This document presents a self-assessment of an individual's performance within a large construction project. The author reflects on their contributions, the success of the project, and seeks to identify areas for improvement. They discuss stakeholder communication, financial management, risk prioritization, and the importance of contingency planning. The document also outlines a plan for future development, including time management training and further learning in the construction industry.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
UNDERTAKING A BUILDING CONSTRUCTION RISK ASSESSMENT
Student Name
University Name
Student Name
University Name
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents
An introduction describing the organization, and its business, in greater detail.............................2
A detailed timing plan, outlining the key milestones of the project;...............................................3
A discussion surrounding, any product of value realized by the work;...........................................5
Learning Outcomes..........................................................................................................................6
A self-assessment, in relation to; the overall success of the work.................................................13
A self-assessment of performance, in relation to; each of the 4 learning outcomes;....................18
References......................................................................................................................................19
An introduction describing the organization, and its business, in greater detail.............................2
A detailed timing plan, outlining the key milestones of the project;...............................................3
A discussion surrounding, any product of value realized by the work;...........................................5
Learning Outcomes..........................................................................................................................6
A self-assessment, in relation to; the overall success of the work.................................................13
A self-assessment of performance, in relation to; each of the 4 learning outcomes;....................18
References......................................................................................................................................19
Project Description
Brief description of the organisation, its business, the management and staff, and a site
layout and description of work place
The project is about building construction activities risk assessment. My role was of risk
management team. The management of Guan Ho Construction Company is successfully in the
assessment of the risk of their project.
Aims and Objectives
The primary aim of the firm is to satisfy all their internal and external stakeholders. It is also
important for the firm to make use all their resources in an effective manner and Guan Ho
Construction is highly successful in this case.
Time table
The total time taken was around 5 months.
Barriers
Yes I faced few challenges at times and it was resolved in a timely manner. I approach my
seniors for resolving all my queries and it was solved effectively. I am grateful to all my seniors
and the entire project management team to resolve my issues and queries in a timely manner.
The organization Guan Ho Construction makes effective resource planning so that full utilization
of resources takes place.
Four learning outcomes
Brief description of the organisation, its business, the management and staff, and a site
layout and description of work place
The project is about building construction activities risk assessment. My role was of risk
management team. The management of Guan Ho Construction Company is successfully in the
assessment of the risk of their project.
Aims and Objectives
The primary aim of the firm is to satisfy all their internal and external stakeholders. It is also
important for the firm to make use all their resources in an effective manner and Guan Ho
Construction is highly successful in this case.
Time table
The total time taken was around 5 months.
Barriers
Yes I faced few challenges at times and it was resolved in a timely manner. I approach my
seniors for resolving all my queries and it was solved effectively. I am grateful to all my seniors
and the entire project management team to resolve my issues and queries in a timely manner.
The organization Guan Ho Construction makes effective resource planning so that full utilization
of resources takes place.
Four learning outcomes
The management of the firm also implements modern version of technology in their respective
projects. Apart from this, all the employees are well directed and well adverse about their roles
and responsibilities regarding the project. In addition to this, the organization also negotiates
with their suppliers before closing the deal. After selecting the best alternative supplier, the
organization Guan Ho Construction closes the deal. However, the organization also takes into
consideration the quality of raw materials given by the suppliers. If the quality of materials is not
up to the mark, then, the firm do not close the deal with that respective supplier. A proper budget
is constructed on quarterly basis and the variances are also measured in order to curtail the
expenses. The next comes project coordinator members who manages all the activities of the
project. These are middle level group of people in case of every project. They play a key role in
communication between upper level and middle level. In addition to this, in case of the firm
Guan Ho Construction, the process of risk management plan takes place via middle level project
coordinators. The last comes field coordinators who are actually workers in case of construction
projects. From this, it can be inferred that the organization manages the hierarchies of control in
an effective manner. From the project, several reflective questions can be answered. They are as
follow:-
• What should or could I have done differently?
