Scope of testing for the ONLINE MOVIE RENTAL APPLICATION
VerifiedAdded on 2022/10/13
|19
|2333
|164
AI Summary
In scope: Functional requirements: As part of the functional requirements, Unit testing will be done for identifying if all of the units of the application is working properly or not After conducting the unit testing, next integration testing will be performed to ensure that the application is working properly after all of the application modules are properly integrated User acceptance testing will be done to identify if the application is consistent with the requirements as specified by the client during the project initiation and planning Non-functional requirements: Performance of the application
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Name of the Student
Name of the University
Author Note
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Name of the Student
Name of the University
Author Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
1. Scope of testing:
The scope of the testing described here defines the functional and non-functional
requirements that will be tested as part of the testing process. In order to ensure that the
testing process is effective and accurate, the testing process will consider the requirements
that are specified here in this context. Features that are not included in the scope statement
will not be considered and those features will not be tested while testing for the application is
executed.
1.1. In scope:
Functional requirements:
As part of the functional requirements, Unit testing will be done for identifying if all
of the units of the application is working properly or not
After conducting the unit testing, next integration testing will be performed to ensure
that the application is working properly after all of the application modules are
properly integrated
User acceptance testing will be done to identify if the application is consistent with
the requirements as specified by the client during the project initiation and planning
Non-functional requirements:
Performance of the application in different platforms including web platform will be
conducted
Security of the application will be tested to identify security flaws in the application
Scalability of the application will be tested to identify how the application integrates
with different platforms
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
1. Scope of testing:
The scope of the testing described here defines the functional and non-functional
requirements that will be tested as part of the testing process. In order to ensure that the
testing process is effective and accurate, the testing process will consider the requirements
that are specified here in this context. Features that are not included in the scope statement
will not be considered and those features will not be tested while testing for the application is
executed.
1.1. In scope:
Functional requirements:
As part of the functional requirements, Unit testing will be done for identifying if all
of the units of the application is working properly or not
After conducting the unit testing, next integration testing will be performed to ensure
that the application is working properly after all of the application modules are
properly integrated
User acceptance testing will be done to identify if the application is consistent with
the requirements as specified by the client during the project initiation and planning
Non-functional requirements:
Performance of the application in different platforms including web platform will be
conducted
Security of the application will be tested to identify security flaws in the application
Scalability of the application will be tested to identify how the application integrates
with different platforms
2
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Along with these some other important non-functional requirements that will be tested are:
Reliability of the application
Availability of the application
Usability of the application
Efficiency of the application
2. Out of scope:
Some of the features, which will not be tested because the application requirement
specification does not include that, are the followings:
User Interfaces
