To analyse the importance of project planning for green projects in the construction industry of UK CHAPTER 1: INTRODUCTION1 1.1 Background1 1.2 Rationale 2 1.3 Aim 4 1.4 Objectives4 1.5 Method of analysis 4 CHAPTER 2: LITERATURE REVIEW6 2.1 Introduction 6 2.2 Literature Review 6 Theme 1: To identify role of different managing factors that affect green projects in construction industry 6 Theme 2: To ascertain the challenges that project managers encounter in managing green construction project managing factors. 8 Theme 4: To analyse the importance of
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
To analyse the importance of
project planning for green projects
in the construction industry of UK
project planning for green projects
in the construction industry of UK
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents
CHAPTER 1: INTRODUCTION....................................................................................................1
1.1 Background.......................................................................................................................1
1.2 Rationale...........................................................................................................................2
1.3 Aim...................................................................................................................................4
1.4 Objectives.........................................................................................................................4
1.5 Method of analysis...........................................................................................................4
CHAPTER 2: LITERATURE REVIEW ........................................................................................6
2.1 Introduction......................................................................................................................6
2.2 Literature Review.............................................................................................................6
Theme 1: To identify role of different managing factors that affect green projects in
construction industry..............................................................................................................6
Theme 2: To ascertain the challenges that project managers encounter in managing green
construction project managing factors....................................................................................7
Theme 3: To Determine the critical areas skills that can respond to those challenges..........8
Theme 4: To analyse the importance of project planning for green project for maintaining
sustainability environment......................................................................................................9
CHAPTER 3: RESEARCH METHODOLOGY ..........................................................................11
3.1 Introduction....................................................................................................................11
3.2 Research philosophies....................................................................................................11
3.3 Research approach..........................................................................................................11
3.4 Research Design.............................................................................................................12
3.5 Research strategy............................................................................................................12
3.6 Data collection methods.................................................................................................13
3.7 Sampling.........................................................................................................................13
3.8 Data analysis ..................................................................................................................14
3.9 Ethical collection............................................................................................................15
3.10 Research limitation.......................................................................................................15
CHAPTER 4: DATA ANALYSIS ...............................................................................................17
4.1 Introduction....................................................................................................................17
CHAPTER 1: INTRODUCTION....................................................................................................1
1.1 Background.......................................................................................................................1
1.2 Rationale...........................................................................................................................2
1.3 Aim...................................................................................................................................4
1.4 Objectives.........................................................................................................................4
1.5 Method of analysis...........................................................................................................4
CHAPTER 2: LITERATURE REVIEW ........................................................................................6
2.1 Introduction......................................................................................................................6
2.2 Literature Review.............................................................................................................6
Theme 1: To identify role of different managing factors that affect green projects in
construction industry..............................................................................................................6
Theme 2: To ascertain the challenges that project managers encounter in managing green
construction project managing factors....................................................................................7
Theme 3: To Determine the critical areas skills that can respond to those challenges..........8
Theme 4: To analyse the importance of project planning for green project for maintaining
sustainability environment......................................................................................................9
CHAPTER 3: RESEARCH METHODOLOGY ..........................................................................11
3.1 Introduction....................................................................................................................11
3.2 Research philosophies....................................................................................................11
3.3 Research approach..........................................................................................................11
3.4 Research Design.............................................................................................................12
3.5 Research strategy............................................................................................................12
3.6 Data collection methods.................................................................................................13
3.7 Sampling.........................................................................................................................13
3.8 Data analysis ..................................................................................................................14
3.9 Ethical collection............................................................................................................15
3.10 Research limitation.......................................................................................................15
CHAPTER 4: DATA ANALYSIS ...............................................................................................17
4.1 Introduction....................................................................................................................17
4.2 Thematic analysis...........................................................................................................17
CHAPTER 4: CONCLUSION AND RECOMMENDATION ....................................................22
4.1 Introduction....................................................................................................................22
4.2 Conclusion......................................................................................................................22
4.3 Recommendation............................................................................................................23
REFERENCES .............................................................................................................................27
CHAPTER 4: CONCLUSION AND RECOMMENDATION ....................................................22
4.1 Introduction....................................................................................................................22
4.2 Conclusion......................................................................................................................22
4.3 Recommendation............................................................................................................23
REFERENCES .............................................................................................................................27
CHAPTER 1: INTRODUCTION
TITLE: To access the factors for managing the green projects in the construction industry
of UK: Based on the comparative analysis of ISG and Kier.
1.1 Background
Project Manager plays a crucial role in a project’s success. To manage any project
successfully, it is required to manage project effectively with efforts, green projects have become
the most essential part of the sustainability development. Despite several studies,
The purpose of present study is to determine importance of green projects in construction
company (Guo and et.al., 2014). Energy demand in the building sector is expected to grow faster
parallel with the economic and population growth. Construction management and technology
are key factors for construction projects.
In terms of global concern over climate and sustainability, people are more concerned
about green construction in order to protect environmental growth. It also helps to bring new
challenges and growth for company purposes.
For this present research, ISG and Kier will be taken into action. It is a leading global
technology, research and advisory firm. This is UK’s biggest construction group that is
established under the growth. In terms of making green projects, study has been helped to
provide importance of green projects factor for better sustainability growth that helps to maintain
better economic growth in the UK environment. On the other hand, managers are facing
challenges and issues to manage green constructions projects.
Sustainability in building is the most concerning matter of fact in order to reduce the
global warming and increasing percentage of pollution It gives better and challenging in order to
make the best approachable target goals (Harrison and Lock, 2017). Due to high chemical
technologies', population brings double-quick forward results and accelerated making growth.
Overall, it brings long lasting effects.
The aim of this study is to focus on proper project managing factors planning in terms of
green projects while preparing long effectiveness. Along with that, it makes the best effective
processes and target market goals. Overall, it takes long term process and challenging growth,
which involves some hurdles while maintaining the project managing factors. Study also focuses
1
TITLE: To access the factors for managing the green projects in the construction industry
of UK: Based on the comparative analysis of ISG and Kier.
1.1 Background
Project Manager plays a crucial role in a project’s success. To manage any project
successfully, it is required to manage project effectively with efforts, green projects have become
the most essential part of the sustainability development. Despite several studies,
The purpose of present study is to determine importance of green projects in construction
company (Guo and et.al., 2014). Energy demand in the building sector is expected to grow faster
parallel with the economic and population growth. Construction management and technology
are key factors for construction projects.
In terms of global concern over climate and sustainability, people are more concerned
about green construction in order to protect environmental growth. It also helps to bring new
challenges and growth for company purposes.
For this present research, ISG and Kier will be taken into action. It is a leading global
technology, research and advisory firm. This is UK’s biggest construction group that is
established under the growth. In terms of making green projects, study has been helped to
provide importance of green projects factor for better sustainability growth that helps to maintain
better economic growth in the UK environment. On the other hand, managers are facing
challenges and issues to manage green constructions projects.
Sustainability in building is the most concerning matter of fact in order to reduce the
global warming and increasing percentage of pollution It gives better and challenging in order to
make the best approachable target goals (Harrison and Lock, 2017). Due to high chemical
technologies', population brings double-quick forward results and accelerated making growth.
Overall, it brings long lasting effects.
The aim of this study is to focus on proper project managing factors planning in terms of
green projects while preparing long effectiveness. Along with that, it makes the best effective
processes and target market goals. Overall, it takes long term process and challenging growth,
which involves some hurdles while maintaining the project managing factors. Study also focuses
1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
on the project planning for construction companies. To enhance the importance of maintains
proper environment growth and ensuring less using pollutant sources.
1.2 Rationale
On the basis of past research and study, it has been seen that construction industry has
faced many challenges related to environment from past few years. Effective environment
sustainability is highly needed in present scenario in order to fulfill the long term goals. (He and
et.al., 2015). Present study has been focusing on project management that impacts on
organizational goals and targeted market plans. There is a huge need of green project managing
factors in the project management in order to ensure green management plan. Overall, it brings
extended term challenges that help to prefer long lasting efforts and growth. Green project is the
environmental challenge. Besides, it brings new challenges and growth in order to make the best
approachable target goals.
The purpose of the study is to define importance of green planning in order to sustain
long lasting efforts and goals. In order to take new steps and fast forwards results and growth.
Company should make proper and implemented content and target goals in order to make the
best approachable target market challenging matter of fact for reducing pollutant chemical
resources for building (Hughes, Champion and Murdoch, 2015). Disregarding the environment
can lead to project failure. This study helps to enhance importance of green projects managing
factors in the construction industry. Construction projects or companies are generally depended
on climatic and geographical conditions. Study helps to define the importance of need for green
and safe environment. Impact of green culture on an environment is to maintain the healthy
environment in entire project procedure and the company should has adopted the main goals of
2
proper environment growth and ensuring less using pollutant sources.
1.2 Rationale
On the basis of past research and study, it has been seen that construction industry has
faced many challenges related to environment from past few years. Effective environment
sustainability is highly needed in present scenario in order to fulfill the long term goals. (He and
et.al., 2015). Present study has been focusing on project management that impacts on
organizational goals and targeted market plans. There is a huge need of green project managing
factors in the project management in order to ensure green management plan. Overall, it brings
extended term challenges that help to prefer long lasting efforts and growth. Green project is the
environmental challenge. Besides, it brings new challenges and growth in order to make the best
approachable target goals.
The purpose of the study is to define importance of green planning in order to sustain
long lasting efforts and goals. In order to take new steps and fast forwards results and growth.
Company should make proper and implemented content and target goals in order to make the
best approachable target market challenging matter of fact for reducing pollutant chemical
resources for building (Hughes, Champion and Murdoch, 2015). Disregarding the environment
can lead to project failure. This study helps to enhance importance of green projects managing
factors in the construction industry. Construction projects or companies are generally depended
on climatic and geographical conditions. Study helps to define the importance of need for green
and safe environment. Impact of green culture on an environment is to maintain the healthy
environment in entire project procedure and the company should has adopted the main goals of
2
the project managing factors is that to make green project without using any harmful factors.
This makes proper and effective learning methods that brings new services and growth.
Project succeed factors in the construction project is very necessary that helps to define
all employees or workers exact working in all over project period (Kaiser, El Arbi and
Ahlemann, 2015). Moreover, it takes the best approachable process that helps to bring new major
challenges. To understand the role of project planning in green projects, sustainable building
management should be investigated to find how the project manager can influence on linking
sustainability to the building process.
Research also determines challenges that are faced by the project manager to make a
proper solution (Mok, Shen and Yang, 2015). Study scope define the overall standing of green
task and value of project managing factors in order to ensure future sustainability growth. This
process also helps to take care of the environment surroundings and long lasting sustainability
3
This makes proper and effective learning methods that brings new services and growth.
Project succeed factors in the construction project is very necessary that helps to define
all employees or workers exact working in all over project period (Kaiser, El Arbi and
Ahlemann, 2015). Moreover, it takes the best approachable process that helps to bring new major
challenges. To understand the role of project planning in green projects, sustainable building
management should be investigated to find how the project manager can influence on linking
sustainability to the building process.
Research also determines challenges that are faced by the project manager to make a
proper solution (Mok, Shen and Yang, 2015). Study scope define the overall standing of green
task and value of project managing factors in order to ensure future sustainability growth. This
process also helps to take care of the environment surroundings and long lasting sustainability
3
growth. It will be more likely to have long ter effects and long lasting process. This helps to take
extended term process and more challenging growth. This helps to take long lasting and the best
effective challenging process. Different sources and more reliable and take effective process
making task.
This study has been provided the best sources able and makes the long term process
(Yang, Zou and Wang, 2016). It also gives good impact on the matter of fact that helps to make
the better fast growing performance. Present study has been introduced long term process and
takes the best approachable fast forward results. Project manager should make changes according
to protect from the bad effective low.
1.3 Aim
To access factors for managing green projects in construction industry of UK: Based on the
comparative study of ISG and Kier
1.4 Objectives
To identify role of different managing factors that affect green projects in construction
industry.
To ascertain the challenges that project managers encounter in managing green
construction project managing factors
To determine critical areas skills that can respond to those challenges.
To analyze importance of project planning for green project for maintaining sustainability
environment.