I could have interact more and my time management skills would have been better.
• What would I continue to do the same?
I need to learn effective time management skills
• What stopped me from doing this? What have I learnt about myself? (positive and
negative)
projects. Apart from this, all the employees are well directed and well adverse about their roles
and responsibilities regarding the project. In addition to this, the organization also negotiates
with their suppliers before closing the deal. After selecting the best alternative supplier, the
organization Guan Ho Construction closes the deal. However, the organization also takes into
consideration the quality of raw materials given by the suppliers. If the quality of materials is not
up to the mark, then, the firm do not close the deal with that respective supplier. A proper budget
is constructed on quarterly basis and the variances are also measured in order to curtail the
expenses. The next comes project coordinator members who manages all the activities of the
project. These are middle level group of people in case of every project. They play a key role in
communication between upper level and middle level. In addition to this, in case of the firm
Guan Ho Construction, the process of risk management plan takes place via middle level project
coordinators. The last comes field coordinators who are actually workers in case of construction
projects. From this, it can be inferred that the organization manages the hierarchies of control in
an effective manner. From the project, several reflective questions can be answered. They are as
follow:-
• What should or could I have done differently?
I could have interact more and my time management skills would have been better.
• What would I continue to do the same?
I need to learn effective time management skills
• What stopped me from doing this? What have I learnt about myself? (positive and
negative)
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
The fast delivery of the project stopped me to interact more with the people.
• What did I learn about my current knowledge or level of practise? (strengths and
weaknesses)
I learned about people management, risk management and team dynamics.
• Did the experience achieve any of my learning goals or meet any of my required
competencies?
Yes, the experience have achieved my learning goals and all my competencies are met.
• Anything negative that went badly how would I make sure it doesn’t happen again?
Only time management did not go well. I will learn more to enhance the skills.
• What did I learn about my current knowledge or level of practise? (strengths and
weaknesses)
I learned about people management, risk management and team dynamics.
• Did the experience achieve any of my learning goals or meet any of my required
competencies?
Yes, the experience have achieved my learning goals and all my competencies are met.
• Anything negative that went badly how would I make sure it doesn’t happen again?
Only time management did not go well. I will learn more to enhance the skills.
An introduction describing the organization, and its business, in greater detail
The organization Guan Ho Construction Company is registered with the Building and
Construction Authority (BCA) of Singapore. The main office of the organization is located in
main office is located at 395/395A Changi road. The company has been in building business for
the last 60 years (Guan Ho Construction Co (Pte) Ltd. 2018).
It has completed over 2 billion worth of projects. The given report will analyze the risk
assessment of new project implemented by the organization. It has been seen that there are many
risks associated with construction project, therefore, it is of utmost importance to prioritize and
manage those risks in an effective manner. Based on this, recommendations will be given and a
reflective report of the project will be prepared.
The organization Guan Ho Construction Company is registered with the Building and
Construction Authority (BCA) of Singapore. The main office of the organization is located in
main office is located at 395/395A Changi road. The company has been in building business for
the last 60 years (Guan Ho Construction Co (Pte) Ltd. 2018).
It has completed over 2 billion worth of projects. The given report will analyze the risk
assessment of new project implemented by the organization. It has been seen that there are many
risks associated with construction project, therefore, it is of utmost importance to prioritize and
manage those risks in an effective manner. Based on this, recommendations will be given and a
reflective report of the project will be prepared.
A detailed timing plan, outlining the key milestones of the project;
Milestone List
Project: Date: 04/01/20xx
Milestone
No.
Milestone Mandatory/Optional Completion
Date
Verification
Milestone List
Project: Date: 04/01/20xx
Milestone
No.