Hardware Interfaces
Software Interfaces
Database logical
Communications Interfaces
3. Assumptions:
Some of the assumptions that are considered in this project are:
each release of the application which is accompanied by a note is provided with
information about all of the implemented features and how they impact the system
all “bugs-blockers” are analysed with high priority
all the bugs that are found are fixed before the next software release is done
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Along with these some other important non-functional requirements that will be tested are:
Reliability of the application
Availability of the application
Usability of the application
Efficiency of the application
2. Out of scope:
Some of the features, which will not be tested because the application requirement
specification does not include that, are the followings:
User Interfaces
Hardware Interfaces
Software Interfaces
Database logical
Communications Interfaces
3. Assumptions:
Some of the assumptions that are considered in this project are:
each release of the application which is accompanied by a note is provided with
information about all of the implemented features and how they impact the system
all “bugs-blockers” are analysed with high priority
all the bugs that are found are fixed before the next software release is done
3
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
all documents are up-to-date and those documents are delivered to the testing team in
time
all necessary equipment and tools that are required for the testing are provided and
those tools are ready for testing
schedule for the testing process is reviewed if there are any obstacles that affect
testing activity
project has required budget throughout the project execution
project has required expertise required for executing the testing process
support and assistance is received from the client throughout the project execution so
that the project is successfully executed
testing process is effective and the application is consistent with the client
requirements
4. Test scheduling details:
Task Name Duration Start Finish
Testing plan designed for the online movie rental application 46 days
Tue 30-07-
19
Tue 01-10-
19
(A) Information gathering 3 days
Tue 30-07-
19
Thu 01-08-
19
a1) Prepare for Interview 1 day
Tue 30-07-
19
Tue 30-07-
19
a2) Conduct Interview 1 day Wed 31- Wed 31-07-
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
all documents are up-to-date and those documents are delivered to the testing team in
time
all necessary equipment and tools that are required for the testing are provided and
those tools are ready for testing
schedule for the testing process is reviewed if there are any obstacles that affect
testing activity
project has required budget throughout the project execution
project has required expertise required for executing the testing process
support and assistance is received from the client throughout the project execution so
that the project is successfully executed
testing process is effective and the application is consistent with the client
requirements
4. Test scheduling details:
Task Name Duration Start Finish
Testing plan designed for the online movie rental application 46 days
Tue 30-07-
19
Tue 01-10-
19
(A) Information gathering 3 days
Tue 30-07-
19
Thu 01-08-
19
a1) Prepare for Interview 1 day
Tue 30-07-
19
Tue 30-07-
19
a2) Conduct Interview 1 day Wed 31- Wed 31-07-
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
07-
19
19
a3) Summarize Findings 1 day
Thu 01-08-
19
Thu 01-08-
19
(B) Test Planning 5 days
Thu 01-08-
19
Wed 07-
08-
19
b1) Build Test Plan 3 days
Thu 01-08-
19
Mon 05-08-
19
b2) Define the Metric Objectives 1 day
Tue 06-08-
19
Tue 06-08-
19
b3) Review / Approve Plan 1 day
Wed 07-
08-
19
Wed 07-08-
19
(C) Test Case Design 12 days
Thu 08-08-
19
Fri 23-08-
19
c1) Design Function Tests 5 days
Thu 08-08-
19
Wed 14-08-
19
c2) Design GUI Tests 3 days
Thu 15-08-
19
Mon 19-08-
19
c3) Define the System / Acceptance Tests 1 day Tue 20-08-
19
Tue 20-08-
19
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
07-
19
19
a3) Summarize Findings 1 day
Thu 01-08-
19
Thu 01-08-
19
(B) Test Planning 5 days
Thu 01-08-
19
Wed 07-