1.5 Method of analysis
Research Approaches: Research approach is the important term that helps to define
proper outcomes and results. There are two types of research approach such as inductive and
Inductive approach. Inductive approach does not based on formulation of hypothesis. They
focused on research aim and objectives (Guo and et.al., 2014). Besides, deductive approach is
based on hypothesis. Present study has been selected positivism approach which is based on
specific and general.
Research Strategies: it is the most crucial element of research methodologies that helps
to adopt suitable techniques. Present study has been determined the importance of project
planning in green projects in construction sector. For that, there has been present two types of
4
extended term process and more challenging growth. This helps to take long lasting and the best
effective challenging process. Different sources and more reliable and take effective process
making task.
This study has been provided the best sources able and makes the long term process
(Yang, Zou and Wang, 2016). It also gives good impact on the matter of fact that helps to make
the better fast growing performance. Present study has been introduced long term process and
takes the best approachable fast forward results. Project manager should make changes according
to protect from the bad effective low.
1.3 Aim
To access factors for managing green projects in construction industry of UK: Based on the
comparative study of ISG and Kier
1.4 Objectives
To identify role of different managing factors that affect green projects in construction
industry.
To ascertain the challenges that project managers encounter in managing green
construction project managing factors
To determine critical areas skills that can respond to those challenges.
To analyze importance of project planning for green project for maintaining sustainability
environment.
1.5 Method of analysis
Research Approaches: Research approach is the important term that helps to define
proper outcomes and results. There are two types of research approach such as inductive and
Inductive approach. Inductive approach does not based on formulation of hypothesis. They
focused on research aim and objectives (Guo and et.al., 2014). Besides, deductive approach is
based on hypothesis. Present study has been selected positivism approach which is based on
specific and general.
Research Strategies: it is the most crucial element of research methodologies that helps
to adopt suitable techniques. Present study has been determined the importance of project
planning in green projects in construction sector. For that, there has been present two types of
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
strategies quantitative and qualitative. With the help of qualitative strategy, researcher can easily
collect data through secondary data collection data. Examples, use of internet, books and
journals.
Research Design: it is another matter of growth and challenging growth. Research
design helps to define two types such as exploratory and conclusive (Harrison and Lock, 2017).
It makes proper and effective process making changes. Exploratory research is based on general
content rather on conclusive design that will be based on specific research tools. Present study is
based on conclusive research design.
Data collection: it is the crucial element of research methodology under which two types
of data collection techniques have been presented. They are primary and secondary. Present
research will select secondary data collection technique (Hughes, Champion and Murdoch,
2015). Through research collects data through books, internet, journals etc.
Ethical Consideration: it is the most concerning and required element for accomplishing
research goals and objectives. Under which, a researcher is required ethical consideration is the
more effective and productive element to control the uncontrollable factor goals which keeps the
process and more challenging and effective. Ethical consideration is the tool that helps to control
the risk factor from the projects in more effective manner.
5
collect data through secondary data collection data. Examples, use of internet, books and
journals.
Research Design: it is another matter of growth and challenging growth. Research
design helps to define two types such as exploratory and conclusive (Harrison and Lock, 2017).
It makes proper and effective process making changes. Exploratory research is based on general
content rather on conclusive design that will be based on specific research tools. Present study is
based on conclusive research design.
Data collection: it is the crucial element of research methodology under which two types
of data collection techniques have been presented. They are primary and secondary. Present
research will select secondary data collection technique (Hughes, Champion and Murdoch,
2015). Through research collects data through books, internet, journals etc.
Ethical Consideration: it is the most concerning and required element for accomplishing
research goals and objectives. Under which, a researcher is required ethical consideration is the
more effective and productive element to control the uncontrollable factor goals which keeps the
process and more challenging and effective. Ethical consideration is the tool that helps to control
the risk factor from the projects in more effective manner.
5
CHAPTER 2: LITERATURE REVIEW
2.1 Introduction
Construction industry is the most important and crucial because it makes new buildings
and evaluation processes in order to meet the needs of organization goals and objectives. It
contributes to the national economy in order to develop infrastructure that will be useful for
products and services. Overall, it makes better fast forward relationship growth in order to
enhance long effectiveness growth.
Besides, present study is based on the construction industry, which is majorly affected the
natural economy in terms of chemical resources and machines. In present scenario, builders need
to be sure that their factors of production must be green and enlarging. This also helps to make
better growth services. Present literature review will be analyzing different managing factors of
green projects in construction industry. This makes better and fast forward results growth. That
helps to take care of organizational goals and the best performing level. On the other hand, this
will also contribute the challenging. This makes the long term process and task oriented process
in order to meet needs.
2.2 Literature Review
Theme 1: To identify role of different managing factors that affect green projects in construction
industry
One of the most critical challenges to building green is the lack of industry skill of
construction sector to actually design and implement green projects. That helps to taking care of
the organization challenges. This makes proper changes and growth in order to meet needs of
building challenges. This makes proper processes or goals. According to Epstein, (2018)
capacity barriers is the first factor that affect the green projects. This makes proper and
approachable changes and target. Overall, company facing issues of lack of industry skills of
the construction sector that actually affect green projects and implementing green practices. On
the other side, industry also facing issues of technical experts that actually develop and
implement the green practices. As per the suggested Kerzner and Kerzner, (2017) they also
identify lack of knowledge about green practices in between the company structure due to which
green projects does not accomplish properly. The green building practices can be hindered by
ignorance or lack of common understanding about sustainability. That makes proper and
6
2.1 Introduction
Construction industry is the most important and crucial because it makes new buildings
and evaluation processes in order to meet the needs of organization goals and objectives. It
contributes to the national economy in order to develop infrastructure that will be useful for
products and services. Overall, it makes better fast forward relationship growth in order to
enhance long effectiveness growth.
Besides, present study is based on the construction industry, which is majorly affected the
natural economy in terms of chemical resources and machines. In present scenario, builders need
to be sure that their factors of production must be green and enlarging. This also helps to make
better growth services. Present literature review will be analyzing different managing factors of
green projects in construction industry. This makes better and fast forward results growth. That
helps to take care of organizational goals and the best performing level. On the other hand, this
will also contribute the challenging. This makes the long term process and task oriented process
in order to meet needs.
2.2 Literature Review
Theme 1: To identify role of different managing factors that affect green projects in construction
industry
One of the most critical challenges to building green is the lack of industry skill of
construction sector to actually design and implement green projects. That helps to taking care of
the organization challenges. This makes proper changes and growth in order to meet needs of
building challenges. This makes proper processes or goals. According to Epstein, (2018)
capacity barriers is the first factor that affect the green projects. This makes proper and
approachable changes and target. Overall, company facing issues of lack of industry skills of
the construction sector that actually affect green projects and implementing green practices. On
the other side, industry also facing issues of technical experts that actually develop and
implement the green practices. As per the suggested Kerzner and Kerzner, (2017) they also
identify lack of knowledge about green practices in between the company structure due to which
green projects does not accomplish properly. The green building practices can be hindered by
ignorance or lack of common understanding about sustainability. That makes proper and
6
effective process goals. This will take long term process and major objective goals. In spite of
others, ISG and Kier both needs to acquires the productive team building growth in order to
enhance better quality growth channel in order to sustain the best sustainable growth and
challenging market opportunities. Besides, this helps to bring long lasting growth for better
environmental growth and challenges. This makes proper changing entertainment goals objective
task. Overall, it brings new, better and long process of market opportunity. Sometimes,
stakeholders are not much aware about the growth of sustainability measures or alternatives that
fall within their remit.
Besides, company needs to apply green opportunities and great appearance to adopt the
green technology and materials requires new forms of competencies and knowledge. This will
help to control long effective challenges faced by company. This makes process and goals and
challenging material goals. In order to select managing challenges, this also makes proper
challenging and material growth challenges growth. Overall, it takes the long lasting effects in
order to meet needs of sustainability development growth.
As per Lehmann and Joseph, eds., (2015) it has been seen that this makes proper changes
and advanced level of making good things. Another challenge or lack of industry skills in this
area is that skill requirement change as per the green building design. This makes the proper
alteration and make good presence on behavior of natural growth.
As per the view of International Labor Organization, due to labor shortage and lack of
industry skills will lead the low sustainability growth channel. That makes process and goals in
order to meet the needs of organization goals and objectives. Due to cultural and social resistance
is another challenging factor that affects growth of green projects as per suggested Mok, Shen
and Yang, 2015.
Theme 2: To ascertain the challenges that project managers encounter in managing green
construction project managing factors.
According to Volk, Stengel and Schultmann, 2014, there are many challenges that affect
the project managers that encounters in managing green construction project. To maintaining the
green projects alive company, project manager requires the best approachable task performing
level to get productive outputs. Project manager has been seen many challenges during handling
the project goals. As per the Walker, (2015) Poorly defined goals is the first challenge that facing
by the project manager. This moderate low performing goals and major challenging market. On
7
others, ISG and Kier both needs to acquires the productive team building growth in order to
enhance better quality growth channel in order to sustain the best sustainable growth and
challenging market opportunities. Besides, this helps to bring long lasting growth for better
environmental growth and challenges. This makes proper changing entertainment goals objective
task. Overall, it brings new, better and long process of market opportunity. Sometimes,
stakeholders are not much aware about the growth of sustainability measures or alternatives that
fall within their remit.
Besides, company needs to apply green opportunities and great appearance to adopt the
green technology and materials requires new forms of competencies and knowledge. This will
help to control long effective challenges faced by company. This makes process and goals and
challenging material goals. In order to select managing challenges, this also makes proper
challenging and material growth challenges growth. Overall, it takes the long lasting effects in
order to meet needs of sustainability development growth.
As per Lehmann and Joseph, eds., (2015) it has been seen that this makes proper changes
and advanced level of making good things. Another challenge or lack of industry skills in this
area is that skill requirement change as per the green building design. This makes the proper
alteration and make good presence on behavior of natural growth.
As per the view of International Labor Organization, due to labor shortage and lack of
industry skills will lead the low sustainability growth channel. That makes process and goals in
order to meet the needs of organization goals and objectives. Due to cultural and social resistance
is another challenging factor that affects growth of green projects as per suggested Mok, Shen
and Yang, 2015.
Theme 2: To ascertain the challenges that project managers encounter in managing green
construction project managing factors.
According to Volk, Stengel and Schultmann, 2014, there are many challenges that affect
the project managers that encounters in managing green construction project. To maintaining the
green projects alive company, project manager requires the best approachable task performing
level to get productive outputs. Project manager has been seen many challenges during handling
the project goals. As per the Walker, (2015) Poorly defined goals is the first challenge that facing
by the project manager. This moderate low performing goals and major challenging market. On
7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
the other hand, it also generates long lasting effectiveness and majorly given long lasting
performance making task. Besides, On the other hand, in order to get over from the issue, project
manager affect needs to improve overall objectives and growth to meet needs of productive
project outcomes.
Theme 3: To Determine the critical areas skills that can respond to those challenges.
According to Carter, (2018) there are several methods to make better sustainability
growth in green projects. First instrument to solve all green projects challenges is institution and
attractive decision making approach. This requires coherent integration of policies across
economic, social and environmental spheres. It is the major goal effective challenging material
performance in order to meet effective challenging goals performing channel. ISG and Kier can
also adopt major finish objective solution mental object to make better effective content.
Effective developing building will be more helpful to create new challenging goals to analyze the
team building content. Green projects are more sustainable and well developed goals which helps
to make the proper and effective challenging goals that helps to keep the better storage process to
meet the changes and better performing goals in more effective manner suggested bu Glesne,
(2015).
Policy instrument will be the next factor to resolve issues and goals. It helps to bring
economic, social and environmental dimensions of sustainable development. This also helps to
keep goals effective and productive. This policy instrument will help to focus on the company’s
principle goals. Wide stakeholder support is very much required to maintained the proper
sustainability growth. This also helps to make productive nature of work accordingly and this
makes proper implementation of goals and planning suggested by the Epstein, (2018).
Construction planning is the most challenging task for civil engineers to execute
planning in more systematic time period. It keeps the major planning and making performing
goals. Green construction industry is earning a good image and in good order task oriented
process to be implemented indecently as per the Govindan, Rajendran, Sarkis and Murugesan,
(2015) suggested.
As per the research, Singapore Construction Industry is facing issues regarding growing
concern for climatic issues and sustainable construction that have put a great impact globally.