Milestone Mandatory/Optional Completion
Date
Verification
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
001 Project Start Mandatory 5/1/2018 Sponsor Approval
002 Complete
Gathering
Requirements
Mandatory 10/1/2018 Sponsor Approval
003 Complete Design
and Risk
Management Plan
Mandatory 25/1/2018 Sponsor Approval
004 Prioritizing the
risks
Mandatory 5/42018 Sponsor Approval
005 Complete Testing
of the risk
management plan
Mandatory 10/4/2018 Sponsor Approval
006 Complete
Implementation of
the plan
Mandatory 12/5/2018 Sponsor Approval
008 Contingency Plan Mandatory 14/5/2018 Approval
007 Project End Mandatory 20/5/2018 Sponsor Approval
Table 1: Milestones of the project
An analysis and description of progress (consider the aims and objectives I set);
The main aim of the report is to assess the risks of the project.
002 Complete
Gathering
Requirements
Mandatory 10/1/2018 Sponsor Approval
003 Complete Design
and Risk
Management Plan
Mandatory 25/1/2018 Sponsor Approval
004 Prioritizing the
risks
Mandatory 5/42018 Sponsor Approval
005 Complete Testing
of the risk
management plan
Mandatory 10/4/2018 Sponsor Approval
006 Complete
Implementation of
the plan
Mandatory 12/5/2018 Sponsor Approval
008 Contingency Plan Mandatory 14/5/2018 Approval
007 Project End Mandatory 20/5/2018 Sponsor Approval
Table 1: Milestones of the project
An analysis and description of progress (consider the aims and objectives I set);
The main aim of the report is to assess the risks of the project.
The aims and objectives of the project can be evaluated with the help of SMART objectives.
Specific- The objective is to analyze and assess the risks of the project of the organization. Each
and every stakeholder associated with the risk assessment plan can understand this.
Measurable:- It can be measured with the help of the feedback of the stakeholders. According to
the needs and requirements of the project, the respective milestones have been set. The evidence
of completion can be evaluated with the outcome of the risk management plan (Krajewski,
Malhotra and Ritzman 2015)
Realistic-It is possible for all project team members to complete all the required tasks in a timely
manner and manage the risks within the new project of the organization. The plan is fit into the
overall pattern of work of individuals associated with this project (Glendon, Clarke and
McKenna 2016)
Time bound-The given risk management plan is set to complete within 6 months of the project.
It is feasible to meet this deadline. The next review date will be after 1st four months of the
project. It is also appropriate to do this work of risk assessment at this current stage (Schwalbe
2015).
A discussion surrounding, any product of value realized by the work;
The surroundings of the project was extremely positive as the organization firmly believes on
effective team dynamics while making its large project successful for both short run and long
run. In addition to this, it can be also inferred that the value of importance for stakeholders have
also been realized by the top level management of the organization. It is also important for the
Specific- The objective is to analyze and assess the risks of the project of the organization. Each
and every stakeholder associated with the risk assessment plan can understand this.
Measurable:- It can be measured with the help of the feedback of the stakeholders. According to
the needs and requirements of the project, the respective milestones have been set. The evidence
of completion can be evaluated with the outcome of the risk management plan (Krajewski,
Malhotra and Ritzman 2015)
Realistic-It is possible for all project team members to complete all the required tasks in a timely
manner and manage the risks within the new project of the organization. The plan is fit into the
overall pattern of work of individuals associated with this project (Glendon, Clarke and
McKenna 2016)
Time bound-The given risk management plan is set to complete within 6 months of the project.
It is feasible to meet this deadline. The next review date will be after 1st four months of the
project. It is also appropriate to do this work of risk assessment at this current stage (Schwalbe
2015).