08-
19
b1) Build Test Plan 3 days
Thu 01-08-
19
Mon 05-08-
19
b2) Define the Metric Objectives 1 day
Tue 06-08-
19
Tue 06-08-
19
b3) Review / Approve Plan 1 day
Wed 07-
08-
19
Wed 07-08-
19
(C) Test Case Design 12 days
Thu 08-08-
19
Fri 23-08-
19
c1) Design Function Tests 5 days
Thu 08-08-
19
Wed 14-08-
19
c2) Design GUI Tests 3 days
Thu 15-08-
19
Mon 19-08-
19
c3) Define the System / Acceptance Tests 1 day Tue 20-08-
19
Tue 20-08-
19
5
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Review / Approve Design 3 days
Wed 21-
08-
19
Fri 23-08-
19
(D) Test Development 2 days
Mon 26-
08-
19
Tue 27-08-
19
d1) Develop Test Scripts 1 day
Mon 26-
08-
19
Mon 26-08-
19
d2) Review / Approve Test Development 1 day
Tue 27-08-
19
Tue 27-08-
19
(E) Test Execution/Evaluation 2 days
Wed 28-
08-
19
Thu 29-08-
19
e1) Setup and Testing 1 day
Wed 28-
08-
19
Wed 28-08-
19
e2) Evaluation 1 day
Thu 29-08-
19
Thu 29-08-
19
(G) Test Execution/Evaluation 5 days
Fri 30-08-
19
Thu 05-09-
19
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Review / Approve Design 3 days
Wed 21-
08-
19
Fri 23-08-
19
(D) Test Development 2 days
Mon 26-
08-
19
Tue 27-08-
19
d1) Develop Test Scripts 1 day
Mon 26-
08-
19
Mon 26-08-
19
d2) Review / Approve Test Development 1 day
Tue 27-08-
19
Tue 27-08-
19
(E) Test Execution/Evaluation 2 days
Wed 28-
08-
19
Thu 29-08-
19
e1) Setup and Testing 1 day
Wed 28-
08-
19
Wed 28-08-
19
e2) Evaluation 1 day
Thu 29-08-
19
Thu 29-08-
19
(G) Test Execution/Evaluation 5 days
Fri 30-08-
19
Thu 05-09-
19
6
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
g1) Setup and Testing 4 days
Fri 30-08-
19
Wed 04-09-
19
g2) Evaluation 1 day
Thu 05-09-
19
Thu 05-09-
19
(J) execute testing 15 days
Fri 06-09-
19
Thu 26-09-
19
Unit testing 3 days
Fri 06-09-
19
Tue 10-09-
19
Integration testing 3 days
Wed 11-
09-
19
Fri 13-09-
19
User acceptance testing 3 days
Mon 16-
09-
19
Wed 18-09-
19
Performance testing 3 days
Thu 19-09-
19
Mon 23-09-
19
Security testing 3 days
Tue 24-09-
19
Thu 26-09-
19
(K) Summarize/Report Spiral Test Results 3 days
Fri 27-09-
19
Tue 01-10-
19
k1) Perform Data Reduction 1 day Fri 27-09-
19
Fri 27-09-
19
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
g1) Setup and Testing 4 days
Fri 30-08-
19
Wed 04-09-
19
g2) Evaluation 1 day
Thu 05-09-
19
Thu 05-09-
19
(J) execute testing 15 days
Fri 06-09-
19
Thu 26-09-
19
Unit testing 3 days
Fri 06-09-
19
Tue 10-09-
19
Integration testing 3 days
Wed 11-
09-
19
Fri 13-09-
19
User acceptance testing 3 days
Mon 16-
09-
19
Wed 18-09-
19
Performance testing 3 days
Thu 19-09-
19
Mon 23-09-
19
Security testing 3 days
Tue 24-09-
19
Thu 26-09-
19
(K) Summarize/Report Spiral Test Results 3 days
Fri 27-09-
19
Tue 01-10-
19
k1) Perform Data Reduction 1 day Fri 27-09-
19
Fri 27-09-
19
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
k2) Prepare Final Test Report 1 day
Mon 30-
09-
19
Mon 30-09-
19
k3) Review / Approve the Final Test Report 1 day
Tue 01-10-
19
Tue 01-10-
19
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
k2) Prepare Final Test Report 1 day
Mon 30-
09-
19
Mon 30-09-
19
k3) Review / Approve the Final Test Report 1 day
Tue 01-10-
19
Tue 01-10-
19
8
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
5. Team members’ role and responsibility:
No
.
Member Tasks
1. Test
Manager
Responsible for managing the entire project which include project
planning, designing project strategies and implementing those
strategies for project execution
Describe project directions so that the project is consistent with the
project scope and ensuring that the project is in accordance with the
consumer requirements
Ensure appropriate resources for the project
2. Test Recognizing and defining proper test techniques/tools/automation
architecture
Analyse and review the proper Test Approach required for executing
the tests, Log results, Report the defects for providing and
comprehensive overview to the client about the testing of the
application of online movie rental service
Ensure outsourcing for the project when required so that the required
skills for the project is ensured for ensuring success in the project
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
5. Team members’ role and responsibility:
No
.
