ProductsLogo
LogoStudy Documents
LogoAI Grader
LogoAI Answer
LogoAI Code Checker
LogoPlagiarism Checker
LogoAI Paraphraser
LogoAI Quiz
LogoAI Detector
PricingBlogAbout Us
logo

Total Cost of Ownership for Server Hardware and Software

Verified

Added on  2023/01/16

|13
|1896
|66
AI Summary
This document provides information about the total cost of ownership for server hardware and software, including the required hardware and software, purchase prices, and maintenance costs. It explains the importance of TCO in assessing the indirect and direct costs associated with information technology. The document also includes server specifications and recommendations for Murdoch University.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: TOTAL COST OF OWNERSHIP
ICT 171 TOTAL COST OF OWNERSHIP ASSINGMENT V2.00
(Student Name)
(University Name)
(Unit Name)
(Professor Name)
(Date)

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
TOTAL COST OF OWNERSHIP 2
Executive summary
Total Cost ownership for organization software is the sum of all indirect and direct costs
incurred by the software. TCO is critical for ROI calculation. Server hardware specifications is a
technical description of all the server components and its capabilities. This includes the speed of
the processor, hard disk, and RAM
The server infrastructure of Murdoch University is aging and is in need of improvements
to support the current industry standards. This is a proposal which will provide a specification of
the server and storage solution which meets some of the requirements such as 100 CPU cores, 40
TB of redundant storage and an uninterruptible power supply.
Table of Contents
Document Page
TOTAL COST OF OWNERSHIP 3
Executive summary.....................................................................................................................................2
Introduction.................................................................................................................................................4
Hardware required.......................................................................................................................................4
Software required........................................................................................................................................8
Purchase price of the hardware and software...............................................................................................9
Total cost of ownership (TCO)....................................................................................................................9
Conclusion.................................................................................................................................................11
References.................................................................................................................................................12
Appendix...................................................................................................................................................13
Introduction
When one plans for hardware which is required for server deployment one should first
determine the usage requirements for the organization. Some of the variables which are required
Document Page
TOTAL COST OF OWNERSHIP 4
to be determined are users, average tasks per one project, and number of tasks. Murdoch
University is currently using a network simulation software Open-source EVE-NG and Cisco’s
packet Tracer. This server proposal paper will have four parts which are the hardware required
to set the hardware and software required to set-up the server, the purchase price of the software
and hardware, and total cost of ownership.
Hardware required
When planning for server hardware requirements for a university deployment, one need
to estimate server scalability which ought to be based on peak visitors. Computer scientist define
peak visitors as the editor to viewer ratio and the total content. The total content as the estimated
as the count of total spaces and the editor ratio as the number of visitors performing updates
versus those who are only viewing the content. Another consideration to make is the maximum
number of the reported usages. The third consideration is the hard disk requirements. Example
the more the attachment that the university have the more the disk required; if the university have
online documentation the minimum requirements for a disk space is 140 Gb for private intranet
the required disk space is 130 Gb.
Server hardware specifications are technical description of the server capabilities. The
listed specifications are processor speed where the processor speed will be indicated in gigahertz.
The random access memory which will be indicated in gigabytes and the hard disk which is a at
times called ROM space.
There are two major environments within the university which are the staff environment.
The two environments ought to completely be separated so as to provide high availability. Table
one below provides a high level view of server hardware requirements for university staff
requirements. The required server is a web server application server and windows file server.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
TOTAL COST OF OWNERSHIP 5
The proposed hardware layout landscape is as shown by figure one in the appendix. Table one
below shows hardware requirements for a web server. Table shows hard ware specification for
application server, and table tree for web server specification
Table 1: Hardware specifications for a HP Web server
Item Model Manufacturer Description
RAM DDR4 RAM (1 Tb) Memory
model
CMU16GX4M2C3200C16R
Corsair Corsair vengeance
LED RAM, the RAM
features CL16
Latency and a
whopping of 3466
MHZ speed. The
RAM is a 288-pin
with a stunning LED
lightening, the
vengeance LED is
optimized and
compatible with latest
CPUs
Hard drive 8Tb hard drive model
ST8000N0022
Seagate 3.5 inch. The hard
drive delivers up to
7200RPM spin speed
along with a
sustainable rate of up
Document Page
TOTAL COST OF OWNERSHIP 6
to 210Mbs
UPS
(Uninterruptabl
e Power
Supply)
Type ought to be on-line-
Phase. Smartonline of 20-
240V 10Kva AND 9kW
double-conversation UPS.
The model is Tripp Lite
SU10000RT3UG 10kVA
Active
manufacturers
The output VA needs
to be 10000, an input
Voltage of 200 AC;
208V VAC and a plug
type of hardwire. The
UPS can support
0/60Hz operation for
worldwide frequency
compatibility. The
depth of
The UPS is 95.25 and
minimum required is
83.82
CPU Core i7 series itel The motherboard need
to itel with a speed of
100Mgz. A big factor
CPU with nahalem
socket 1366 i7
Table 2: Dell hardware specifications for an Application server specification
Item Model Manufacture Description
RAM DDR4 (10GB) Corsair The data rates is
Document Page
TOTAL COST OF OWNERSHIP 7
between 1600Mb/s to
3200Mb/s, with
undefined of up to
125 Mhz. The RAM
as Larger DIMM
Capacities and
Provides Additional
Specialty Readout
Hard drive 1 TB hard drive
Seagate barracuda
Pro family model
Seagate 3.5 inch hard drive
SATA type hard disk.
The read and write
speed is up to
165MB/sec
UPS AVRX55OUD AVR
series model
Active manufacturers The UPS is of type
Line-interactive with
a single-phase and an
output of 550 and an
input voltage of 230
V AC and a plug type
of CEE 7/7 Scuko
CPU AMD FX-series
processor FX-8320
series
IBM Small factor 100 cpu
cores