However, construction company also facing issues regarding proper project management
8
performance making task. Besides, On the other hand, in order to get over from the issue, project
manager affect needs to improve overall objectives and growth to meet needs of productive
project outcomes.
Theme 3: To Determine the critical areas skills that can respond to those challenges.
According to Carter, (2018) there are several methods to make better sustainability
growth in green projects. First instrument to solve all green projects challenges is institution and
attractive decision making approach. This requires coherent integration of policies across
economic, social and environmental spheres. It is the major goal effective challenging material
performance in order to meet effective challenging goals performing channel. ISG and Kier can
also adopt major finish objective solution mental object to make better effective content.
Effective developing building will be more helpful to create new challenging goals to analyze the
team building content. Green projects are more sustainable and well developed goals which helps
to make the proper and effective challenging goals that helps to keep the better storage process to
meet the changes and better performing goals in more effective manner suggested bu Glesne,
(2015).
Policy instrument will be the next factor to resolve issues and goals. It helps to bring
economic, social and environmental dimensions of sustainable development. This also helps to
keep goals effective and productive. This policy instrument will help to focus on the company’s
principle goals. Wide stakeholder support is very much required to maintained the proper
sustainability growth. This also helps to make productive nature of work accordingly and this
makes proper implementation of goals and planning suggested by the Epstein, (2018).
Construction planning is the most challenging task for civil engineers to execute
planning in more systematic time period. It keeps the major planning and making performing
goals. Green construction industry is earning a good image and in good order task oriented
process to be implemented indecently as per the Govindan, Rajendran, Sarkis and Murugesan,
(2015) suggested.
As per the research, Singapore Construction Industry is facing issues regarding growing
concern for climatic issues and sustainable construction that have put a great impact globally.
However, construction company also facing issues regarding proper project management
8
framework for such green projects. From the basis of further assessment, it also has been
declared that cost is another potential barrier for green projects in order to adopt its technologies.
On the basis of current scenario, nowadays construction company are majorly take the
steps forward towards the green projects towards the better performing goals. in proper and
systematic manner as per the Klimova and et.al., (2016) suggested. The main purpose behind
green project is to reduce harmful substances on environment and human life and sustainable
development can be promoted. As per different challenges that has been faced by the green
project companies such as integration issues, lack of infrastructure, Non-technological issues,
education of employees, resistance to change, initial capital cost etc. in order to manage all issues
and challenges that ISG and Kier need to adopt for effective project management planning to
make sure proper process of execution and productive outcomes.
Theme 4: To analyse the importance of project planning for green project for maintaining
sustainability environment
According to Lewis, (2015), environmental sustainability planning is becoming the most
significant growth during last few years. Now, people become more aware about the importance
or need of green projects. This also become the more challenging and environmental performing
goal. Besides, other factors, which help to keep green building continue to exist such as energy
prices, interested costs of building material and regulatory incentives.
The main purpose is to suggest specific modifications to conventional building practices
to maximize the delivery cost efficient green building projects suggested by Mackey and Gass,
(2015). Through achieving and adopting different goals and better performing task. It helps to
make water quality protection through reducing the nitrate leaching from the soil into the water
supply and reduces surface runoff, keeping phosphorus and other harmful aside.
Another advantage of green construction is that to operate goals in such productive
manner. It also helps to control better goal objectives. It also helps to bring major goals and
objectives for better task performing goals. Green project planning is also very helpful to discuss
about reduced soil erosion that helps to control the better task operating performing that helps to
keep environment safe and secure. According to Maes and et.al., (2015), reduced soil erosion is
another advantage of green projects, which helps to keep sediments out of lakes, streams, storm
9
declared that cost is another potential barrier for green projects in order to adopt its technologies.
On the basis of current scenario, nowadays construction company are majorly take the
steps forward towards the green projects towards the better performing goals. in proper and
systematic manner as per the Klimova and et.al., (2016) suggested. The main purpose behind
green project is to reduce harmful substances on environment and human life and sustainable
development can be promoted. As per different challenges that has been faced by the green
project companies such as integration issues, lack of infrastructure, Non-technological issues,
education of employees, resistance to change, initial capital cost etc. in order to manage all issues
and challenges that ISG and Kier need to adopt for effective project management planning to
make sure proper process of execution and productive outcomes.
Theme 4: To analyse the importance of project planning for green project for maintaining
sustainability environment
According to Lewis, (2015), environmental sustainability planning is becoming the most
significant growth during last few years. Now, people become more aware about the importance
or need of green projects. This also become the more challenging and environmental performing
goal. Besides, other factors, which help to keep green building continue to exist such as energy
prices, interested costs of building material and regulatory incentives.
The main purpose is to suggest specific modifications to conventional building practices
to maximize the delivery cost efficient green building projects suggested by Mackey and Gass,
(2015). Through achieving and adopting different goals and better performing task. It helps to
make water quality protection through reducing the nitrate leaching from the soil into the water
supply and reduces surface runoff, keeping phosphorus and other harmful aside.
Another advantage of green construction is that to operate goals in such productive
manner. It also helps to control better goal objectives. It also helps to bring major goals and
objectives for better task performing goals. Green project planning is also very helpful to discuss
about reduced soil erosion that helps to control the better task operating performing that helps to
keep environment safe and secure. According to Maes and et.al., (2015), reduced soil erosion is
another advantage of green projects, which helps to keep sediments out of lakes, streams, storm
9
drains and roads or also reducing the flooding, mudslides and dust storms better fast growing.
Overall, it requires the best performing goals and targeted performances.
According to Marcelino-Sádaba, González-Jaen and Pérez-Ezcurdia, (2015), they
argument that green architecture may be a dream come true for most ecologists and
environmentalists but it also presents some issues' in the industry sector. It requires huge
investment and resources to fulfill desired result outcomes. The main purpose of the green
objectives is that to control the negative effects on the nature which brings the better services and
growth which helps to control the better objective purpose. Apart from that, it also helps to keep
the environment positive and goals in order to select the better task performing better goals.
Besides, immense deforestation is another issue of ecosystem, which leads to raise many
issues in the system, which increased the risk of endangering biodiversity. Which brings the
major goal oriented performing game challenge. This entrepreneurship goals will make things
better challenging for green project constructions. This must also help to control better
performing goals suggested by Martens and Carvalho, (2017).
Green projects are more profitable and needy project development growth which require
high performing goals. On the other hand, green projects planning is the more challenging and
required task in today's time to maintained the proper structure of managing task. It helps to
reduce the pollution and enhancing the better positive surrounding goals.
Overall, the main purpose of the green projects are to manage the high temperature and
long term goals to protect the high pollution in the world.
10
Overall, it requires the best performing goals and targeted performances.
According to Marcelino-Sádaba, González-Jaen and Pérez-Ezcurdia, (2015), they
argument that green architecture may be a dream come true for most ecologists and
environmentalists but it also presents some issues' in the industry sector. It requires huge
investment and resources to fulfill desired result outcomes. The main purpose of the green
objectives is that to control the negative effects on the nature which brings the better services and
growth which helps to control the better objective purpose. Apart from that, it also helps to keep
the environment positive and goals in order to select the better task performing better goals.
Besides, immense deforestation is another issue of ecosystem, which leads to raise many
issues in the system, which increased the risk of endangering biodiversity. Which brings the
major goal oriented performing game challenge. This entrepreneurship goals will make things
better challenging for green project constructions. This must also help to control better
performing goals suggested by Martens and Carvalho, (2017).
Green projects are more profitable and needy project development growth which require
high performing goals. On the other hand, green projects planning is the more challenging and
required task in today's time to maintained the proper structure of managing task. It helps to
reduce the pollution and enhancing the better positive surrounding goals.
Overall, the main purpose of the green projects are to manage the high temperature and
long term goals to protect the high pollution in the world.
10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
CHAPTER 3: RESEARCH METHODOLOGY
3.1 Introduction
Research methodology is the systematic theory of analysis the whole research. These are
the sort of methods which applying on the research to collect the more information regarding the
research topic (Maes and et.al., 2015). It encompasses the concepts into deeper form to more
elaborate the term or the concepts of performance. It is not to set out the results nor to solutions
of the research. Present study will be explained the different terms of methodology will helpful
to look deeper in the present study with new different tools and techniques.
3.2 Research philosophies
Research philosophy is a study or method of research methodology which is based on
beliefs about the way in which data about collects and analyzed in proper systematic manner.
Researcher being used this philosophy to identify the data into deeper manner. Further, research
philosophy has separated into two part Positivism and interpretation (Glesne, 2015). Positivism
is being helpful for the researcher to analyze the data which is based on reality and described
from an objective viewpoint. That is without interfering or studied with the phenomena exact.
On the other hand, Interpretivism is the another tool which relates to the subjective
growth which is highly based on reality purpose. Present study being used by positivism
philosophy that helps to observed and explained realities and their interrelationship goals with
each others (Maes and et.al., 2015).
3.3 Research approach
It is the another significant element of research methodology which helps to show
effective results and performance to make sure the effective goals. Along with that, it also helps
to generate the major objective results and makes the proper challenging result outcomes. Which
also helps to control the challenging and majorly given goals to conduct study in more effective
way (Sorvig and Thompson, 2018.). There are two types of research approach inductive and
deductive approach. Inductive approach has been based on reasoning or observation of proposed
studies towards the end of the research goals and objective. This will also help to control the
process goals effectively.
On the other hand, deductive approach is the another method of research approach which
is related or based on developing a hypothesis based on existing theory. It also sets the better
growing performance and goals (Martens and Carvalho, 2017). Present study has being taken
11
3.1 Introduction
Research methodology is the systematic theory of analysis the whole research. These are
the sort of methods which applying on the research to collect the more information regarding the
research topic (Maes and et.al., 2015). It encompasses the concepts into deeper form to more
elaborate the term or the concepts of performance. It is not to set out the results nor to solutions
of the research. Present study will be explained the different terms of methodology will helpful
to look deeper in the present study with new different tools and techniques.
3.2 Research philosophies
Research philosophy is a study or method of research methodology which is based on
beliefs about the way in which data about collects and analyzed in proper systematic manner.
Researcher being used this philosophy to identify the data into deeper manner. Further, research
philosophy has separated into two part Positivism and interpretation (Glesne, 2015). Positivism
is being helpful for the researcher to analyze the data which is based on reality and described
from an objective viewpoint. That is without interfering or studied with the phenomena exact.
On the other hand, Interpretivism is the another tool which relates to the subjective
growth which is highly based on reality purpose. Present study being used by positivism
philosophy that helps to observed and explained realities and their interrelationship goals with
each others (Maes and et.al., 2015).
3.3 Research approach
It is the another significant element of research methodology which helps to show
effective results and performance to make sure the effective goals. Along with that, it also helps
to generate the major objective results and makes the proper challenging result outcomes. Which
also helps to control the challenging and majorly given goals to conduct study in more effective
way (Sorvig and Thompson, 2018.). There are two types of research approach inductive and
deductive approach. Inductive approach has been based on reasoning or observation of proposed
studies towards the end of the research goals and objective. This will also help to control the
process goals effectively.
On the other hand, deductive approach is the another method of research approach which
is related or based on developing a hypothesis based on existing theory. It also sets the better
growing performance and goals (Martens and Carvalho, 2017). Present study has being taken
11
inductive approach to get deep observation of study goals. It gives the long term goal and makes
the proper advancing goal making performance.
3.4 Research Design
Research design is the another significant element of the research methodology. This is
the method or procedure used in collecting and analyzing measures of the variable specified in
the research problem. It is the systematic approach that helps to conduct study in more effective
manner (Martens and Carvalho, 2017). This makes the proper and effective channel growth.
Which makes the proper and challenging item goals. This makes the proper arrangement goals
which controls the better objective goals. Exploratory design is stated for conduct a research
problem that has not been studied more clearly intended to establish priorities develop
operational definitions and improve final research design. Which also helps to make the proper
result outcome growth. Overall, it gives the better task performing goals and major goal
objective level (Mackey and Gass, 2015). On the other side, apart from that it keeps the all major
goals effective and implemented in proper research manner.
Present study has being conducted on the basis of descriptive research design that helps
to determine the best suitable results. This helps to enable the significant information for
providing opportunity that prepare questionnaire (Glesne, 2015).