Member Tasks
1. Test
Manager
Responsible for managing the entire project which include project
planning, designing project strategies and implementing those
strategies for project execution
Describe project directions so that the project is consistent with the
project scope and ensuring that the project is in accordance with the
consumer requirements
Ensure appropriate resources for the project
2. Test Recognizing and defining proper test techniques/tools/automation
architecture
Analyse and review the proper Test Approach required for executing
the tests, Log results, Report the defects for providing and
comprehensive overview to the client about the testing of the
application of online movie rental service
Ensure outsourcing for the project when required so that the required
skills for the project is ensured for ensuring success in the project
9
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
3. Developer
in Test
Executes the test cases, test program, test suite that is required for
testing the application
4. Test
Administrat
or
Responsible for developing and ensuring test environment and
managing and maintaining assets for ensuring effective and efficient
execution of the project
Provide assistance to the Tester to properly use the test environment
required for test execution
5. SQA
members
Responsible for executing quality assurance
Responsible for ensuring that the testing process is consistent with
specified requirements
6. Deliverables:
Test Deliverables:
Test deliverables, which will be provided to the client, are described in this context:
Before testing phase
Test plans document: it contains the scope of the testing along with the testing
activities that is considered in the project
Test cases documents: it provides a detailed description of the criteria that are
considered for identifying if the modules of the online movie booking application,
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
3. Developer
in Test
Executes the test cases, test program, test suite that is required for
testing the application
4. Test
Administrat
or
Responsible for developing and ensuring test environment and
managing and maintaining assets for ensuring effective and efficient
execution of the project
Provide assistance to the Tester to properly use the test environment
required for test execution
5. SQA
members
Responsible for executing quality assurance
Responsible for ensuring that the testing process is consistent with
specified requirements
6. Deliverables:
Test Deliverables:
Test deliverables, which will be provided to the client, are described in this context:
Before testing phase
Test plans document: it contains the scope of the testing along with the testing
activities that is considered in the project
Test cases documents: it provides a detailed description of the criteria that are
considered for identifying if the modules of the online movie booking application,
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
which are tested in the project, satisfies requirements specified for the testing of the
particular module. For example, testing of the login module is considered successful if
it does not allow consumers to login to the application if incorrect login details is
provided to the application
Test Design specifications: it provides detailed description of the features that are
tested in the project
During the testing
Test Tool Simulators: it provides description of the simulators that are considered for
testing various features of the application
Test Data: it provides description of the data that are considered for testing different
features of the application. For example, testing the login feature of the application test
data that are considered in this context are username of the registered users and password
provided when that particular user registered for the online movie rental application
Test Trace-ability Matrix - Error logs and execution logs
After the testing is completed
Test Results/reports
Defect Report
Installation/ Test procedures guidelines
Release notes
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
which are tested in the project, satisfies requirements specified for the testing of the
particular module. For example, testing of the login module is considered successful if
it does not allow consumers to login to the application if incorrect login details is
provided to the application
Test Design specifications: it provides detailed description of the features that are
tested in the project
During the testing
Test Tool Simulators: it provides description of the simulators that are considered for
testing various features of the application
Test Data: it provides description of the data that are considered for testing different
features of the application. For example, testing the login feature of the application test
data that are considered in this context are username of the registered users and password
provided when that particular user registered for the online movie rental application
Test Trace-ability Matrix - Error logs and execution logs
After the testing is completed
Test Results/reports
Defect Report
Installation/ Test procedures guidelines
Release notes
11
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
7. Testing tools:
S.No. Tool Type Used for Used by
1. Test Management Tool Test Managing, scheduling, defect
logging, tracking and
analysis.
testers
2. Configuration
management tool
For Implementation, execution,
tracking changes
All Team
members
3. Static Analysis Tools Static Testing Developers
4. Test data Preparation
Tools
Analysis and Design, Test data
generation
Testers
5. Test Execution Tools Implementation, Execution Testers
6. Test Comparators Comparing expected and actual
results
All Team
members
7. Coverage measurement
tools
Provides structural coverage Developers
8. Performance Testing
tools
Monitoring the performance,
response time
Testers
9. Project planning and For Planning Project Managers
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
7. Testing tools:
S.No. Tool Type Used for Used by
1. Test Management Tool Test Managing, scheduling, defect
logging, tracking and
analysis.