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
TOTAL COST OF OWNERSHIP 8
All the servers need to have keyboard and mouse. With an optical storage i.e. a DVD
drive slot and four flash ports for hard drive. The server needs to have a network card port both
RJ 45 port and RJ 11 port. A super VGA (1024 by 768) resolution. All the servers need to come
with a 23 inch monitor (Hioki, 2009). The resolutions that the monitor need to support is 64 by
240 at 1bpp, 320 by 240 at 2 bpp, and 240 by 160 at 4bpp. In addition, the monitor need to
display various display modes such as 1/2/4 bit per pixel color depth support, programmable
cursor control, 3 overlapping screens in graphic mode, and text, graphics combined with graphic
and text display modes. Lastly, the server need to have a low power consumption.
Software required
The web server needs to be running VMware vSphere virtualization environment 64 bit.
The server needs to have be installed with internet Kaspersky’s anti-virus with a five years
license. Other software to be installed are Microsoft office 2016 64 professional edition. The
application server need to be installed with Ubuntu server software. The server also need to be
installed with Kaspersky’s anti-virus software installed with a five year license (Guthrie & Lowe,
2018). Other software required is .Net Framework version 3.5 SP 1 where 11.2 or higher is
required, windows media player 10 or higher. The BIOS settings ought to have the following
settings; a boot order should be hard drive, DVD and flash drive, the power management should
be maximum, processor options ought to be hyper-threading enabled and should disable the
UEFI mode settings
Document Page
TOTAL COST OF OWNERSHIP 9
Purchase price of the hardware and software
The two types of UPS comes with a market price of 179 dollars. The two types of server
required comes with a price of 2000 dollars. Twenty three inches monitor server comes with a
price of 200 dollars. All the hardware need to be brand new devices with a five year warrant.
Kaspersky’s anti-virus comes with a market price of 10 dollars for internet one. The antivirus
one comes with a market price of 5 dollars. The VMware vSphere virtualization environment has
a market price of $1200 (Desai, 2014)
Total cost of ownership (TCO)
TCO is designed to assist in assessing an organization indirect and direct costs associated
with information technology. When evaluating this TCO for this university four consideration
were made these are; the initial costs of software and hardware, cost for initial server deployment
and staff training, the ongoing cost for maintenance fees for software upgrades and updates and
the help-desk support and the expenses related to network and system maintenance back-up and
data protection services, and the costs associated with downtime (Kajamoideen, 2015).
Total cost ownership for the university
Server information Database and application server
Manufacturers Intel, Corsair, Seagate Active manufacturers,
and IBM
Models HP and Dell server models
Proposed role Database and application servers
Estimated lifespan Five years
Warranty length 3 years warrant
Document Page
TOTAL COST OF OWNERSHIP 10
Hardware direct costs
UPS $180
HP database server $2500
RAM upgrade to 1TB $800
Storage upgrade $900
Other hardware $400
Total hardware costs $4780
Software direct costs
VMware vSphere virtualization environment $1200
Ubuntu server $700
Back-up operating system software $900
Internet Kaspersky’s antivirus (ten users) $100
Norton antivirus (5 users) $60
Server management software $800
Microsoft Office 2016 ( For 20 users) $150
Total software costs $3910
Setup and maintenance costs
Setup and installation $2400
Annual maintenance $1600
Other setup $900
Other annual maintenance $1000
System administration cost $3000
Total maintenance costs $8900

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
TOTAL COST OF OWNERSHIP 11
Facility indirect costs
Annual server power usage $800
Annual cooling $200
Other annual facility $300
TOTAL DIRECT COSTS $17590
TOTAL INDIRECT COSTS $8900
Conclusion
This is a server hardware and software specification document. This paper has
documented the hardware required to set-up servers for Murdoch University. This has be done
by completely specifying the actual hardware required, their manufacturer and models. Also the
paper has highlighted the price that goes with hardware and their software license. In addition,
the paper has documented the total cost of ownership for the two types of servers which have
been specified. Total cost ownership has been utilized to help vendors and the university
determine the indirect and direct costs of the server hardware and software
References
Desai, A. (2014). Windows NT network management : reducing total cost of ownership.
Chicago: New Riders Press.
Guthrie, F., & Lowe, S. (2018). VMware vSphere design by Forbes Guthrie . New york: Springer
press.
Document Page
TOTAL COST OF OWNERSHIP 12
Hioki, W. (2009). Telecommunications . New York: Prentice Hall Press.
Kajamoideen, M. R. (2015). VMware ESXi Cookbook. by Mohammed Raffic Kajamoideen .
Chicago: Packt Publishing Press.
Appendix
Figure 1: Proposed hardware layout
Hardware
HQ
Current hardware
Document Page
TOTAL COST OF OWNERSHIP 13
1 out of 13
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]