3.5 Research strategy
It is considered the most significant role to conduct any research with the help of suitable
techniques and tools. Present study has found the importance of green projects in planning
growth in construction sector. For that, researcher has taken research strategy from two
quantitative and qualitative. With the help of qualitative research strategy, researcher can easily
collect the data through better playing goals. Along with that, it also helps to keep the goals in
more performing manner (Sorvig and Thompson, 2018.). There are two types of research
strategy are presents quantitative and qualitative strategies. Quantitative method this also must
try to keep the all goals systematic in term of growing the performance goals. Present study has
been concluded according to research requirement. In terms of quantitative research strategy
involves the study of research data and goals. Quantitative research goals will be more helpful to
get the statistic data to present the study in deeper scene. This also makes the proper challenging
and effective level of challenging goals (Mackey and Gass, 2015).
12
the proper advancing goal making performance.
3.4 Research Design
Research design is the another significant element of the research methodology. This is
the method or procedure used in collecting and analyzing measures of the variable specified in
the research problem. It is the systematic approach that helps to conduct study in more effective
manner (Martens and Carvalho, 2017). This makes the proper and effective channel growth.
Which makes the proper and challenging item goals. This makes the proper arrangement goals
which controls the better objective goals. Exploratory design is stated for conduct a research
problem that has not been studied more clearly intended to establish priorities develop
operational definitions and improve final research design. Which also helps to make the proper
result outcome growth. Overall, it gives the better task performing goals and major goal
objective level (Mackey and Gass, 2015). On the other side, apart from that it keeps the all major
goals effective and implemented in proper research manner.
Present study has being conducted on the basis of descriptive research design that helps
to determine the best suitable results. This helps to enable the significant information for
providing opportunity that prepare questionnaire (Glesne, 2015).
3.5 Research strategy
It is considered the most significant role to conduct any research with the help of suitable
techniques and tools. Present study has found the importance of green projects in planning
growth in construction sector. For that, researcher has taken research strategy from two
quantitative and qualitative. With the help of qualitative research strategy, researcher can easily
collect the data through better playing goals. Along with that, it also helps to keep the goals in
more performing manner (Sorvig and Thompson, 2018.). There are two types of research
strategy are presents quantitative and qualitative strategies. Quantitative method this also must
try to keep the all goals systematic in term of growing the performance goals. Present study has
been concluded according to research requirement. In terms of quantitative research strategy
involves the study of research data and goals. Quantitative research goals will be more helpful to
get the statistic data to present the study in deeper scene. This also makes the proper challenging
and effective level of challenging goals (Mackey and Gass, 2015).
12
Present study being based on qualitative research strategy to stated better following
research tools and technique. Qualitative technique helps to collect the data through primary tool
which researcher taken from internet books and journals (Govindan, Rajendran, Sarkis and
Murugesan, 2015).
3.6 Data collection methods
Data collection is the mandatory process to be conducted by the research by all relevant
tool and techniques. Such as magazines, newspaper, journals, online portals etc. data collection
have been divided into two types primary or secondary data collection. Secondary data collection
method has collected data which is already existed in published books, newspaper, magazines,
journal, online portals etc (Klimova and et.al., 2016). There are many opportunities for
researcher to collects many data from those resources. Secondary data technique plays a
significant role in term of increasing the levels of research validity and reliability. On the other
hand, primary data collection is the another major goals and challenging behavioral matter of
fact. Primary data collection is the another technique or tool to collect the research data.
Furthermore, primary data has been further divided into quantitative and qualitative. Quantitative
data collection are based on mathematical calculations in various formats. This also helps to keep
the challenging performing goals by collecting different goals and objectives. Primary data is
the most crucial method to take new study of new topic on the basis of new collection methods
(Lewis, 2015). Present study has adopted secondary research for completing the proper target
goals.
Data collection technique is the most significant method or technique process which is
completed according to goal of the research topic. Moreover, this also helps to bring the new
major changes. Present study being taken research with the help of both method primary and
secondary data collection method. Primary data collection has been conduct on the basis of
questionnaire survey (Martens and Carvalho, 2017Martens and Carvalho, 2017). On the contrary
secondary method has been conduct with literature review. Which also helps to conduct better
goals and performance output.
3.7 Sampling
Sampling is the another significant methodology while conducting a research this helps to
control the long lasting performing goals in order to select the best tool of sampling method.
13
research tools and technique. Qualitative technique helps to collect the data through primary tool
which researcher taken from internet books and journals (Govindan, Rajendran, Sarkis and
Murugesan, 2015).
3.6 Data collection methods
Data collection is the mandatory process to be conducted by the research by all relevant
tool and techniques. Such as magazines, newspaper, journals, online portals etc. data collection
have been divided into two types primary or secondary data collection. Secondary data collection
method has collected data which is already existed in published books, newspaper, magazines,
journal, online portals etc (Klimova and et.al., 2016). There are many opportunities for
researcher to collects many data from those resources. Secondary data technique plays a
significant role in term of increasing the levels of research validity and reliability. On the other
hand, primary data collection is the another major goals and challenging behavioral matter of
fact. Primary data collection is the another technique or tool to collect the research data.
Furthermore, primary data has been further divided into quantitative and qualitative. Quantitative
data collection are based on mathematical calculations in various formats. This also helps to keep
the challenging performing goals by collecting different goals and objectives. Primary data is
the most crucial method to take new study of new topic on the basis of new collection methods
(Lewis, 2015). Present study has adopted secondary research for completing the proper target
goals.
Data collection technique is the most significant method or technique process which is
completed according to goal of the research topic. Moreover, this also helps to bring the new
major changes. Present study being taken research with the help of both method primary and
secondary data collection method. Primary data collection has been conduct on the basis of
questionnaire survey (Martens and Carvalho, 2017Martens and Carvalho, 2017). On the contrary
secondary method has been conduct with literature review. Which also helps to conduct better
goals and performance output.
3.7 Sampling
Sampling is the another significant methodology while conducting a research this helps to
control the long lasting performing goals in order to select the best tool of sampling method.
13
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Sampling can be defined as a specific principle used to select the research sample for the study.
Sample taken for the study because many populations of interest are too large to work with
directly, technique of statistical sampling method (Thorne and et.al., 2018). Sampling is the tool
on the basis of data analysis has been done accordingly. It makes the proper changes and goals
and better process oriented. Sampling helps to target the population which is based on the study.
Sampling is more benefited to make the research of any type, it helps to save the costs of the
research and more accurate research findings. This also helps to inform the more efficient way to
keep the method more challenging and effective (Maes and et.al., 2015). There are two types of
sampling method probability and non-probability sampling. Probability sampling is in which
every member of population would get chance to participate in study. There are different tools
includes in probability sampling such as simple, stratified, systematic, multistage and cluster and
sampling methods (Klimova and et.al., 2016). This helps to make the proper and challenging
goal. On the other hand non probability sampling are group of sampling which is random
manner. Therefore, non probabilistic method is the another Major challenging and performing
goals. This takes the proper and challenging goal performance that helps to keep the effective
and challenging materiel goals. Moreover, this challenge will have been taken on the basis of
effective goals (Mackey and Gass, 2015).
3.8 Data analysis
Data analysis is the another is the most significant part of the study which keeps the
better performing level (Lewis, 2015). It includes discussion about the methods of data analysis
on the basis of collected data. This helps to explain how and through which manner data going to
analyze in which manner. There are difference between qualitative data analysis and quantitative
data analysis. In qualitative research researcher would focus on some methods such as
interviews, focus group, experiments etc. this helps to focus on the response according to proper
systematic manner. In qualitative method it has been take study into critical manner in order to
accomplish the research objective fulfill. Along with that, it keeps the proper goal and
challenging behavior (Glesne, 2015). Moreover, it brings the nature of challenging and material
goal. Along with that, it keeps the process effective and challenging for finding the result goals,
Which also helps to keep the final objective. It also helps to control proper goals and
challenging makes decision making goals.
14
Sample taken for the study because many populations of interest are too large to work with
directly, technique of statistical sampling method (Thorne and et.al., 2018). Sampling is the tool
on the basis of data analysis has been done accordingly. It makes the proper changes and goals
and better process oriented. Sampling helps to target the population which is based on the study.
Sampling is more benefited to make the research of any type, it helps to save the costs of the
research and more accurate research findings. This also helps to inform the more efficient way to
keep the method more challenging and effective (Maes and et.al., 2015). There are two types of
sampling method probability and non-probability sampling. Probability sampling is in which
every member of population would get chance to participate in study. There are different tools
includes in probability sampling such as simple, stratified, systematic, multistage and cluster and
sampling methods (Klimova and et.al., 2016). This helps to make the proper and challenging
goal. On the other hand non probability sampling are group of sampling which is random
manner. Therefore, non probabilistic method is the another Major challenging and performing
goals. This takes the proper and challenging goal performance that helps to keep the effective
and challenging materiel goals. Moreover, this challenge will have been taken on the basis of
effective goals (Mackey and Gass, 2015).
3.8 Data analysis
Data analysis is the another is the most significant part of the study which keeps the
better performing level (Lewis, 2015). It includes discussion about the methods of data analysis
on the basis of collected data. This helps to explain how and through which manner data going to
analyze in which manner. There are difference between qualitative data analysis and quantitative
data analysis. In qualitative research researcher would focus on some methods such as
interviews, focus group, experiments etc. this helps to focus on the response according to proper
systematic manner. In qualitative method it has been take study into critical manner in order to
accomplish the research objective fulfill. Along with that, it keeps the proper goal and
challenging behavior (Glesne, 2015). Moreover, it brings the nature of challenging and material
goal. Along with that, it keeps the process effective and challenging for finding the result goals,
Which also helps to keep the final objective. It also helps to control proper goals and
challenging makes decision making goals.
14
3.9 Ethical collection
Ethical consideration is the most essential element of the research. It makes the failure of
the study into more proper manner (Mackey and Gass, 2015). Dissertation is the most
challenging and makes the proper and better target market opportunity and makes the effective
target goals. To make research more attractive and productive it requires long term goals.
Without involvement of ethical consideration researcher cannot make the unethical activities. On
the apart from this, researcher also helps to dignity of research participants should be prioritized
accordingly. Full consent prior to take the objective goals and should affect the effective
changes. Ethical consideration is the challenging and materialistic goal which converts into
better performing level (Martens and Carvalho, 2017Martens and Carvalho, 2017). Ethical
consideration will also need to require better protection level in order to accomplish the best
potential goals. Overall, privacy of research participation will also need to require taking the
better result and technique through all task should be implemented in proper manner. Overall, it
goals and managing task making performance level. Ethical consideration would more helpful to
protect the channels into more effective manner. More over, it also helps to control the long term
goals and makes ethical consideration goal making charges (Taylor, Bogdan and DeVault,
2015). Better ethical consideration would more helpful to communicate better relation to the
research should be done with honesty and goals. Any misleading information goals characterized
better following goals. Moreover, it keeps the better following goals, Which leading major fast
forward results and fast forward result goals.
3.10 Research limitation
Research limitation is the another major or effective limitation process is it normal and
goal effective tool to make output results more challenging. It is the critical important for you to
striving to minimize the range of scope of limitation throughout the research process. Also, it
requires protecting the minimizing goals. Ethical limitations are helps to acknowledge
shortcoming the work (Sorvig and Thompson, 2018.). All over this also affect the overall
findings and goals accordingly. It makes the process goals more effective and challenging
according to all matter of growth challenging performing task. Research limitations researcher
would never controllable and challenging. Qualitative research findings would affect the
business growth and affect the findings cannot generalized cannot to the larger population. This
15
Ethical consideration is the most essential element of the research. It makes the failure of
the study into more proper manner (Mackey and Gass, 2015). Dissertation is the most
challenging and makes the proper and better target market opportunity and makes the effective
target goals. To make research more attractive and productive it requires long term goals.
Without involvement of ethical consideration researcher cannot make the unethical activities. On
the apart from this, researcher also helps to dignity of research participants should be prioritized
accordingly. Full consent prior to take the objective goals and should affect the effective
changes. Ethical consideration is the challenging and materialistic goal which converts into
better performing level (Martens and Carvalho, 2017Martens and Carvalho, 2017). Ethical
consideration will also need to require better protection level in order to accomplish the best
potential goals. Overall, privacy of research participation will also need to require taking the
better result and technique through all task should be implemented in proper manner. Overall, it
goals and managing task making performance level. Ethical consideration would more helpful to
protect the channels into more effective manner. More over, it also helps to control the long term
goals and makes ethical consideration goal making charges (Taylor, Bogdan and DeVault,
2015). Better ethical consideration would more helpful to communicate better relation to the
research should be done with honesty and goals. Any misleading information goals characterized
better following goals. Moreover, it keeps the better following goals, Which leading major fast
forward results and fast forward result goals.