A discussion surrounding, any product of value realized by the work;
The surroundings of the project was extremely positive as the organization firmly believes on
effective team dynamics while making its large project successful for both short run and long
run. In addition to this, it can be also inferred that the value of importance for stakeholders have
also been realized by the top level management of the organization. It is also important for the
firm to collect all the resources before starting the construction project. These are the values that
are realized by the firm during the project (Sadgrove 2016)
Learning Outcomes
Learning Outcome #1 - Synthesise and demonstrate skills and competencies required for
successful integrated management
The first learning outcome can be evaluated with the help of “Integrated Management”. The first
stage is the planning stage. At the every 1st stage, the selection of project team members were
done. A team of 20 people was constructed including 1 project manager. All the team members
were given separate duties to fulfil the aims and objectives of the project. The given roles and
responsibilities are as follows:-
are realized by the firm during the project (Sadgrove 2016)
Learning Outcomes
Learning Outcome #1 - Synthesise and demonstrate skills and competencies required for
successful integrated management
The first learning outcome can be evaluated with the help of “Integrated Management”. The first
stage is the planning stage. At the every 1st stage, the selection of project team members were
done. A team of 20 people was constructed including 1 project manager. All the team members
were given separate duties to fulfil the aims and objectives of the project. The given roles and
responsibilities are as follows:-
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Who Role
Project Manager Will manage the day-to-day operational
and tactical aspects of multiple or large-
scale projects.
Works on client engagements within
practice.
Reviews high-level deliverables across
projects.
Stakeholder’s satisfaction.
Minimizes our exposure and risk across
multiple projects.
Manages scope and mitigates risk across
projects.
Risk Management Team (10-12 members) Identification of the various risks
Categorize and prioritize the risks
Risk Management Plan
Contingency Planning
Review Report
Other team members Reviewing the project
Financing
Collection of resources
Project Manager Will manage the day-to-day operational
and tactical aspects of multiple or large-
scale projects.
Works on client engagements within
practice.
Reviews high-level deliverables across
projects.
Stakeholder’s satisfaction.
Minimizes our exposure and risk across
multiple projects.
Manages scope and mitigates risk across
projects.
Risk Management Team (10-12 members) Identification of the various risks
Categorize and prioritize the risks
Risk Management Plan
Contingency Planning
Review Report
Other team members Reviewing the project
Financing
Collection of resources
Table 2: Roles and Responsibilities of team members of the project
After selection of project team members and defining their roles and responsibilities, it is of
utmost importance to mediate the plan and consult with the stakeholders. Due to this reason, it is
also important to prepare a stakeholder communication plan at the beginning of the project. This
can be further explained with the help of the stakeholder communication plan:-
Stakeholder Communication medium
Customers Direct message/online medium/social media
Suppliers Via mails
Employees Direct message
Table 3: Stakeholder communication plan
The organization Guan Ho Construction Company uses this stakeholder communication plan in
order to communicate with the stakeholders. They have a definite set of measures and definite
communication plan in order to complete any kind of construction project. This makes them
successful in the long. Apart from this, the stakeholder communication plan and risk
management plan goes side by side (Fleming and Koppelman 2016).
Learning Outcome #2 - Displays resourcefulness and initiative in tackling a variety of
practical tasks in an occupational setting
It is also important for the firm to solve their problems effectively and in a timely manner. The
organization uses a 360 degree feedback approach in order to take feedback from their
employees as well as their stakeholders. Apart from this, there are online review systems, from
which Guan Ho Construction can take feedback of the suppliers. This helps the organization to
manage their internal risks and external business risks associated with construction projects. This
After selection of project team members and defining their roles and responsibilities, it is of
utmost importance to mediate the plan and consult with the stakeholders. Due to this reason, it is
also important to prepare a stakeholder communication plan at the beginning of the project. This
can be further explained with the help of the stakeholder communication plan:-
Stakeholder Communication medium
Customers Direct message/online medium/social media
Suppliers Via mails
Employees Direct message
Table 3: Stakeholder communication plan
The organization Guan Ho Construction Company uses this stakeholder communication plan in
order to communicate with the stakeholders. They have a definite set of measures and definite
communication plan in order to complete any kind of construction project. This makes them
successful in the long. Apart from this, the stakeholder communication plan and risk
management plan goes side by side (Fleming and Koppelman 2016).
