Execution and Control of Project through PRINCE-2 Model

   

Added on  2023-01-09

10 Pages2890 Words28 Views
 | 
 | 
 | 
PTOJECT MANAGEMENT-
2
Execution and Control of Project through PRINCE-2 Model_1

Table of Contents
Main Body.......................................................................................................................................3
Execution and control of the project through application of PRINCE-2 model.........................3
End of Project Evaluation report.................................................................................................5
Conclusion.......................................................................................................................................8
REFRENCES...................................................................................................................................9
Execution and Control of Project through PRINCE-2 Model_2

INTRODUCTION
Project management is that kind of process which is related with method, skills,
knowledge and other aspects involved in a project. This makes achievement of objectives and
goals set within a project. These are responsible for accomplishment of project within time
period specified and budget sanctioned for it. Also in helps in maximizing interest of all
stakeholders. In order to make an project executed in proper manner and completion of it in
efficient way applicability of appropriate approach is required to be done and management of
project should be done with efficiency. After completing the report an end project report has to
be prepare by the manager for gaining of outcome which has to be evaluated and mark out the
lessons that has been learned from it. These learnings makes improvisation of project in future.
The report is based on construction of commercial building through an event by which
QA Higher Education College can publish technological construction of building for attracting of
number of students to be attracted is to be discussed. Also application of PRINCE-2 model is
done to control entire project to be made successful. Further reflection of self competence while
executing roles and responsibilities will be done with the help of end of project report.
Main Body
Execution and control of the project through application of PRINCE-2 model
In order to make completion of project the desired results is required to be achieved with
the budget sanctioned and time period given (Aguilera, Villalobos and Dávila, 2017). For this
purpose there has to be applicability of effective approach that is applied to monitor execution of
project possible. It is very important for conducting of activities that is related to project in
planned and disciplined manner. This makes product or services to be produced over fulfilling
quality requirement over customers to attain satisfaction. These are that kind of activities that is
related for controlling for data is related over project and this makes analysis possible with
effectiveness of cost. Also time and management is taken care. Controlling of project is helpful
in measuring of status in a project which is likely to gain outcomes that can be forecasted.
Improvement is done for achieving of better outcome to be achieved. Different process is being
involved within a project that has to be managed through project control, plaining, budgeting,
risk management, change management, forecasting and project management. All the process that
Execution and Control of Project through PRINCE-2 Model_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Execution and Control of Project through PRINCE-2 Model
|10
|2866
|1

Execution and Control of Project through PRINCE-2 Model
|8
|2809
|68

Execution and Control of Project through PRINCE-2 Model
|9
|2817
|1

Execution and Control of Project through PRINCE-2 Model
|9
|3006
|61

Execution and Control of Project through PRINCE-2 Model
|10
|3072
|41

Execution and Control of Project through PRINCE-2 Model
|9
|2760
|23