3.10 Research limitation
Research limitation is the another major or effective limitation process is it normal and
goal effective tool to make output results more challenging. It is the critical important for you to
striving to minimize the range of scope of limitation throughout the research process. Also, it
requires protecting the minimizing goals. Ethical limitations are helps to acknowledge
shortcoming the work (Sorvig and Thompson, 2018.). All over this also affect the overall
findings and goals accordingly. It makes the process goals more effective and challenging
according to all matter of growth challenging performing task. Research limitations researcher
would never controllable and challenging. Qualitative research findings would affect the
business growth and affect the findings cannot generalized cannot to the larger population. This
15
is especially true when the definition better objective growth. Limit the better task performance
goals and helps to control the better performing goals (Klimova and et.al., 2016).
On the basis of controllable process and major task performing goals. Better performing
and better and logical controlling better performance. Along with that, it make the good process
and better target opportunity.
16
goals and helps to control the better performing goals (Klimova and et.al., 2016).
On the basis of controllable process and major task performing goals. Better performing
and better and logical controlling better performance. Along with that, it make the good process
and better target opportunity.
16
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
CHAPTER 4: DATA ANALYSIS
4.1 Introduction
This chapter of data analysis determination which is the most effective and challenging
sources that creates the long lasting effects on the research goals. It helps to gathered primary
data from different sources in order to present the most challenging behavior and goal
performing matter. It is the process oriented goals and ideas to select the best approachable
matter of influencing the best thing (Rostami and et.al., 2015). Data analysis process is helpful to
discovering the useful information and goals to make better source full information. There are
two types of method the helps to collect data into more prominent way quantitative and
qualitative. That help to discover long lasting matter of performing goals. It also includes of
graph, tables and charts in the overall research process.
4.2 Thematic analysis
Thematic analysis is one of the common term or process of analysis in qualitative
research. It emphasizes pinpointing, examining and recording the respondent and more
challenging and best effective manner (Wong and Zhou, 2015). This also helps to take the study
into more prominent manner. Thematic analysis also helps to identify research outcomes on the
behalf of collective respondent. Thematic analysis also based on different philosophical
conceptual assumptions and are divergent in term of procedure. Study will be going to conduct
secondary research with the help of employees.
Theme 1: Explaining the thoughts of company on sustainability
Interpretation: On the basis of sources or company records most of the data or
information thoughts towards sustainability development through green projects building are
positive as well as negative also. As per the results output, such as that, people are enthusiastic
and happy with this growth of both company in terms of green bhuilding projects. In Kier,
accordance also enthusiastic for the sustainability growth (Ashworth and Perera, 2015). On the
other hand, As per the sources of company data they against the growth of sustainability due to
required natural resources in higher quantity. Apart from that, it also helps to control the major
objective goals in order to compare the long lasting effects. As per the research goals and
objective performing goals, it has been seen that. It gives better responsive current goals.
17
4.1 Introduction
This chapter of data analysis determination which is the most effective and challenging
sources that creates the long lasting effects on the research goals. It helps to gathered primary
data from different sources in order to present the most challenging behavior and goal
performing matter. It is the process oriented goals and ideas to select the best approachable
matter of influencing the best thing (Rostami and et.al., 2015). Data analysis process is helpful to
discovering the useful information and goals to make better source full information. There are
two types of method the helps to collect data into more prominent way quantitative and
qualitative. That help to discover long lasting matter of performing goals. It also includes of
graph, tables and charts in the overall research process.
4.2 Thematic analysis
Thematic analysis is one of the common term or process of analysis in qualitative
research. It emphasizes pinpointing, examining and recording the respondent and more
challenging and best effective manner (Wong and Zhou, 2015). This also helps to take the study
into more prominent manner. Thematic analysis also helps to identify research outcomes on the
behalf of collective respondent. Thematic analysis also based on different philosophical
conceptual assumptions and are divergent in term of procedure. Study will be going to conduct
secondary research with the help of employees.
Theme 1: Explaining the thoughts of company on sustainability
Interpretation: On the basis of sources or company records most of the data or
information thoughts towards sustainability development through green projects building are
positive as well as negative also. As per the results output, such as that, people are enthusiastic
and happy with this growth of both company in terms of green bhuilding projects. In Kier,
accordance also enthusiastic for the sustainability growth (Ashworth and Perera, 2015). On the
other hand, As per the sources of company data they against the growth of sustainability due to
required natural resources in higher quantity. Apart from that, it also helps to control the major
objective goals in order to compare the long lasting effects. As per the research goals and
objective performing goals, it has been seen that. It gives better responsive current goals.
17
Moreover, it also helps to undertaken the goals and best productive goals. This also helps to
bring the major goals and objective and leading goals (Hwang, Zhao and Tan, 2015). Moreover,
it also helps to control the leading target market objective. This also helps to bring the major
objective and performing goals. Apart from that, as per the another some respondent of ISG they
are partially taken this question and not sure with great concern.
As per the other thoughts and sources, some data reflect the negativeity towards the green
projects due to lack of proper communication process, lack of cost effective and improper
professionals in the field. This information reduce the growth of proper sustainability
development in construction industry.
Theme 2: How Much company committed with Green projects
Interpretation: On the basis of this secondary resercah or on the basis of organisation
results and goals, that is company committed with green projects or not. As per the collected
information of ISG it is highly goes into positive manner. Or on the contrary In terms of Kier, it
reflescts lower response. According to sources, companies are more engaged with green projects.
Apart from that, it also helps to enhance current green projects and better objective performance
goals. Moreover, this includes the better advancing goals and objective performing goals. As per
the responsive of both company would give medium interest. According to some data and goals.
As per the sources of company data ISG and Kier respectively suggested that company is less
committed towards the green building projects (Darko and Chan, 2016). It also helps to make the
better advancing and leading goals that affect the business opportunity and goals. Moreover, this
helps to collect the high work pressure and challenging material purposes.
On other hand Company must needs to adopt or take green building projects that helps to
promote the green concept which reflects to the better sustainability growth. On the contrary, this
would also impact on the company position in long term channel.
Theme 3: Company would get benefited from planning in green projects
Interpretation: On the basis of this interpretation process, as per the sources of company
that weather green building projects are benefited for the company or not. it is long lasting and
effective or not. Apart from that, it would be more influencing and challenging task to be
performed by the company. This more enlarging and qualifying the results as per the growth and
effective channel. Company would get benefited from planning in green projects in which area.
As per the As per the sources of company data of ISG and Kier respectively suggested that
18
bring the major goals and objective and leading goals (Hwang, Zhao and Tan, 2015). Moreover,
it also helps to control the leading target market objective. This also helps to bring the major
objective and performing goals. Apart from that, as per the another some respondent of ISG they
are partially taken this question and not sure with great concern.
As per the other thoughts and sources, some data reflect the negativeity towards the green
projects due to lack of proper communication process, lack of cost effective and improper
professionals in the field. This information reduce the growth of proper sustainability
development in construction industry.
Theme 2: How Much company committed with Green projects
Interpretation: On the basis of this secondary resercah or on the basis of organisation
results and goals, that is company committed with green projects or not. As per the collected
information of ISG it is highly goes into positive manner. Or on the contrary In terms of Kier, it
reflescts lower response. According to sources, companies are more engaged with green projects.
Apart from that, it also helps to enhance current green projects and better objective performance
goals. Moreover, this includes the better advancing goals and objective performing goals. As per
the responsive of both company would give medium interest. According to some data and goals.
As per the sources of company data ISG and Kier respectively suggested that company is less
committed towards the green building projects (Darko and Chan, 2016). It also helps to make the
better advancing and leading goals that affect the business opportunity and goals. Moreover, this
helps to collect the high work pressure and challenging material purposes.
On other hand Company must needs to adopt or take green building projects that helps to
promote the green concept which reflects to the better sustainability growth. On the contrary, this
would also impact on the company position in long term channel.
Theme 3: Company would get benefited from planning in green projects
Interpretation: On the basis of this interpretation process, as per the sources of company
that weather green building projects are benefited for the company or not. it is long lasting and
effective or not. Apart from that, it would be more influencing and challenging task to be
performed by the company. This more enlarging and qualifying the results as per the growth and
effective channel. Company would get benefited from planning in green projects in which area.
As per the As per the sources of company data of ISG and Kier respectively suggested that
18
company benefited to get customer higher satisfactions. Besides, as per the respondent of ISG
and Kier respondent suggested that company would be getting higher brand value in terms of
market research (Sorvig and Thompson, 2018). On the other hand, as per the another few As per
the sources of company data, green projects are most benefited source of making good customer
image in the market. This also helps to saving the other harmfull resources as well. In order to
fullfill the According to sources green planning projects alos required for future sustainability in
nature. It gives many benefits such as economic, brand recognistion, employees satisfaction,
Apart from that, as per the sources of secondary research. Both ISG and Kier respectively. That
employee retention is the another benefit that company could adopt with the help of green
building projects in terms of building new profesional benefits.
On the contrary, sources also introduced some critical reviews as well. Such it has been
observed that alternative fuel sources might be expensive for the company. For example going
paperless means everything is savedis saved on the computers. If they damaged or stolen all cost
would be bear by the company. It shows the negative examples on using alternate solutions in
construction industry.
Theme 4: Green projects concept is difficult in upcoming projects or not
Interpretation: On the basis of this interpretation process and goals it has been suggested
that, according to all sources of ISG and Kier collectively. They suggested that, as per the green
project concept it is difficult in upcoming projects or not. As per the As per the sources of
company data of ISG and Kier respectively. That suggested yes that yes it is difficult to adopt
the planning of green project building because it requires high resources and material as well. On
the other hand, according to other As per the sources of company data of ISG and Kier they
suggested that it requires the long term goals and best approachable target in terms of making
good presence (Luthra and eta.l., 2014).
On the other hand, sustainability is the backbone of business . This misght be create some
negative scenrio for the company or nture. Green projects are might be difficult for in future that
impact on natural resources.
Theme 5: Reasons which makes green concept difficult and hard for the organizations
Interpretation: On the basis of this interpretation process and objective it has been seen
that, as per the company collected information, company that reasons which makes green
concept difficult and hard. As per the As per the sources of company data of ISG and Kier they
19
and Kier respondent suggested that company would be getting higher brand value in terms of
market research (Sorvig and Thompson, 2018). On the other hand, as per the another few As per
the sources of company data, green projects are most benefited source of making good customer
image in the market. This also helps to saving the other harmfull resources as well. In order to
fullfill the According to sources green planning projects alos required for future sustainability in
nature. It gives many benefits such as economic, brand recognistion, employees satisfaction,
Apart from that, as per the sources of secondary research. Both ISG and Kier respectively. That
employee retention is the another benefit that company could adopt with the help of green
building projects in terms of building new profesional benefits.
On the contrary, sources also introduced some critical reviews as well. Such it has been
observed that alternative fuel sources might be expensive for the company. For example going
paperless means everything is savedis saved on the computers. If they damaged or stolen all cost
would be bear by the company. It shows the negative examples on using alternate solutions in
construction industry.
Theme 4: Green projects concept is difficult in upcoming projects or not
Interpretation: On the basis of this interpretation process and goals it has been suggested
that, according to all sources of ISG and Kier collectively. They suggested that, as per the green
project concept it is difficult in upcoming projects or not. As per the As per the sources of
company data of ISG and Kier respectively. That suggested yes that yes it is difficult to adopt
the planning of green project building because it requires high resources and material as well. On
the other hand, according to other As per the sources of company data of ISG and Kier they
suggested that it requires the long term goals and best approachable target in terms of making
good presence (Luthra and eta.l., 2014).
On the other hand, sustainability is the backbone of business . This misght be create some
negative scenrio for the company or nture. Green projects are might be difficult for in future that
impact on natural resources.
