for improvement, based on your review and critique of operations management principles within your organization A continuous improvement plan ofTesco- SourcePrincipleOutcomes COSTKaizenThis is adopted by theTesco in order to reduce the cost and is used for the purpose of ensuring the continuous improvement of operation and also of employees. This helps the company in decreasing the waste. SAFETYEnterprise resource planning This helpsTescoin managing along with the integration of different parts and resources of business(Alam, 2020). This is also used by the company for day to day work like accounting and project management. DELIVERYSupply chain managementThis approach is used by Tescoin handling the flow of production of business that initiates from raw source to final delivery of product. When lean is compared to six sigma- Six sigma is considered an approach to drive the management where as lean measures the defects in the process and eliminates this until it becomes some defects. Both lean and six sigma focus on eliminating the waste. But they demonstrates that root cause of the waste is different. It is recommended therefore forTescoto use Lean principles. Conclusion 9
The report prepared above concludes that project and operations management is an important component ofTesco.Also report concluded the differentiating factor of operation and operations management. Also the application of operation management principles in context toTesco.The principle applicable to the company is also recommended that best suited the company. Further the report covered philosophy of continuous improvement through a proper plan and also an overview of its applicability to the company. 10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
References Sparks, L., 2019. Tesco: how supply chain strategy supports retail success.The Business & Management Collection. Alam, M.K., 2020. A systematic qualitative case study: questions, data collection, NVivo analysis and saturation.Qualitative Research in Organizations and Management: An International Journal. Barnes, D., 2018.Operations management: an international perspective. Bloomsbury Publishing. Brown, S., Bessant, J. and Jia, F., 2018.Strategic operations management. Routledge. Efendi, M., Raharjo, T. and Suhanto, A., 2021, October. DevSecOps Approach in Software Development Case Study: Public Company Logistic Agency. In2021 International Conference on Informatics, Multimedia, Cyber and Information System (ICIMCIS(pp. 96-101). IEEE. Paavola, L. and Cuthbertson, R., 2022. Redefining capabilities as drivers of adaptation, incremental change, and transformation: recognizing the importance of strategic and operational intent on performance.Journal of Management & Organization, pp.1-18. Shakir, H.M. and Iqbal, B., 2018. Application of Lean principles and software solutions for maintenance records in continuing airworthiness management organisations.The Aeronautical Journal,122(1254), pp.1263-1274. Terpend, R. and Shannon, P., 2021. Teaching lean principles in nonmanufacturing settings using a computer equipment order quotation administrative process.Decision Sciences Journal of Innovative Education,19(1), pp.63-89. Alam, M.K., 2020. A systematic qualitative case study: questions, data collection, NVivo analysis and saturation.Qualitative Research in Organizations and Management: An International Journal. 11
Table of Content Part 2: Project Portfolio Project Titlep An overview of the case study you have been givenp An explanation of each stage of the PLC that applies to your selected project, including supporting documentation for each stage (e.g., business case, the project plan, cost-benefit analysis and work breakdown structure): Project initiationp Project planningp Project executionp Project closurep Analysis of the project methodologies and tools usedp Review and critically evaluate the effectiveness of the PLC in application to your project using the appropriate theories models and conceptsp 12
Project Title In-House Food An overview of the case study you have been given The casestudy is givenof a largemanufacturing organizationwhichis operating in the Midlands. It operates in an extensive site in various buildings. Currently, the company have about 1,250 employees on its manufacturing site. All the employees are being assigned different tasks and different job roles which includes office staff and factory workers (Haiyan,Haiyun and Dafeng,2021). As a member of Project and Programme office, the manager require a plan to manage the house project. This project includes the ways to reduce the movement of staff in the premises during the lunch break and efforts to implement a healthy lifestyle of employees as a part of CSR and also put emphasis on reduction of absenteeism with an organization of the individual. Proper actions and measures to manage these problems will help an organization to operate its operations properly and make the employee to stay motivated and satisfied towards organization performance. The organization may provide meals to their employees and refreshments in between their breaks. The organization must focus on building a comfortable and cooperative work environment to retain their employees for long term. An explanation of each