Learning Outcome #2 - Displays resourcefulness and initiative in tackling a variety of
practical tasks in an occupational setting
It is also important for the firm to solve their problems effectively and in a timely manner. The
organization uses a 360 degree feedback approach in order to take feedback from their
employees as well as their stakeholders. Apart from this, there are online review systems, from
which Guan Ho Construction can take feedback of the suppliers. This helps the organization to
manage their internal risks and external business risks associated with construction projects. This
can be considered as an effective process for problem solving among the stakeholders
undertaken by the organization (Turner 2016)
The organization also implements trial version of risk management process in their project to
check whether it will work or not in the long run. Due to this reason, lot of trials is important in
order to manage such a huge construction project in a successful manner. In addition to this, it
can be also inferred that resource planning is also important along with trails of risk management
and project implementation process. The main resources required by Guan Ho Construction for
this project are as follows:-
Human resources
Raw materials
Suppliers
IT technology
The project management hierarchy is as follows:-
Figure 1: Project Management Hiearchy
undertaken by the organization (Turner 2016)
The organization also implements trial version of risk management process in their project to
check whether it will work or not in the long run. Due to this reason, lot of trials is important in
order to manage such a huge construction project in a successful manner. In addition to this, it
can be also inferred that resource planning is also important along with trails of risk management
and project implementation process. The main resources required by Guan Ho Construction for
this project are as follows:-
Human resources
Raw materials
Suppliers
IT technology
The project management hierarchy is as follows:-
Figure 1: Project Management Hiearchy
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
(Source: Heagney2016)
From the above figure, it can be inferred that in case of major projects, the project manager is the
head of projects in case of project hierarchy. In addition to this, it can be inferred that the next
position is of training coordinator and financial head. In case of large construction projects, the
role of finance and accounts head is of crucial importance. Large amount of money is at stake in
such cases. Therefore, a proper budgeting and collection of financial resources from various
sources of funds plays a key role in case of every organization (Kerzner and Kerzner 2017). In
case of Guan Ho Construction, the collection of funds is mainly from sources of debt and some
parts of equity. (Fuller et al. 2017)
Learning Outcome #3 - Examine the critical practical concerns that arise in carrying out a
project within the workplace and synthesise the constraints that exist within such
frameworks
There are several risks associated with any kind of construction projects. These are as follows:-
Business risk
Resource risk
Environmental risk
Technological risk
Financial Risk
Legal Risks
Political risks (Nicholas and Steyn2017)
From the above figure, it can be inferred that in case of major projects, the project manager is the
head of projects in case of project hierarchy. In addition to this, it can be inferred that the next
position is of training coordinator and financial head. In case of large construction projects, the
role of finance and accounts head is of crucial importance. Large amount of money is at stake in
such cases. Therefore, a proper budgeting and collection of financial resources from various
sources of funds plays a key role in case of every organization (Kerzner and Kerzner 2017). In
case of Guan Ho Construction, the collection of funds is mainly from sources of debt and some
parts of equity. (Fuller et al. 2017)
Learning Outcome #3 - Examine the critical practical concerns that arise in carrying out a
project within the workplace and synthesise the constraints that exist within such
frameworks
There are several risks associated with any kind of construction projects. These are as follows:-
Business risk
Resource risk
Environmental risk
Technological risk
Financial Risk
Legal Risks
Political risks (Nicholas and Steyn2017)
It is important for the firm to analyze and prioritize the risks in a timely manner. This can be
done with an effective project management plan. This can be further explained by identifying the
risks and hazards:-
the construction workplace itself, including its location, laIt, condition and accessibility
selection of appropriate design relating to the construction work
hazardous substances, including the handling, use, storage, and workplace transport or
disposal of hazardous substances
the presence of asbestos
systems of work
Selection of plant, including the transport, installation, erection, commissioning, use,
repair, maintenance, dismantling, disposal storage or of plant
manual handling, including the potential for occupational overuse injuries, and
Physical working environment, for example, the potential for electric shock, immersion
or engulfment, fire or explosion, slips, trips and falls.