Theme 5: Reasons which makes green concept difficult and hard for the organizations
Interpretation: On the basis of this interpretation process and objective it has been seen
that, as per the company collected information, company that reasons which makes green
concept difficult and hard. As per the As per the sources of company data of ISG and Kier they
19
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
suggested that lack of technical knowledge is the most and big conflict in green project task that
would facing by the company. On the other hand as per the respondent of ISG and Kier
suggested that initial cost investment is the conflicted and majorly issues faced by the company
to handling the green projects (Hughes, Champion and Murdoch, 2015). On the other hand
according to some of the other information suggested that of the both companies respectively
have lack of environment concern is the another conflict that company facing while handling the
long lasting effects of the green projects. Apart from that, it also helps to take the corrective
action plan and long lasting effects on the company structure. According to some other sources
of ISG and Kier they suggested that they don't know about the weather it is wrong and right.
On the contrary results, some of the resources or lack of proper implications green
building projects has been stopped in between the proces. This would give negative results or
impact on the overall construction industry. This get difficult because they often affect the
people and society at a macro level that organisation level are become unclear.
Theme 6: Steps would be taken to strengthen the green project concept and its implementation
process
Interpretation: On the basis of this interpretation process, this has been concluded that, it
concludes that, as per the sources of company information what steps would have taken by the
company that helps them to create the new enlarging process. It also helps to control the process
goals effectively. As per the sources or gathered information of the organisations of ISG and
Kier suggested that enhance civil engineers skills and traits will help company to make the better
challenging and implementing process to make the good presence on the green projects (Kibert,
2016). This also helps to control the big advantage and long term goal objective to be perform in
great possible manner. As per the other sources of the ISG and Kier investigated that direct
implement of theoretical information will be more benefited for the company for taken things
more clearly and goal effective term. it enhances the awareness about green projects and leading
people goals and ideas for the new organization goals. Moreover, it helps to make the long term
challenges and makes the best performing goals.
On the contrary, this would be measures that, due to lack of skilled and creative
professional company become weak to take its green building project goals into its last
destination.
Theme 7: Company would connect end users with green projects
20
would facing by the company. On the other hand as per the respondent of ISG and Kier
suggested that initial cost investment is the conflicted and majorly issues faced by the company
to handling the green projects (Hughes, Champion and Murdoch, 2015). On the other hand
according to some of the other information suggested that of the both companies respectively
have lack of environment concern is the another conflict that company facing while handling the
long lasting effects of the green projects. Apart from that, it also helps to take the corrective
action plan and long lasting effects on the company structure. According to some other sources
of ISG and Kier they suggested that they don't know about the weather it is wrong and right.
On the contrary results, some of the resources or lack of proper implications green
building projects has been stopped in between the proces. This would give negative results or
impact on the overall construction industry. This get difficult because they often affect the
people and society at a macro level that organisation level are become unclear.
Theme 6: Steps would be taken to strengthen the green project concept and its implementation
process
Interpretation: On the basis of this interpretation process, this has been concluded that, it
concludes that, as per the sources of company information what steps would have taken by the
company that helps them to create the new enlarging process. It also helps to control the process
goals effectively. As per the sources or gathered information of the organisations of ISG and
Kier suggested that enhance civil engineers skills and traits will help company to make the better
challenging and implementing process to make the good presence on the green projects (Kibert,
2016). This also helps to control the big advantage and long term goal objective to be perform in
great possible manner. As per the other sources of the ISG and Kier investigated that direct
implement of theoretical information will be more benefited for the company for taken things
more clearly and goal effective term. it enhances the awareness about green projects and leading
people goals and ideas for the new organization goals. Moreover, it helps to make the long term
challenges and makes the best performing goals.
On the contrary, this would be measures that, due to lack of skilled and creative
professional company become weak to take its green building project goals into its last
destination.
Theme 7: Company would connect end users with green projects
20
Interpretation: On the basis of this interpretation process it makes the good interpretation
level and challenging performing goals, as per the sources collected by the secondary tool, it has
been found out that how organization would connect users with green projects. As per the
company data ISG and Kier respectively would suggest that seminars and conferences are more
attractive growth making task for spreading the good knowledge and development session.
According to sources of both the companies collectively suggested that public reviews and
converting successful projects are helps to make the importance of green projects (Luthra and
eta.l., 2014). As per the information of company of both the institution said that increasing the
knowledge and new idea will be give great ideas and thoughts. Overall, process and leading
changes will make the all things implementing properly and challenging.
Theme 8: barriers that company facing while handling the green project planing ?
Interpretation: On the basis of this interpretation process, it has been seen that according
to all sources of company data of secondary survey or the observation has suggested their own
level of presenting level. This makes the process and dealing long term goals aspect that helps to
lead the long term goals. As per the sources of company data suggested that company facing
high challenges. This also helps to keep the more attractive goals to be fulfilled the challenges
and long effectiveness. According to company data and reviews they suggested that due to
inadequate skills for the project contributes will make the long term goals and majorly target
market products. According to some participants of the students would suggest that, its called
long term goals and objectives would company suggested (Darko and Chan, 2016). Apart from
that, some data thinks that due to company ambiguous contingency plan. Company would get
fails to reach the final objective tasks. Final objective goals and better advancing performing task
will also challenge and goal effective process to be implementing.
21
level and challenging performing goals, as per the sources collected by the secondary tool, it has
been found out that how organization would connect users with green projects. As per the
company data ISG and Kier respectively would suggest that seminars and conferences are more
attractive growth making task for spreading the good knowledge and development session.
According to sources of both the companies collectively suggested that public reviews and
converting successful projects are helps to make the importance of green projects (Luthra and
eta.l., 2014). As per the information of company of both the institution said that increasing the
knowledge and new idea will be give great ideas and thoughts. Overall, process and leading
changes will make the all things implementing properly and challenging.
Theme 8: barriers that company facing while handling the green project planing ?
Interpretation: On the basis of this interpretation process, it has been seen that according
to all sources of company data of secondary survey or the observation has suggested their own
level of presenting level. This makes the process and dealing long term goals aspect that helps to
lead the long term goals. As per the sources of company data suggested that company facing
high challenges. This also helps to keep the more attractive goals to be fulfilled the challenges
and long effectiveness. According to company data and reviews they suggested that due to
inadequate skills for the project contributes will make the long term goals and majorly target
market products. According to some participants of the students would suggest that, its called
long term goals and objectives would company suggested (Darko and Chan, 2016). Apart from
that, some data thinks that due to company ambiguous contingency plan. Company would get
fails to reach the final objective tasks. Final objective goals and better advancing performing task
will also challenge and goal effective process to be implementing.
21
CHAPTER 4: CONCLUSION AND RECOMMENDATION
4.1 Introduction
It makes the process and leading challenging goals which also helps to take the new
challenging and material process goals. This chapter of this research is helps to conclude the
things and also recommended some strategies and goals in order to keep the goals managing and
effective. Moreover, further this chapter of the research will also contribute the brief summary of
what the report has done. It also helps to make the proper and implementing task which needs to
be performed clearly into more creating manner. Such as it explained that energy security is the
most important issue among st other issues (Zhou, Goh and Li, 2015).
4.2 Conclusion
Today's importance of green projects has been increased in construction industry. It
makes the process more challenging and creative goals. Apart from that, UK construction
industry has promoted 10 % energy and resources reduction of construction site (Kassem and
eta.l., 2015). This contribution helps country to maintained the proper sustainability growth
towards the positive environment. From the basis of above section it has been concluded that,
project manager plays a most crucial role in the constructive industry Research has discussed the
importance of project planning that helps to control the long term process goals. Overall, study
explained the global concern over climatic and sustainability growth in term of making changes
and leading manageable goals. Overall, it provides the leading and managing target market
performances which helps to leading high performing goals (Ashworth and Perera, 2015). It is
necessary for both the company to take some new projects which is based on green program.
However, both constriction group are the leading companies in UK which grows in highly
productively as well. That also helps to take new controlling power and goals to make the things
better and forward. Apart from that, it also very much necessary and helps to make aware about
the things which depends on the matter of fact.
The main aim of this research is that to identify the factors that keeps the things more
clear and effective. Research has defined the various role of different managing factors that
affect the green projects in construction industry. Besides, study also discussed about the
challenges that project managers encounters such as define objectives and set goals on the basis
of sustainability development (Hwang, Zhao and Tan, 2015). However, it is very necessary for
the construction industry to accomplished the client needs and wants. Today's clients are more
22
4.1 Introduction
It makes the process and leading challenging goals which also helps to take the new
challenging and material process goals. This chapter of this research is helps to conclude the
things and also recommended some strategies and goals in order to keep the goals managing and
effective. Moreover, further this chapter of the research will also contribute the brief summary of
what the report has done. It also helps to make the proper and implementing task which needs to
be performed clearly into more creating manner. Such as it explained that energy security is the
most important issue among st other issues (Zhou, Goh and Li, 2015).
4.2 Conclusion
Today's importance of green projects has been increased in construction industry. It
makes the process more challenging and creative goals. Apart from that, UK construction
industry has promoted 10 % energy and resources reduction of construction site (Kassem and
eta.l., 2015). This contribution helps country to maintained the proper sustainability growth
towards the positive environment. From the basis of above section it has been concluded that,
project manager plays a most crucial role in the constructive industry Research has discussed the
importance of project planning that helps to control the long term process goals. Overall, study
explained the global concern over climatic and sustainability growth in term of making changes
and leading manageable goals. Overall, it provides the leading and managing target market
performances which helps to leading high performing goals (Ashworth and Perera, 2015). It is
necessary for both the company to take some new projects which is based on green program.
However, both constriction group are the leading companies in UK which grows in highly
productively as well. That also helps to take new controlling power and goals to make the things
better and forward. Apart from that, it also very much necessary and helps to make aware about
the things which depends on the matter of fact.
The main aim of this research is that to identify the factors that keeps the things more
clear and effective. Research has defined the various role of different managing factors that
affect the green projects in construction industry. Besides, study also discussed about the
challenges that project managers encounters such as define objectives and set goals on the basis
of sustainability development (Hwang, Zhao and Tan, 2015). However, it is very necessary for
the construction industry to accomplished the client needs and wants. Today's clients are more
22
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
natural and also wanted to live in natural surrounding as well. As per them, construction industry
needs to be focused on the green building projects rather than others. In spite of that, research
also described about the critical areas and skills that helps to get over from such challenges. Such
as proper planning, civil engineers new creativity thoughts and green technology and some other
strategic plans which would be beneficial for the construction industry. This also helps to control
the negative impacts of chemical substances and challenging growth. ISG and Kier both can
adopt the proper effective policy instrument to deal with users and their projects as well. Proper
construction planning and selected criteria of resources will also a helping tool to avoid some
negative effects on environment (Hwang, Zhao and Tan, 2015).
On the basis of research has been done above, it concluded that. In present scenario, this
make sure the better objective and goal performing. About the matter of fact that helps to control
the things which is very much clear and effective. Study also take things more clearly and
specifically and about the things which makes also very much required. Overall study also been
based on the matter. Research also taken questionnaire survey and make better things properly
and challenging. Apart from that, it also helps to control the best possible manner to grow the
green effects on the study (Kassem and eta.l., 2015). Moreover, it brings the never like to grow
properly and effective. It also helps to control the way and the things in better form. As per the
all represented, it has been analyzed the suggestions on green building projects. How it would be
more sustainable and well being opportunities. This makes
4.3 Recommendation
Now it could be recommend that study on customer satisfaction with investigating more
concern on green building will be more helpful and benefited for the persons to make the proper
arrangement planning for sustainability development. Apart from that, this also helps to control
the overall matter of fact and grows better performing level (Zhou, Goh and Li, 2015). Green
planning projects are very necessary for the company to be take care of the long term process. As
compared to conventional building projects management framework helps to managing green
building projects. Projects are also needs to be more presentable and long lasting product goals.
Which is also very much required and more challenging goal performing level. It also helps to
present level of generating thing. All over, integrating the long term goals and objective.
Integrating the research findings will be more helpful to take positive environment further. It is
the integrated process to be achieve in more successful manner (Ashworth and Perera, 2015).