testers
2. Configuration
management tool
For Implementation, execution,
tracking changes
All Team
members
3. Static Analysis Tools Static Testing Developers
4. Test data Preparation
Tools
Analysis and Design, Test data
generation
Testers
5. Test Execution Tools Implementation, Execution Testers
6. Test Comparators Comparing expected and actual
results
All Team
members
7. Coverage measurement
tools
Provides structural coverage Developers
8. Performance Testing
tools
Monitoring the performance,
response time
Testers
9. Project planning and For Planning Project Managers
12
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Tracking Tools
10. Incident Management
Tools
For managing the tests Testers
8. Types of tests that needs to be executed:
Type of test Description of testing Purpose of the testing Acceptance criteria
Unit testing Here individual module
of the application will
be tested. The modules
that will be tested here
are login to the system,
accessing movies
featured on the
application, making
payment for movie
rental and provide
feedback for the system
To identify if the
modules of the
application is working
properly or not
Users after
providing correct
login details should
be able to login to
the system.
There should be no
issue while
accessing the
movies form the
application and
along with that
users should not
find any issue while
selecting and
adding movies from
the application to
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Tracking Tools
10. Incident Management
Tools
For managing the tests Testers
8. Types of tests that needs to be executed:
Type of test Description of testing Purpose of the testing Acceptance criteria
Unit testing Here individual module
of the application will
be tested. The modules
that will be tested here
are login to the system,
accessing movies
featured on the
application, making
payment for movie
rental and provide
feedback for the system
To identify if the
modules of the
application is working
properly or not
Users after
providing correct
login details should
be able to login to
the system.
There should be no
issue while
accessing the
movies form the
application and
along with that
users should not
find any issue while
selecting and
adding movies from
the application to
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
13
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
the cart integrated
with the application
After adding the
movies to the cart
the cart should
provide payment
options including
online payment
through the credit
and debit card
The link provided
for feedback for
service should work
perfectly when
users select and an
feedback form
should be generated
without any issue
Integration testing The individual modules
are integrated and tested
together for identifying
the performance of the
application
To identify issues with
the application so that
the application after
commercial release
works perfectly
All of the modules
should work
perfectly for
providing an
integrated
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
the cart integrated
with the application
After adding the
movies to the cart
the cart should
provide payment
options including
online payment
through the credit
and debit card
The link provided
for feedback for
service should work
perfectly when
users select and an
feedback form
should be generated
without any issue
Integration testing The individual modules
are integrated and tested
together for identifying
the performance of the
application
To identify issues with
the application so that
the application after
commercial release
works perfectly
All of the modules
should work
perfectly for
providing an
integrated
14
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
experience to the
consumers. For
example after a
consumer select a
movie from the
application, it
should
automatically added
to the cart for
payment which
means there should
be proper
integration between
the related modules
so that the overall
application is
effective and
efficient
User acceptance testing Here the client reviews
the performance of the
application and provides
feedback if any
modification is required
To ensure that the
client is satisfied with
the project and
enhance stakeholder
satisfaction
Client should be
fully satisfied and
the client
requirements should
be integrated
properly with the
project execution
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
experience to the
consumers. For
example after a
consumer select a
movie from the
application, it
should
automatically added
to the cart for
payment which
means there should
be proper
integration between
the related modules
so that the overall
application is
effective and
efficient
User acceptance testing Here the client reviews
the performance of the
application and provides
feedback if any
modification is required
To ensure that the
client is satisfied with
the project and
enhance stakeholder
satisfaction
Client should be
fully satisfied and
the client
requirements should
be integrated
properly with the
project execution
15
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Performance testing Performance of the
application is tested
across different
platforms with reference
to the different modules
of the application
To identify if there is
any issue in the
performance of the
application when it is
accessed on different
platforms
Application should
have no
performance issues
and it should offer
similar experience
irrespective of the
platforms
Security testing Security of the user data
such as username and
password, payment
information including
credit card and debit
card information are
tested. It particularly
tests the encryption and
authentication level for
these important data
To identify security
issue with the
application
The application
should not allow
anyone who are not
authorized to access
these data from the
database of the
application
Scalability testing Scalability of the
application is tested and
it is reviewed how
easily and efficiently the
application is exported
across different
platforms
To identify if there is
any issue in the
scalability of the
application which is
required for integration
of the application
across different
platforms
the application
needs to be easily
portable across
