Project Management Transport for London
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
INTRODUCTION Project management is considered as the procedure of using specific knowledge, skills, tools as well as technique with the objective of delivering something valuable to the people. Management of project lead whole efforts and activities in the direction of attaining determined goals and objectives in efficient manner(Evdokimov Domantsevich, and Konyhov, 2017). There is various information is included in project documents such as budget, scope, objective and time limit to completeproject.InthisreportEalingCounciltoTransportforLondonistakeninto consideration. In this report network diagram, work bases structure, stakeholder analysis, as well as project methodologies are covered. Along with that, risk analysis which consists 20 risks that are raised during the implementation of project. TASK 1 Project Management Methodologies Business Case Executive summary Project management is considered as the complex process that consists high level planning as well as management to execute the activities of project on proper manner. Aim of respective report is to undertake the road project of Transport for London to develop, greener, sustainably attractive streets that improve buss network in London. Reasons Reason of this road project are mentioned below: ï‚·Most essential reason is to develop street in London that attract visitors and enhance beauty of city. ï‚·With the objective of improving bus network of London. ï‚·To make road more convenient to travel. Expected benefits ï‚·It reduced the consumption of fuel in vehicles that protect environment. ï‚·This project prevents road accidents. Expected drawbacks ï‚·There are high financial resources are required to make aesthetic and safer road.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
There are various project management methodologies are available for organisation that can be used to run all operations of project in efficient manner.CFL adopt waterfall methodology to attain its determined goal that is discussed below: Waterfall technique:It is considered as the most traditional method that is related to project management that enable the organisation to perform defined task in logical sequence. For It assist the organisation to conduct its activities in like waterfall throughout the all stages of stages of project such as analysis, design, development and testing(Jiang, Klein and Fernandez, 2018). Transport for London Plc follows all these stages through using waterfall method. Respective organisation analyse the need of project then prepare design of construction and after that test it in market and ensure its maintenance. This methodology helps the organisation to conduct its activities properly and attain determined goals and objectives. TASK 2 Developing network diagram Network diagram:Network diagram is related to presenting activities of some specific project or event in graphical manner. The concept of network diagram helps project management teamtoidentifytheconnectionofeachandeveryactivitythatarerelatedtoproject. Implementation of this facilitates organisation to accomplish all project activities on determined time with great effectiveness as well as make coordinate or connection among all activities that are required to complete project on time. Ealing Council to Transport for London creates networkdiagraminwhichallactivitiesofprojectarerepresentedwiththeirrespective completion time. This visual representation of determined project activities enable business to complete project of defined deadline and identify the connection among them to attain objective efficient manner. Ealing Council to Transport for London network diagram is explained below:
The diagram is developed through underneath basis Early Start Activity NumberEarly finish Slack timeACTIVITY NAME Late StartDurationLate Finish
From the above diagram, it is analysed that through using this business identify the critical path that is the shortest distance and easiest way that helps to complete the project activities of defined project in minimum time-period(Kanagarajoo, Fulford, and Standing, 2019).Ealing Council to Transport of London develop network diagram to identify the critical path to complete the project on time. Orange and blue arrows are considered as the critical that takes lesser time to accomplish project on time. Shortest time-period of completing the project are1, 2, 4, 5, 9, 10, 21 and 22. Least time to complete the project is 116 days. Gantt chart:It is also the another tool of project management tool that present all project activities with the respect of time. Gantt chart activities are mentioned below:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Task 3 Stakeholder analysis Stakeholder Analysis:Stakeholder analysis is referred as the framework or tool that is undertake by business to identify interest and power of business stakeholders and their impact on business operations. There are various internal and external stakeholders who getting affected by business actions and impact on them as well. Ealing Council to Transport for London included various stakeholders who possess power and interest in project. Stakeholder matrix is mentioned below: Low power and low interest:These are the stakeholders who possess low interest and power in project actions such as audience(Larsson, Eriksson and Pesämaa, 2018). Audience play important role in the success of project because they observe all output closely. High power and low interest:Committee members fall in this category and they are external stakeholders with having high power and low interest in project operations. It is important for the organisation to provide them information related to progress and other issues on regular bases. High power and high interest:These are external stakeholders who have high power and interest in project activities and decisions.Investors are grouped in this category of stakeholder because they provide funds for the project and take participation in decision-making as well. Low power and high interest:These are internal stakeholder who possess low power and high interest. Participants and organisers are internal who play important role in the success of project. It is important for organisation to provide balanced information to satisfies their interest. Task 4 Work breakdown structure and organisational structure ThemethodologyofWBSisdefinedastheprojectmanagementtoolwhichis implemented by the business to manage various business activities in proper way. Using this method help organisation to conduct project operation with great effectiveness through breaking all project activities on comparatively smaller task that are easy to complete(Ng, 2019). There are specific time in which all these activities are done in manageable manner. It outlines all task