23
needs to be focused on the green building projects rather than others. In spite of that, research
also described about the critical areas and skills that helps to get over from such challenges. Such
as proper planning, civil engineers new creativity thoughts and green technology and some other
strategic plans which would be beneficial for the construction industry. This also helps to control
the negative impacts of chemical substances and challenging growth. ISG and Kier both can
adopt the proper effective policy instrument to deal with users and their projects as well. Proper
construction planning and selected criteria of resources will also a helping tool to avoid some
negative effects on environment (Hwang, Zhao and Tan, 2015).
On the basis of research has been done above, it concluded that. In present scenario, this
make sure the better objective and goal performing. About the matter of fact that helps to control
the things which is very much clear and effective. Study also take things more clearly and
specifically and about the things which makes also very much required. Overall study also been
based on the matter. Research also taken questionnaire survey and make better things properly
and challenging. Apart from that, it also helps to control the best possible manner to grow the
green effects on the study (Kassem and eta.l., 2015). Moreover, it brings the never like to grow
properly and effective. It also helps to control the way and the things in better form. As per the
all represented, it has been analyzed the suggestions on green building projects. How it would be
more sustainable and well being opportunities. This makes
4.3 Recommendation
Now it could be recommend that study on customer satisfaction with investigating more
concern on green building will be more helpful and benefited for the persons to make the proper
arrangement planning for sustainability development. Apart from that, this also helps to control
the overall matter of fact and grows better performing level (Zhou, Goh and Li, 2015). Green
planning projects are very necessary for the company to be take care of the long term process. As
compared to conventional building projects management framework helps to managing green
building projects. Projects are also needs to be more presentable and long lasting product goals.
Which is also very much required and more challenging goal performing level. It also helps to
present level of generating thing. All over, integrating the long term goals and objective.
Integrating the research findings will be more helpful to take positive environment further. It is
the integrated process to be achieve in more successful manner (Ashworth and Perera, 2015).
23
Apart from this it also helps to fulfill the company goals and enhance the connectivity level with
users. Moreover, it also helps to bring the new major goals and challenging behavior to grab the
better objective performance level. Overall, file has been concluded that, major objective and
leading performance level. This makes the proper process and goals as per the leading changes.
Overall, it brings the new journey goals and better opportunity growth. As per the basis of this
task and leading goal material (Zhou, Goh and Li, 2015). Construction company should also
adopt the best possible planning tools to sustain the positive environments towards the leading
the better quality performance. Besides, new moral goals and provides the best possible action
plan towards making long lasting effects and leading changes.
Though the finding of this study further, construction industry may be more helpful and
or constructive industry for making more constructive and challenging performer. Moreover, it
also helpful to take the most approachable target goals. This must also starts the process and
goals with more advancing level.
Moreover, it takes the long term charges and brings to make productive work done.
Company also needs to require more information and importance of green project constructions
will preferably more growth full and leading (Kibert, 2016). That makes the all things possible
and challenging matter of fact. Will also make the proper challenges and growth full fact.
During the construction process green building companies should this makes the process
reliable and adoptable as per the demand of client. Apart from that, ISG and Kier can also need
to adopt green mark strategy for green projects that helps to make more presentable and
challenging. The sustainable green companies also needs to adopt or to deal with good elements.
Besides, standard which makes the process and leading challenging goals, apart from this. It also
very much helpful to creates the leading challenging fact. The whole Project should be
monitored by proper observation (Hughes, Champion and Murdoch, 2015). It makes the process
objective and leading goals. Overall, audits of environmental performance should be carried out
at fixed intervals and internally bu environment managers. Performance up gradation of the
green projects will be more helpful to create the new environmental growth which will be more
productive in future times.
In order to certain the risk factors, it will be the more effective and growth full task to be
performed in grateful manner (Luthra and eta.l., 2014). Green project buildings also very much
helpful to attract the more challenging performance in terms of upgrading the users' attraction.
24
users. Moreover, it also helps to bring the new major goals and challenging behavior to grab the
better objective performance level. Overall, file has been concluded that, major objective and
leading performance level. This makes the proper process and goals as per the leading changes.
Overall, it brings the new journey goals and better opportunity growth. As per the basis of this
task and leading goal material (Zhou, Goh and Li, 2015). Construction company should also
adopt the best possible planning tools to sustain the positive environments towards the leading
the better quality performance. Besides, new moral goals and provides the best possible action
plan towards making long lasting effects and leading changes.
Though the finding of this study further, construction industry may be more helpful and
or constructive industry for making more constructive and challenging performer. Moreover, it
also helpful to take the most approachable target goals. This must also starts the process and
goals with more advancing level.
Moreover, it takes the long term charges and brings to make productive work done.
Company also needs to require more information and importance of green project constructions
will preferably more growth full and leading (Kibert, 2016). That makes the all things possible
and challenging matter of fact. Will also make the proper challenges and growth full fact.
During the construction process green building companies should this makes the process
reliable and adoptable as per the demand of client. Apart from that, ISG and Kier can also need
to adopt green mark strategy for green projects that helps to make more presentable and
challenging. The sustainable green companies also needs to adopt or to deal with good elements.
Besides, standard which makes the process and leading challenging goals, apart from this. It also
very much helpful to creates the leading challenging fact. The whole Project should be
monitored by proper observation (Hughes, Champion and Murdoch, 2015). It makes the process
objective and leading goals. Overall, audits of environmental performance should be carried out
at fixed intervals and internally bu environment managers. Performance up gradation of the
green projects will be more helpful to create the new environmental growth which will be more
productive in future times.
In order to certain the risk factors, it will be the more effective and growth full task to be
performed in grateful manner (Luthra and eta.l., 2014). Green project buildings also very much
helpful to attract the more challenging performance in terms of upgrading the users' attraction.
24
ISG and Kier needs to attract the new company structural goals and makes more grateful impact
on the environment.
As compared to conventional project framework green projects are larger and important
for the construction industry (Darko and Chan, 2016). Green project building are more
beneficial for long term growth and good for the ecosystem as well. Moreover, it helps to bring
the leading and challenging performing growth also will be more impact full and leading
challenging. Overall, present research has been based on the factors identify the planning in
green project building in construction sector. Researcher has measured the different aspects of
the overall study which gives great impact on the overall study level. Overall, it has been proved
from the research that, construction industry required to make some changes as per the green
sustainability between the users demand.
On the basis of secondary survey of this present file, researcher found out the same
potential output and effective goal marketing task. It helps to control the best performance and
long term challenging goals. Apart from this some employees would prefer long term challenges
making the final and effective working performance goals. Overall, conclusion of this research is
to increase the long lasting performance task and better objective performance level. This would
also make the proper and effective goals oriented task. Building sector is considered as the
biggest of greenhouse gas emissions around the world. Green projects has given positive impact
on the environment and gives the long term goals and objective performance. Overall results
should also give long lasting effects on the sustainability development. This research helps to
control the matter of that affect the best leading performing goals.
The green projects help to make the best leading best charges performance goals. Being
in green projects and long term performance goal objective. As the benefits of green projects
rises in the united sates due to market changes. Research report express the long term
challenging and best performance goals. Researcher collected data through secondary research
by getting long term result goals. Present study expressed the continuation projects of the long
term goals that affect the overall green projects. Apart from that, green project building are the
most essential study these days in order to sustain the market target performance. Green projects
build rethink the project goals in order to meet the long term charges. A major objective of this
file is that to build the awareness of healthy environment through which country can promote the
green projects in more effective manner. Green projects has change the way of construction
25
on the environment.
As compared to conventional project framework green projects are larger and important
for the construction industry (Darko and Chan, 2016). Green project building are more
beneficial for long term growth and good for the ecosystem as well. Moreover, it helps to bring
the leading and challenging performing growth also will be more impact full and leading
challenging. Overall, present research has been based on the factors identify the planning in
green project building in construction sector. Researcher has measured the different aspects of
the overall study which gives great impact on the overall study level. Overall, it has been proved
from the research that, construction industry required to make some changes as per the green
sustainability between the users demand.
On the basis of secondary survey of this present file, researcher found out the same
potential output and effective goal marketing task. It helps to control the best performance and
long term challenging goals. Apart from this some employees would prefer long term challenges
making the final and effective working performance goals. Overall, conclusion of this research is
to increase the long lasting performance task and better objective performance level. This would
also make the proper and effective goals oriented task. Building sector is considered as the
biggest of greenhouse gas emissions around the world. Green projects has given positive impact
on the environment and gives the long term goals and objective performance. Overall results
should also give long lasting effects on the sustainability development. This research helps to
control the matter of that affect the best leading performing goals.
The green projects help to make the best leading best charges performance goals. Being
in green projects and long term performance goal objective. As the benefits of green projects
rises in the united sates due to market changes. Research report express the long term
challenging and best performance goals. Researcher collected data through secondary research
by getting long term result goals. Present study expressed the continuation projects of the long
term goals that affect the overall green projects. Apart from that, green project building are the
most essential study these days in order to sustain the market target performance. Green projects
build rethink the project goals in order to meet the long term charges. A major objective of this
file is that to build the awareness of healthy environment through which country can promote the
green projects in more effective manner. Green projects has change the way of construction
25
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
professional design and build to rethink their approaches to almost every aspect of the facility
life cycle.
Nowadays, construction companies focused and shifted towards the green projects in
order to enhance the demand of green buildings. This makes the long term process and target and
makes the better effective target goals. Also, research described the importance and role of green
projects planning towards the company profit as well. Considering that evaluation of alternative
materials and systems is commonly necessary by the design team. Basically, green projects are
integrated design process which is being used right at the start of the project as green projects.
Study also described the challenges that affect the green project building projects. Such
as this describe the long behavioral goals such as company could not find the productive goals
And makes the best approachable process goals. Another issue relates to the improper support of
stakeholders during the project execution. There are some other challenges that company faced
such as lack of communication research on benefits of green buildings, increase of project cost,
lack of credible research and lack of interest from clients. In order to get over from the objectives
and goals, construction industry needs to adopt skilled employees and training goals in order to
fulfilled the goals and objectives.
26
life cycle.
Nowadays, construction companies focused and shifted towards the green projects in
order to enhance the demand of green buildings. This makes the long term process and target and
makes the better effective target goals. Also, research described the importance and role of green
projects planning towards the company profit as well. Considering that evaluation of alternative
materials and systems is commonly necessary by the design team. Basically, green projects are
integrated design process which is being used right at the start of the project as green projects.
Study also described the challenges that affect the green project building projects. Such
as this describe the long behavioral goals such as company could not find the productive goals
And makes the best approachable process goals. Another issue relates to the improper support of
stakeholders during the project execution. There are some other challenges that company faced
such as lack of communication research on benefits of green buildings, increase of project cost,
lack of credible research and lack of interest from clients. In order to get over from the objectives
and goals, construction industry needs to adopt skilled employees and training goals in order to
fulfilled the goals and objectives.
26
REFERENCES
Books and Journals
Ashworth, A. and Perera, S., 2015. Cost studies of buildings. Routledge.
Carter, N., 2018. The politics of the environment: Ideas, activism, policy. Cambridge University
Press.
Darko, A. and Chan, A. P., 2016. Critical analysis of green building research trend in
construction journals. Habitat International. 57. pp.53-63.
Epstein, M. J., 2018. Making sustainability work: Best practices in managing and measuring
corporate social, environmental and economic impacts. Routledge.
Epstein, M. J., 2018. Making sustainability work: Best practices in managing and measuring
corporate social, environmental and economic impacts. Routledge.
Flick, U., 2015. Introducing research methodology: A beginner's guide to doing a research
project. Sage.
Glesne, C., 2015. Becoming qualitative researchers: An introduction. Pearson.
Govindan, K., Rajendran, S., Sarkis, J. and Murugesan, P., 2015. Multi criteria decision making
approaches for green supplier evaluation and selection: a literature review. Journal of
Cleaner Production, 98, pp.66-83.
Guo, F. and et.al., 2014. Effects of project governance structures on the management of risks in
major infrastructure projects: A comparative analysis. International Journal of Project
Management. 32(5). pp.815-826.
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
He, Q. and et.al.,, 2015. Measuring the complexity of mega construction projects in China—A
fuzzy analytic network process analysis. International Journal of Project
Management. 33(3). pp.549-563.
Hughes, W., Champion, R. and Murdoch, J., 2015. Construction contracts: law and
management. Routledge.
Hughes, W., Champion, R. and Murdoch, J., 2015. Construction contracts: law and
management. Routledge.