It is also important for the firm to analyze employee and staff availability. The organization
Guan Ho Construction maintains an effective roster in order to check the availability of the
employees during the project. The organization manages project finance while preparing
forecasted cash flows and budget. The organization Guan Ho Construction also manages
supplier customer relationships in an effective manner. They take regular feedback from all
their suppliers and customers and solve all their grievances in a timely manner. Learning
Outcome #4 - Critically apply knowledge about the practical application and synthesise
the different abilities required to implement the chosen client based tasks
done with an effective project management plan. This can be further explained by identifying the
risks and hazards:-
the construction workplace itself, including its location, laIt, condition and accessibility
selection of appropriate design relating to the construction work
hazardous substances, including the handling, use, storage, and workplace transport or
disposal of hazardous substances
the presence of asbestos
systems of work
Selection of plant, including the transport, installation, erection, commissioning, use,
repair, maintenance, dismantling, disposal storage or of plant
manual handling, including the potential for occupational overuse injuries, and
Physical working environment, for example, the potential for electric shock, immersion
or engulfment, fire or explosion, slips, trips and falls.
It is also important for the firm to analyze employee and staff availability. The organization
Guan Ho Construction maintains an effective roster in order to check the availability of the
employees during the project. The organization manages project finance while preparing
forecasted cash flows and budget. The organization Guan Ho Construction also manages
supplier customer relationships in an effective manner. They take regular feedback from all
their suppliers and customers and solve all their grievances in a timely manner. Learning
Outcome #4 - Critically apply knowledge about the practical application and synthesise
the different abilities required to implement the chosen client based tasks
The organization Guan Ho Construction follows a hierarchical and adhocracy culture to meet
the requirements of the stakeholders in this dynamic business environment. In addition to
this, this type of culture helps the firm to manage its employees in a dynamic and creative
manner. The hierarchical culture helps the firm to follow the chain of command to manage
the risks in the given project. In addition to this, it can be also inferred that the organization is
successful in managing grievances of all their respective employees (Lock 2017). The
employees of the firm follows the concept of Bend over here it comes again rule in order to
implement quality drives and waste reduction in the construction project. This also helps the
firm to eliminate the risk of waste reduction and lack of quality.
Guan Ho Construction also follows Q x A = E formula to manage change within the
organization. If both quality and acceptance is combined together, then, the required change
will be effective. They are also in the verge of improvement of methodologies in order to
maintain their sustainability. In case of change management, the project management team
focus on upon the group of 60 percent who sit on the fence” so to speak, in case of 20/60/20
Rule. The efforts will be upon them, as they are key to success for managing the change
successfully as they form the majority of people. Due to this reason, this learning outcome
was met successfully.
A self-assessment, in relation to; the overall success of the work
Description
• Short description of I experience in the learning set
the requirements of the stakeholders in this dynamic business environment. In addition to
this, this type of culture helps the firm to manage its employees in a dynamic and creative
manner. The hierarchical culture helps the firm to follow the chain of command to manage
the risks in the given project. In addition to this, it can be also inferred that the organization is
successful in managing grievances of all their respective employees (Lock 2017). The
employees of the firm follows the concept of Bend over here it comes again rule in order to
implement quality drives and waste reduction in the construction project. This also helps the
firm to eliminate the risk of waste reduction and lack of quality.
Guan Ho Construction also follows Q x A = E formula to manage change within the
organization. If both quality and acceptance is combined together, then, the required change
will be effective. They are also in the verge of improvement of methodologies in order to
maintain their sustainability. In case of change management, the project management team
focus on upon the group of 60 percent who sit on the fence” so to speak, in case of 20/60/20
Rule. The efforts will be upon them, as they are key to success for managing the change
successfully as they form the majority of people. Due to this reason, this learning outcome
was met successfully.
