Types of WBS and Reasons for Using Top Down Approach
Verified
Added on 2023/04/26
|4
|702
|437
AI Summary
This article discusses the different types of WBS approaches, namely Top Down and Bottom Up, and the reasons for using the Top Down approach. It also explains the benefits of using the Top Down approach in project management.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: WBS WBS Name of the Student Name of the University Author note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
WBS Types of WBS The different types of WBS approaches are as follows: - 1.Top Down Approach: Top Down approach helps in generation of more complete and an accurate Work Break Down Structure (WBS). In this approach compartmentalising of tasks are performed. the deliverables are decomposed to their smallest parts and the prosecutionsaretakenintoconsideration.Focusissuppressedmoreinthe departmentalized data of the scheduling rather than that of the design that is made. This is one of the most rational method of drawing a WBS (Ahmed 2016). These are the reasons of using Top Down Approach of WBS formation. 2.Bottom Up Approach: In case of the Bottom Up approach, problems that are fundamental in nature are solved. In this case the issues that are prolonged are not solved with similar equity. Encapsulation of the data that are examined are also performed in this approach. The information used are somewhat hiding from the entire source mitigation process. High amount of communication is needed in this process (Simion-Melinte 2016). Testing of the iterative steps are also required in this approach. Reasons of Using the Top Down process Reasons of using the Top Down process includes realization of the focussed usage of the resources that are present in the commencing process of individualistic management of the application. The implementation of the firsts case acts as the identity management of the entire solution. Better management of the identity solution is achieved with the help of the Top Down approachof theWBS(Martens& Vanhoucke2017). The impactof the operational resources is well maintained and this is the main reason that Top Down approach is chosen over the other approach. Decision making of the projects are also positive affected
WBS in case of using the Top Down approach. This insists the fact that the management of the project will be performed with the help of better prosecution terminology. Project goals that are set are very specific in nature. This also leads to the fact that scope development gets easier. The major reason of implementing the Top Down approach over the Bottom Up approach includes the fact that the flexibility of the policy that is framed with the help of the Bottom Up approach is low. This leads to failure in projects that are concerned with the iterative stages of the project (Kerzner & Kerzner 2017). Greater cooperation is required in case of usage of the Bottom Down approach in case the management of the project is performed with the help of the Bottom Up approach. This acts as one of the prime reasons that the usage of the top down approach will be used over the Bottom Up approach ins commencing of the project (Harrison & Lock 2017). The entire process will have to be completed with the infrastructure that is initially present rather than the infrastructure that us required by the business organization. This aspect decreases the cost efficiency of the project that is performed with the help of the Bottom Up approach.Bottom Up approach is more time consuming as well as more energy consuming, hence in today’s society usage of Top Down approach is considered to be beneficial.
WBS References Ahmed, A. (2016).Software project management: a process-driven approach. Auerbach Publications. Harrison, F., & Lock, D. (2017).Advanced project management: a structured approach. Routledge. Kerzner, H., & Kerzner, H. R. (2017).Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Martens, A., & Vanhoucke, M. (2017).The integration of constrained resources into top- down project control.Computers & Industrial Engineering,110, 277-288.