27
Books and Journals
Ashworth, A. and Perera, S., 2015. Cost studies of buildings. Routledge.
Carter, N., 2018. The politics of the environment: Ideas, activism, policy. Cambridge University
Press.
Darko, A. and Chan, A. P., 2016. Critical analysis of green building research trend in
construction journals. Habitat International. 57. pp.53-63.
Epstein, M. J., 2018. Making sustainability work: Best practices in managing and measuring
corporate social, environmental and economic impacts. Routledge.
Epstein, M. J., 2018. Making sustainability work: Best practices in managing and measuring
corporate social, environmental and economic impacts. Routledge.
Flick, U., 2015. Introducing research methodology: A beginner's guide to doing a research
project. Sage.
Glesne, C., 2015. Becoming qualitative researchers: An introduction. Pearson.
Govindan, K., Rajendran, S., Sarkis, J. and Murugesan, P., 2015. Multi criteria decision making
approaches for green supplier evaluation and selection: a literature review. Journal of
Cleaner Production, 98, pp.66-83.
Guo, F. and et.al., 2014. Effects of project governance structures on the management of risks in
major infrastructure projects: A comparative analysis. International Journal of Project
Management. 32(5). pp.815-826.
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
He, Q. and et.al.,, 2015. Measuring the complexity of mega construction projects in China—A
fuzzy analytic network process analysis. International Journal of Project
Management. 33(3). pp.549-563.
Hughes, W., Champion, R. and Murdoch, J., 2015. Construction contracts: law and
management. Routledge.
Hughes, W., Champion, R. and Murdoch, J., 2015. Construction contracts: law and
management. Routledge.
27
Hwang, B. G., Zhao, X. and Tan, L. L. G., 2015. Green building projects: Schedule performance,
influential factors and solutions. Engineering, Construction and Architectural
Management. 22(3). pp.327-346.
Kaiser, M. G., El Arbi, F. and Ahlemann, F., 2015. Successful project portfolio management
beyond project selection techniques: Understanding the role of structural
alignment. International Journal of Project Management. 33(1). pp.126-139.
Kassem, M. and eta.l., 2015. BIM in facilities management applications: a case study of a large
university complex. Built Environment Project and Asset Management. 5(3). pp.261-277.
Kerzner, H. and Kerzner, H. R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Kibert, C. J., 2016. Sustainable construction: green building design and delivery. John Wiley &
Sons.
Klimova, A. and et.al., 2016. An international Master's program in green ICT as a contribution
to sustainable development. Journal of Cleaner Production. 135. pp.223-239.
Lehmann, J. and Joseph, S. eds., 2015. Biochar for environmental management: science,
technology and implementation. Routledge.
Lewis, S., 2015. Qualitative inquiry and research design: Choosing among five
approaches. Health promotion practice. 16(4). pp.473-475.
Luthra, S. and eta.l., 2014. Identification of critical success factors to achieve high green supply
chain management performances in Indian automobile industry. International Journal of
Logistics Systems and Management 1. 18(2). pp.170-199.
Mackey, A. and Gass, S. M., 2015. Second language research: Methodology and design.
Routledge.
Maes, J., Barbosa, A., Baranzelli, C., Zulian, G., e Silva, F.B., Vandecasteele, I., Hiederer, R.,
Liquete, C., Paracchini, M.L., Mubareka, S. and Jacobs-Crisioni, C., 2015. More green
infrastructure is required to maintain ecosystem services under current trends in land-use
change in Europe. Landscape ecology. 30(3). pp.517-534.
Marcelino-Sádaba, S., González-Jaen, L. F. and Pérez-Ezcurdia, A., 2015. Using project
management as a way to sustainability. From a comprehensive review to a framework
definition. Journal of cleaner production. 99. pp.1-16.
28
influential factors and solutions. Engineering, Construction and Architectural
Management. 22(3). pp.327-346.
Kaiser, M. G., El Arbi, F. and Ahlemann, F., 2015. Successful project portfolio management
beyond project selection techniques: Understanding the role of structural
alignment. International Journal of Project Management. 33(1). pp.126-139.
Kassem, M. and eta.l., 2015. BIM in facilities management applications: a case study of a large
university complex. Built Environment Project and Asset Management. 5(3). pp.261-277.
Kerzner, H. and Kerzner, H. R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Kibert, C. J., 2016. Sustainable construction: green building design and delivery. John Wiley &
Sons.
Klimova, A. and et.al., 2016. An international Master's program in green ICT as a contribution
to sustainable development. Journal of Cleaner Production. 135. pp.223-239.
Lehmann, J. and Joseph, S. eds., 2015. Biochar for environmental management: science,
technology and implementation. Routledge.
Lewis, S., 2015. Qualitative inquiry and research design: Choosing among five
approaches. Health promotion practice. 16(4). pp.473-475.
Luthra, S. and eta.l., 2014. Identification of critical success factors to achieve high green supply
chain management performances in Indian automobile industry. International Journal of
Logistics Systems and Management 1. 18(2). pp.170-199.
Mackey, A. and Gass, S. M., 2015. Second language research: Methodology and design.
Routledge.
Maes, J., Barbosa, A., Baranzelli, C., Zulian, G., e Silva, F.B., Vandecasteele, I., Hiederer, R.,
Liquete, C., Paracchini, M.L., Mubareka, S. and Jacobs-Crisioni, C., 2015. More green
infrastructure is required to maintain ecosystem services under current trends in land-use
change in Europe. Landscape ecology. 30(3). pp.517-534.
Marcelino-Sádaba, S., González-Jaen, L. F. and Pérez-Ezcurdia, A., 2015. Using project
management as a way to sustainability. From a comprehensive review to a framework
definition. Journal of cleaner production. 99. pp.1-16.
28
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Martens, M. L. and Carvalho, M. M., 2017. Key factors of sustainability in project management
context: A survey exploring the project managers' perspective. International Journal of
Project Management. 35(6). pp.1084-1102.
Mok, K. Y., Shen, G. Q. and Yang, J., 2015. Stakeholder management studies in mega
construction projects: A review and future directions. International Journal of Project
Management. 33(2). pp.446-457.
Mok, K. Y., Shen, G. Q. and Yang, J., 2015. Stakeholder management studies in mega
construction projects: A review and future directions. International Journal of Project
Management. 33(2). pp.446-457.
Rostami, A., and et.al., 2015. Risk management implementation in small and medium enterprises
in the UK construction industry. Engineering, Construction and Architectural
Management 22(1). pp.91-107.
Sorvig, K. and Thompson, J. W., 2018. Sustainable landscape construction: a guide to green
building outdoors. Island Press.
Sorvig, K. and Thompson, J. W., 2018. Sustainable landscape construction: a guide to green
building outdoors. Island Press.
Taylor, S. J., Bogdan, R. and DeVault, M., 2015. Introduction to qualitative research methods:
A guidebook and resource. John Wiley & Sons.
Thorne, C. R., and et.al., 2018. Overcoming uncertainty and barriers to adoption of Blue‐Green
Infrastructure for urban flood risk management. Journal of Flood Risk Management. 11.
pp.S960-S972.
Visser, W. and Tolhurst, N., 2017. The world guide to CSR: A country-by-country analysis of
corporate sustainability and responsibility. Routledge.
Volk, R., Stengel, J. and Schultmann, F., 2014. Building Information Modeling (BIM) for
existing buildings—Literature review and future needs. Automation in construction, 38,
pp.109-127.
Voytenko, Y. and et.al., 2016. Urban living labs for sustainability and low carbon cities in
Europe: Towards a research agenda. Journal of Cleaner Production. 123. pp.45-54.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Wong, J. K. W. and Zhou, J., 2015. Enhancing environmental sustainability over building life
cycles through green BIM: A review. Automation in Construction. 57. pp.156-165.
29
context: A survey exploring the project managers' perspective. International Journal of
Project Management. 35(6). pp.1084-1102.
Mok, K. Y., Shen, G. Q. and Yang, J., 2015. Stakeholder management studies in mega
construction projects: A review and future directions. International Journal of Project
Management. 33(2). pp.446-457.
Mok, K. Y., Shen, G. Q. and Yang, J., 2015. Stakeholder management studies in mega
construction projects: A review and future directions. International Journal of Project
Management. 33(2). pp.446-457.
Rostami, A., and et.al., 2015. Risk management implementation in small and medium enterprises
in the UK construction industry. Engineering, Construction and Architectural
Management 22(1). pp.91-107.
Sorvig, K. and Thompson, J. W., 2018. Sustainable landscape construction: a guide to green
building outdoors. Island Press.
Sorvig, K. and Thompson, J. W., 2018. Sustainable landscape construction: a guide to green
building outdoors. Island Press.
Taylor, S. J., Bogdan, R. and DeVault, M., 2015. Introduction to qualitative research methods:
A guidebook and resource. John Wiley & Sons.
Thorne, C. R., and et.al., 2018. Overcoming uncertainty and barriers to adoption of Blue‐Green
Infrastructure for urban flood risk management. Journal of Flood Risk Management. 11.
pp.S960-S972.
Visser, W. and Tolhurst, N., 2017. The world guide to CSR: A country-by-country analysis of
corporate sustainability and responsibility. Routledge.
Volk, R., Stengel, J. and Schultmann, F., 2014. Building Information Modeling (BIM) for
existing buildings—Literature review and future needs. Automation in construction, 38,
pp.109-127.
Voytenko, Y. and et.al., 2016. Urban living labs for sustainability and low carbon cities in
Europe: Towards a research agenda. Journal of Cleaner Production. 123. pp.45-54.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Wong, J. K. W. and Zhou, J., 2015. Enhancing environmental sustainability over building life
cycles through green BIM: A review. Automation in Construction. 57. pp.156-165.
29
Wong, J.K.W. and Zhou, J., 2015. Enhancing environmental sustainability over building life
cycles through green BIM: A review. Automation in Construction. 57. pp.156-165.
Yang, R. J., Zou, P. X. and Wang, J., 2016. Modelling stakeholder-associated risk networks in
green building projects. International journal of project management. 34(1). pp.66-81.
Zhao, X., Hwang, B. G. and Lee, H. N., 2016. Identifying critical leadership styles of project
managers for green building projects. International Journal of Construction
Management. 16(2). pp.150-160.
Zhou, Z., Goh, Y. M. and Li, Q., 2015. Overview and analysis of safety management studies in
the construction industry. Safety science. 72. pp.337-350.
Zhou, Z., Goh, Y. M. and Li, Q., 2015. Overview and analysis of safety management studies in
the construction industry. Safety science. 72. pp.337-350.
Zhou, Z., Goh, Y. M. and Li, Q., 2015. Overview and analysis of safety management studies in
the construction industry. Safety science. 72. pp.337-350.
Zuo, J. and Zhao, Z. Y., 2014. Green building research–current status and future agenda: A
review. Renewable and sustainable energy reviews. 30. pp.271-281.
Zuo, J. and Zhao, Z. Y., 2014. Green building research–current status and future agenda: A
review. Renewable and sustainable energy reviews. 30. pp.271-281.
30
cycles through green BIM: A review. Automation in Construction. 57. pp.156-165.
Yang, R. J., Zou, P. X. and Wang, J., 2016. Modelling stakeholder-associated risk networks in
green building projects. International journal of project management. 34(1). pp.66-81.
Zhao, X., Hwang, B. G. and Lee, H. N., 2016. Identifying critical leadership styles of project
managers for green building projects. International Journal of Construction
Management. 16(2). pp.150-160.
Zhou, Z., Goh, Y. M. and Li, Q., 2015. Overview and analysis of safety management studies in
the construction industry. Safety science. 72. pp.337-350.
Zhou, Z., Goh, Y. M. and Li, Q., 2015. Overview and analysis of safety management studies in
the construction industry. Safety science. 72. pp.337-350.
Zhou, Z., Goh, Y. M. and Li, Q., 2015. Overview and analysis of safety management studies in
the construction industry. Safety science. 72. pp.337-350.
Zuo, J. and Zhao, Z. Y., 2014. Green building research–current status and future agenda: A
review. Renewable and sustainable energy reviews. 30. pp.271-281.
Zuo, J. and Zhao, Z. Y., 2014. Green building research–current status and future agenda: A
review. Renewable and sustainable energy reviews. 30. pp.271-281.
30
31
1 out of 34
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.