A self-assessment, in relation to; the overall success of the work
Description
• Short description of I experience in the learning set
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
I have learned about management of risks in case of large construction projects.
• Reflection on the general experience of working in an inter-professional learning set i. e:
• -what was my role?
I was a part of the risk management team for the construction project for the organization Guan
Ho Construction.
• -team dynamic did it function well was it welcoming?
The team dynamics was extremely positive as the organization follows a dynamic work culture
and they give importance to resolve grievances in a timely manner.
• -was everyone communicating effectively?
Most of the people was communicating effectively. However, there were few people who were
arrogant and not ready to listen to others.
• -reflection on the learning set project
My learning was immense in this construction project. I face several challenges which I was
successful to overcome.
• Feelings
*How did I feel and what did I think prior to the group work?
I was not positive before the starting of the project. I felt a bit nervous prior to the group
work.
*How did I feel and what did I think during the experience?
• Reflection on the general experience of working in an inter-professional learning set i. e:
• -what was my role?
I was a part of the risk management team for the construction project for the organization Guan
Ho Construction.
• -team dynamic did it function well was it welcoming?
The team dynamics was extremely positive as the organization follows a dynamic work culture
and they give importance to resolve grievances in a timely manner.
• -was everyone communicating effectively?
Most of the people was communicating effectively. However, there were few people who were
arrogant and not ready to listen to others.
• -reflection on the learning set project
My learning was immense in this construction project. I face several challenges which I was
successful to overcome.
• Feelings
*How did I feel and what did I think prior to the group work?
I was not positive before the starting of the project. I felt a bit nervous prior to the group
work.
*How did I feel and what did I think during the experience?
I felt very positive during my experience to be associated with this construction project. In
addition to this, it can be also inferred that I also learned different types of risk management
techniques.
*How did I react during the experience?
I also reacted in a positive manner and I was up for new challengers during the experience.
*How did I feel and what did I think after the experience?
After the experience, I feel very proud to be associated with the project. I have learned many
new things during this project.
Evaluation
• What went well and badly during the experience?
The learning went well during the experience. On the contrary, hectic hours spend during the
project was not good as expected.
• How did the experience end?
My experience went in a positive note. I have learned many things about risk management and
team dynamics in this large construction project. Therefore, this project was highly successful in
my career as the learning was immensely good.
• How did I and others react to every situation?
My risk management team was open for change and we used to react positively in every
situation. This can be a positive sign of team dynamics of our project and risk management
team.
addition to this, it can be also inferred that I also learned different types of risk management
techniques.
*How did I react during the experience?
I also reacted in a positive manner and I was up for new challengers during the experience.
*How did I feel and what did I think after the experience?
After the experience, I feel very proud to be associated with the project. I have learned many
new things during this project.
Evaluation
• What went well and badly during the experience?
The learning went well during the experience. On the contrary, hectic hours spend during the
project was not good as expected.
• How did the experience end?
My experience went in a positive note. I have learned many things about risk management and
team dynamics in this large construction project. Therefore, this project was highly successful in
my career as the learning was immensely good.
• How did I and others react to every situation?
My risk management team was open for change and we used to react positively in every
situation. This can be a positive sign of team dynamics of our project and risk management
team.
Analysis
• How was my contribution useful and what evidence justifies this? If unable to contribute
in some elements explain why?
I believe that my contribution was positive in the entire project. I worked late hours and I
gave my best in the project so that it can be successful. It is evident from the success of this
project
• Were other people’s reactions similar to my own? Why were they similar or different?
Other people reactions are also similar to me which is evident from their behavior.
Action plan
• What do I need to do to be better prepared next time?
I will do proper research before involving myself in such kind of large construction
projects.
• What are the areas that need to be developed?
Only time management did not go well. It needs to be developed.
• What steps need to be in place to achieve success in the future?
I need to groom my time management and technical skills of construction industry.
• Do I feel I need to attend training if so what training and why?
