The Learning Communities LC-01A) building will go through following phases:
Initiation – This stage includes project charter document.
Planning - This stage includes project scope statement, work breakdown structure and
Gantt chart.
Execution - This stage includes progress tracking and project status.
Control - This stage includes goal tracking and budget tracking
Closure - This stage includes project analysis and project report.
The project shall use Waterfall Project management methodology because the construction
project has fixed phases and until current phase is completed, the next stage cannot be started.
Hence, waterfall project management methodology is best suited for the proposed project.
Initiation phase – During this phase, following items are discussed and framed:
Project scope – The scope of the project includes following items:
Resource recruitment
Purchase construction material
Procure safety and health measures for the involved resources
Frame quality metrics for the building
The scope does not include following items:
Marketing of the building
Inauguration of the building for the users
Deliverables – Following are key deliverables of the project:
Contract sign-off
Budget estimation
Building design sign-off
Award contract
Timeframe – The project starts from 29th May 2019 and ends on 1st Oct 2019.
Planning phase uses WBS, Gantt chart and Critical path.
Critical path includes following critical activities:
Create project charter
Finalize project charter
Sign-off
Hire contractor and sub-contractor
Create building design
Estimate material requirement
Estimate budget
Finalize health safety requirements
Create project plan
Order construction material
Receive construction material
Building construction
Painting
Install electricity
Conduct quality check
Track deliverables
Release resources
Document lesson learnt
Project stakeholders:
LC-01A owner
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
LC-01A sponsor
Project manager
Design architect
Contractor
Laborers
Stakeholder plan is used to manage the stakeholders.
Communication mediums:
Emails
Instant messages
SharePoint
Meeting
Face-to-Face
Risk register
Cost Overrun
Schedule overrun
Scope creep
Health related issues
Procurement plan
Stakeholder
Type of Contract
Documentation
Estimate
Schedule
Budget plan
Budget shall be estimated using Time-phased estimation method
Execution phase
The status reports are used to track the project progress. Tools such as Tracking Gantt can be
used to track the deliverables.
Closure phase
Closure based activities within the project would involve assessment of the project
performance. The assessment would need to be done for each of the individuals within the
project’s team. Simultaneously, the team’s performance and capabilities would also be
assessed.
chevron_up_icon
1 out of 2
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]