andactivitiesthatarerequiretobecompletedontimewithefficiency. The concept of organisational structure is considered as the system through which business arrange and manage its activities in sequential manner with the objective of attaining determined goals and objectives on time with efficiency. Business adopts suitable organisational structure as per business requirement and business operations that help business to allot roles and responsibilities among all stages that enable employees to perform their operations in smoother way(Niknazar and Bourgault, 2017).Proper organisational structure ensures the flow of information among all department. It helps business to lead its operations towards growth.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Task 5 Risk analysis In the process of implementing project, there are various risks and problems that impact overall efficiency and effectiveness. Some of risks are explained below: No.RiskEffectPossibilityMitigation 1Failure of powerLowHighIn this project number of measured are taken into consideration to reduce the riskbyensuretheavailabilityof generators. 2UncertaintyModerateLowprojectmanagers’makeestimation regardingfutureuncertaintiesand create plan to mitigate them. 3Impacton environment LowModerateManagertakemeasurestowards environment safety as well as security. 4Lakeofsponsor interest ModerateLowDevelopattractiveplanstoinfluence and retain sponsors. 5Ineffectivetime management LowModerateEffective and proper schedule is created to accomplish project activities on time. 6Inefficient managementof project ModerateLowDevelopeffectiveplanningand implementthemproperlytomanage activities 7Safety and securityLowModerateManagersusesdifferentsafetyand securityaspectsforpreventing environment. 8Social issuesHighLowIdentify audience expectations than try to fulfil them efficiently. 9Inefficientmedical assistance LowModerateManagersofprojectarrangemedical facilities at site. 10Threat of fireModerateHighManager ensured the availability of fire
extinguisherandothersafety equipment’s. 11Loss of reputationLowHighManagerscreateeffectiveplanand execute it in proper manner to improve reputation. 12Safety of staffHighModerateMake sure to take security measures in the process of construction work. 13Equipment lossesModerateLowEnsurethatproperequipment’sare available at the time of construction. 14Lossoffinancial resources LowLowUse different sources to get funds. 15Permissionoflocal authorities LowHighTakepermissionfromrelatedlocal authorities before starting the project. 16LocationModerateHighGet information related to the project location, condition and other than take decision accordingly. 17Breakdownof machinery HighModerateMake sure the availability as well as maintenanceofequipmentand machineries. 18Lack of staff membersLowHighAppoint skilled and talented candidate throughusingsystematicrecruitment process. 19Unfavourable conditions ModerateLowManagerofprojectneedtoanalyse possibilities that affect the project and develop plan to manage them. 20WeatherHighModerateMake estimation of conditions related toweatherthancreatestrategiesto reduce negative impacts on project.
Task 6 Quality expectations, quality specifications, acceptance criteria The aspect of quality expectations is considered as quality of business products and service that is expected by the customers. With the objective of sustaining competitive business environment for longer period of time, organisation need to analyse customer’s needs, demands and preferences then provide them quality products and services accordingly the satisfy them. In the context ofEaling Council to Transport for London analyse customer’s expectation and provide them quality houses that satisfy their needs and retain them with organisation for longer period of time(Sreedharan and Sunder, 2018). it takes various measures to conduct all activities in right direction and attain objective. Effective benchmarks are set by the organisation and at the time of project accomplishment, actual outcome are compared with benchmarks to analyse efficiency. Monitoring techniques are taken into consideration to complete project with quality. Project management team analyse expectation criteria to maintain effective image in the minds of customers(Thesing, Feldmann, and Burchardt, 2021). There are various measures are taken to fulfil all needs and requirements of customers. ParticularsExpected quality Acceptance criteriaQuality specification Techniques of controlling AdvertisingHighSalesenhancesby 15% Usageof technology Providing training and development MethodologyHighProductivity enhances by 5%. WaterfallImplementationof principles Risk assessment HighEnhancementin productivity by 4%. Risk registerExecutionofrisk management techniques PerformanceHighTurnoverenhances by 6%. Work Breakdown Structureand Gantt chart Supervisionand monitoring techniques.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
CONCLUSION As per the above report, it can be concluded that concept of management is very important for conducting all project related operation in proper manner. Business uses different tools and techniques are used like work break down structure, Gantt chart, organisational to complete project on time. Business takes various actions towards mitigating risk that are raised during implementation of project. REFERENCES Books and Journals Evdokimov, I.V., Domantsevich, V.S. and Konyhov, V.A., 2017. The use of online applications forprojectmanagementforplanninginIT-management.Современные информационные технологии, (25), pp.44-47. Jiang, J.J., Klein, G. and Fernandez, W.D., 2018. From project management to program management:an invitationtoinvestigateprogramswhereITplaysasignificant role.Journal of the Association for Information Systems,19(1), p.1. Kanagarajoo, M.V., Fulford, R. and Standing, C., 2019. The contribution of social media to projectmanagement.InternationalJournalofProductivityandPerformance Management. Larsson, J., Eriksson, P.E. and Pesämaa, O., 2018. The importance of hard project management and team motivation for construction project performance.International Journal of Managing Projects in Business. Ng,J.J.,2019.Understandingprojectmanagementdirectionsfromprojectmanagement trends.IEEE Engineering Management Review,47(2), pp.128-132. Niknazar, P. and Bourgault, M., 2017. Theories for classification vs. classification as theory: Implications of classification and typology for the development of project management theories.International Journal of Project Management,35(2), pp.191-203. Sreedharan V, R. and Sunder M, V., 2018. A novel approach to lean six sigma project management: a conceptual framework and empirical application.Production Planning & Control,29(11), pp.895-907. Thesing, T., Feldmann, C. and Burchardt, M., 2021. Agile versus waterfall project management: decision model for selecting the appropriate approach to a project.Procedia Computer Science,181, pp.746-756.