stage of the PLC that applies to your selected project, including supporting documentation for each stage (e.g., business case, the project plan, cost- benefit analysis and work breakdown structure): Project initiation To initiate a specific project the very first stage is project initiation. At this stage business problems and opportunities are being identified which helps an organization to plan for a suitable solution (Janowiak,2020). A Project team is being appointed at this stage that will help the business to plan for the problems that the business are being associated with and which leads in decreasing the productivity of operations and workforce and helps the enterprises to find solutions to the problems addressed. In context to the project In-House food,whichfocusesonprovidingitsworkforcewiththecomfortableandexciting 13
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
environment. In order to engage more and more employee they should focus on arranging different activities for their employees like games, dance, providing refreshments and healthy foodwhich helps the organization to keep their employees enthusiast and make their employees interact with each other to have a coordination in the workplace (Vesikivi, Bautersand Holvikivi,2021). The time duration required to initiate this employee engagement activities is around half month. Project planning This stage of project requires the project team to develop the proper planning for all the operations that need to be operated in order to properly maintain the health , reduce the movement of staff within the premises and to reduce the absenteeism of employee. A project plan will include scope of planning, resources utilization, budget planning and more. Project execution This stage requires that whatever is being plan need to be executed into actions for the purpose of achievement of goals and objectives. This stage requires the leaders to check the progress and in case any changes required then implementing corrective measures for the proper execution of the plans. This stage involves opportunities and threats to a business which need to be managed properly. Project closure It is the stage where the projects have been on the stage of completion. It is the end of the project life cycle. Project can come to end through a written project closure, disband of your team, which can result in closure of the specified project. NAME OF THE COMPANY:In-House Food VISION AND OBJECTIVES:The vision of the organization is develop the overall proficiencyof theiremployeesby ensuring theirsafetyby adoptingCSR and providing meals and refreshment to motivate and satisfy their employeesand bring cooperation in overall environment (Arcos-Medina and Mauricio, 2020). MISSION:The mission is to have a cooperative and peaceful work environment by offering them healthy meals and employee engagement activities. EXECUTIVE SUMMARY:The purpose of the project is to reduce absenteeism of employees in the workplace, to reduce their movement in the workplace and also 14
follow Corporate social responsibilities which helps the organization to develop a supportive workforce and coordinated work environment. What is the new idea of innovation? The project focuses on reducing the absenteeism, reduction of movement of employees because of big lunch breaks (Palmer and et.al, 2021). The company has opened a cafeteria at the workplace itself, where the employees can place an order through phones and it has reduce the time of lunch breaks. The company also look formed on the health and safety aspects of the employees. Why is it an opportunity: It is an opportunity for the business to establish a trustworthy and secured workplace where employee can feel homely to perform their work. How does it improve on what we already have? The projectplan willhelpsan organizationto bringengagementandcooperationof employees towards accomplishmentof organizational objectives by providing meals and healthy environment to its employees. What resources do you need to bring it about- people,equipment, time etc.? In order to implement this project plans properly the company needs a kitchen with all the utensils and cooking equipment with that the company also require to have some 3-4 people to do the same work. What are the risks and potential benefits? Risks is the uncertainty whether the plans will succeed or not or whether it results in reducing the absenteeism, movement of individuals and provide better health and safety in the workplace (Costa and et.al, 2018). How will the cash flow works- The company needs a investment which result in outflow of cash to provide meals to the individual and with that the company is providing health and safety measures to its employees to feel committed to the organization. Business strategy for the project 15