different platforms
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Performance testing Performance of the
application is tested
across different
platforms with reference
to the different modules
of the application
To identify if there is
any issue in the
performance of the
application when it is
accessed on different
platforms
Application should
have no
performance issues
and it should offer
similar experience
irrespective of the
platforms
Security testing Security of the user data
such as username and
password, payment
information including
credit card and debit
card information are
tested. It particularly
tests the encryption and
authentication level for
these important data
To identify security
issue with the
application
The application
should not allow
anyone who are not
authorized to access
these data from the
database of the
application
Scalability testing Scalability of the
application is tested and
it is reviewed how
easily and efficiently the
application is exported
across different
platforms
To identify if there is
any issue in the
scalability of the
application which is
required for integration
of the application
across different
platforms
the application
needs to be easily
portable across
different platforms
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
16
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
9. Risks associated with the testing and procedure to mitigate them:
Risk Description Strategy for mitigation
Scope of the project is not
well defined
Execution of the project is not
in accordance with the client
requirements
Interview with the client to
identify their requirements and
then analyzing those requirements
with the project team to ensure
that the requirements of the
project are communicated
properly and along with the
execution of the project is in
accordance with the requirements
Lack of technical skills for
implementing the project
The project does not have the
required technical skills that
are required for implementing
the testing process for the
mobile application of renting
movies online
Training is provided to the project
team and if required outsourcing
is considered for arranging the
required skill set through human
resource procurement
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
9. Risks associated with the testing and procedure to mitigate them:
Risk Description Strategy for mitigation
Scope of the project is not
well defined
Execution of the project is not
in accordance with the client
requirements
Interview with the client to
identify their requirements and
then analyzing those requirements
with the project team to ensure
that the requirements of the
project are communicated
properly and along with the
execution of the project is in
accordance with the requirements
Lack of technical skills for
implementing the project
The project does not have the
required technical skills that
are required for implementing
the testing process for the
mobile application of renting
movies online
Training is provided to the project
team and if required outsourcing
is considered for arranging the
required skill set through human
resource procurement
17
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Project is delayed compared
to the schedule defined during
the project planning
Lack of planning for
execution of the scheduled
project activities has delayed
the project of testing the
online movie rental
application
Project tracking software is
deployed for preparing effective
project schedule and track
execution of the project execution
for ensuring that these activities
are being executed properly
according to the project schedule
which is defined for the project
Project budget is increased
compared to the estimated
budget
The project requires extra
investment for completing the
testing process
The budget for the project should
be designed such that it include
some extra budget so that it is
applied when there is budget
overflow in the project and along
with that budget tracking software
should be used for ensuring that
the financial resources are applied
properly in the project
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Project is delayed compared
to the schedule defined during
the project planning
Lack of planning for
execution of the scheduled
project activities has delayed
the project of testing the
online movie rental
application
Project tracking software is
deployed for preparing effective
project schedule and track
execution of the project execution
for ensuring that these activities
are being executed properly
according to the project schedule
which is defined for the project
Project budget is increased
compared to the estimated
budget
The project requires extra
investment for completing the
testing process
The budget for the project should
be designed such that it include
some extra budget so that it is
applied when there is budget
overflow in the project and along
with that budget tracking software
should be used for ensuring that
the financial resources are applied
properly in the project
18
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Change of requirements
during the project execution
The client wants something
new to be executed in the
testing process, which is not
included in the project scope
and these needs to be done
within the approved time and
budget
The client should communicate
the requirement for extra time and
budget for implementing the new
requirements as those were not
specified in the scope of the
project approved by the client
when the project plan was
provided to the client before the
execution of the project
TESTING PLAN FOR THE ONLINE MOVIE RENTAL APPLICATION
Change of requirements
during the project execution
The client wants something
new to be executed in the
testing process, which is not
included in the project scope
and these needs to be done
within the approved time and
budget
The client should communicate
the requirement for extra time and
budget for implementing the new
requirements as those were not
specified in the scope of the
project approved by the client
when the project plan was
provided to the client before the
execution of the project
1 out of 19
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.