Yes, I need training in time management
• Do I feel I need to learn more to help be more prepared in future?
Yes, I need to learn more in future to attain my goals.
• How was my contribution useful and what evidence justifies this? If unable to contribute
in some elements explain why?
I believe that my contribution was positive in the entire project. I worked late hours and I
gave my best in the project so that it can be successful. It is evident from the success of this
project
• Were other people’s reactions similar to my own? Why were they similar or different?
Other people reactions are also similar to me which is evident from their behavior.
Action plan
• What do I need to do to be better prepared next time?
I will do proper research before involving myself in such kind of large construction
projects.
• What are the areas that need to be developed?
Only time management did not go well. It needs to be developed.
• What steps need to be in place to achieve success in the future?
I need to groom my time management and technical skills of construction industry.
• Do I feel I need to attend training if so what training and why?
Yes, I need training in time management
• Do I feel I need to learn more to help be more prepared in future?
Yes, I need to learn more in future to attain my goals.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
A self-assessment of performance, in relation to; each of the 4 learning outcomes;
From the above four learning outcomes, I have learned that proper utilization of resources and a
stakeholder communication plan is of utmost importance for success of various organizations. In
addition to this, it can be also inferred that management of finance in a timely manner plays a
key role in large construction projects. There needs to be a proper project hierarchy and it is of
utmost importance for the firms to prioritize the risks as per the needs of the stakeholders. Apart
from this, a contingency plan is also important during long run if things do not work well.
From the above four learning outcomes, I have learned that proper utilization of resources and a
stakeholder communication plan is of utmost importance for success of various organizations. In
addition to this, it can be also inferred that management of finance in a timely manner plays a
key role in large construction projects. There needs to be a proper project hierarchy and it is of
utmost importance for the firms to prioritize the risks as per the needs of the stakeholders. Apart
from this, a contingency plan is also important during long run if things do not work well.
References
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management.
Project Management Institute.
Fuller, M.A., Valacich, J.S., George, J.F. and Schneider, C., 2017. Information Systems Project
Management: A Process and Team Approach, Edition 1.1. Prospect Press.
Glendon, A.I., Clarke, S. and McKenna, E., 2016. Human safety and risk management. Crc
Press.
Guan Ho Construction Co (Pte) Ltd. (2018). Guan Ho Construction Co (Pte) Ltd. [online]
Available at: https://www.guanho.com/ [Accessed 28 May 2018].
Heagney, J., 2016. Fundamentals of project management. AMACOM Div American Mgmt
Assn.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Krajewski, L.J., Malhotra, M.K. and Ritzman, L.P., 2015. Operations management: processes
and supply chains. Pearson.
Lock, D., 2017. The essentials of project management. Routledge
Nicholas, J.M. and Steyn, H., 2017. Project management for engineering, business and
technology. Taylor & Francis.
Sadgrove, K., 2016. The complete guide to business risk management. Routledge.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management.
Project Management Institute.
Fuller, M.A., Valacich, J.S., George, J.F. and Schneider, C., 2017. Information Systems Project
Management: A Process and Team Approach, Edition 1.1. Prospect Press.
Glendon, A.I., Clarke, S. and McKenna, E., 2016. Human safety and risk management. Crc
Press.
Guan Ho Construction Co (Pte) Ltd. (2018). Guan Ho Construction Co (Pte) Ltd. [online]
Available at: https://www.guanho.com/ [Accessed 28 May 2018].
Heagney, J., 2016. Fundamentals of project management. AMACOM Div American Mgmt
Assn.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Krajewski, L.J., Malhotra, M.K. and Ritzman, L.P., 2015. Operations management: processes
and supply chains. Pearson.
Lock, D., 2017. The essentials of project management. Routledge
Nicholas, J.M. and Steyn, H., 2017. Project management for engineering, business and
technology. Taylor & Francis.
Sadgrove, K., 2016. The complete guide to business risk management. Routledge.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
1 out of 21
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.