Advantages This project focus on the management of internal functioning of the company and also helps in increasing the overall productivity of the workforce as it helps to reduce the absenteeism and movement of employee during the lunch breaks which helps in the overall performance and management (Ren and et.al, 2022). Disadvantages This project plan is required some cost to be incurred which leads to outflow of cash. It also leads the business to get distracted from its main activities that is main objectives. Analysis of the project methodologies and tools used It is a methodology that focuses on implementation of project properly by managing different activities by breaking them into small parts. It focuses on continuous improvement byconstantcollaborationwithstakeholderandimprovementintheoperation.The methodology follows different tools and techniques which helps to properly implement the functions. The different techniques and tools are discussed as follows- Kanban is atechniques that helps the leaders to analyze the progress in the projects and managing the changes that are required to be implemented in order to avoid any disturbance in the smooth functioning of operations. Scrum is other technique for project management , it focuses on diving the project into different group and assigning them the task to plan for their own to achieve the objectives of their specified group. Projectmanagementtoolsareusedby thebusinessto haveeffectiveoperationsand performance . It gives the manager the ability to adopt a hierarchy of tasks for the effective completion of objectives. It determines the dependency of actions required in a project. There are different tools to manage the projects which include network diagram, Gantt charts, Work breakdown structure and many more (Sharma and et.al, 2021). Project Leadership is the act of leading the team for successful completion of projects and objectives. Leadership is required to manage the efforts of the employees towards the project accomplishment and managing and taking measures as and when required for achieving the completion of projects. 16
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Review and critically evaluate the effectiveness of the PLC inapplicationtoyourprojectusingtheappropriate theories models and concepts Project life cycle is the stages that are required to be performed by the mangers for successful completion of the project.PLC is important to achieve the objectives effectively within specified time with proper implementation and guidance (Yusen and et.al, 2018). The advantages and disadvantages of Project life cycle is- Advantages of using Project life cycle:PLC is flexible in nature which can be adopt changes accordingly whenever required.It is significant top determine the risk associated with the project. It enables the organization to achieve their targets. It is an innovative features used to mange projects. Disadvantages of using Project life cycle: The major disadvantages of PLC is that it requires training and development of the individuals to understand the process of undertaking any project which can increase the cost of the company resulting in financial loss. There are also variousother performancemanagementtools that can be used by an organization which can help a business to review and assess the operations and helps the leader to avoid the unproductive efforts that can lead to non accomplishment of tasks. It includes the deliverables, key performance indicators, benchmarks and many more. Another advantage of using performance management tools is because they are reliable and holds validity which allows the organization to adopt them in their organization performance (Hu, 2019). Hence the models and concepts help the company to have effective operations and performance. 17
References Arcos-Medina and Mauricio, 2020. The influence of the application of agile practices in software quality based on ISO/IEC 25010 standard.International Journal of Information Technologies and Systems Approach (IJITSA),13(2), pp.27-53. Costa and et.al, 2018. Life Cycle Assessment of a shale gas exploration and exploitation project in the province of Burgos, Spain.Science of the Total Environment,645, pp.130-145. Haiyan, Haiyun and Dafeng, 2021, April. Research on the Dilemma and Countermeasures of Employees' Right to Privacy Based on Big Data. In2021 2nd International Conference on Big Data and Informatization Education (ICBDIE)(pp. 21-28). IEEE. Hu, 2019. Building impact assessment—A combined life cycle assessment and multi-criteria decision analysis framework.Resources, Conservation and Recycling,150, p.104410. Janowiak, 2020. Epic Systems Corp. v. Lewis: A Fatal Mistake for Employees.DePaul Bus. & Comm. LJ,18, p.127. Palmer and et.al, 2021. Life-cycle greenhouse gas emissions and net energy assessment of large-scale hydrogen production via electrolysis and solar PV.Energy & Environmental Science,14(10), pp.5113-5131. Ren and et.al, 2022. Six Sigma for improving tensile strength: a case study in the impregnating resin manufacturing company.International Journal of Lean Six Sigma. Sharma and et.al, 2021. Application of Lean Six Sigma framework for improving manufacturing efficiency: a case study in Indian context.International Journal of Productivity and Performance Management. Vesikivi, Bauters and Holvikivi, 2021. Agile Methodologies in Learning with Design Thinking. InTechnology Supported Active Learning(pp. 75-90). Springer, Singapore. Yusen and et.al, 2018, October. Digital twin concept in managing industrial capital construction projects life cycle. In2018 Eleventh International Conference" Management of large-scale system development"(MLSD(pp. 1-3). IEEE. 18