Operations and Project Management: Review and Critique of Unilever's Operations Management Principles
Verified
Added on  2023/06/07
|18
|5404
|285
AI Summary
This report reviews and critiques Unilever's operations management principles, including reality, humility, organization, accountability, change, quality control, and success. It also discusses continuous improvement plans and recommendations for improvement, such as adopting Six Sigma principles and regularly bringing innovative changes to products.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
ID Unit Number and TitleUnit 187 – Operations and Project Management TitleReview and Critique of Operations Management (Part 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Content Part 1: Business Report 1. An introduction to chosen organizationp 2. An explanation of operation vs operations managementp 3. A review and critique of the implementation of operations management principles within the chosen organizationp 4. An analysis of the extent to which the operations management of the organisation in the case study meets the requirements of the organizationp 5. Discussion of continuous improvement as a philosophy and describe the Lean principlesp 6. A continuous improvement plan, including your justified recommendations for improvement, based on your review and critique of operations management principles within your organizationp 7. Conclusionp Referencesp 2
1. An introduction to chosen organization Operation and Project management helps the business to run effectively and efficiently. Operations refers to the day to day activity which business carry out out in order increase the worth of the enterprise and earn profit(Guerreiro, 2018). In order to deliver the quality commodity and services to the consumers, the business should give more focus on managing operation on the daily basis. To make the proper utilization of the resources, it is very essential for the business organization to make strategies and plans according to the operation and project management of the business. In this report,Unilever plc is a British multinationalconsumer goods company. This organization mainly deals in personal care and beauty, home care, foods and refreshments. Unilever is headquartered in London, England and was established in 1929. This firm is famous for providing quality goods in reasonable prices to the consumers. This particular report deals in the difference between operation and operation management, review of the principles, continuous improvement by adopting different models and theories like lean principles and plans that helps in bringing change into the operation and finished goods of the firm. In addition to this, the report also deals in strategies and project life cycle stages in order to carry out the project very smoothly. This can be done in appropriate manner by applying PLC as well as other theories ans models. 2. An explanation of operation vs operations management. I All the function which are related with the manufacturing, production and supply within a business organization is known as operation. In order to achieve growth and success, these activities are carried outin the business(Sillaber, 2019). This process not only helps the company management to take care of the quality management but also make strategies plan in engaging and utilizing resources effectively and efficiently in order to meet the customers demand. Operation management refers to the business administration practices that helps in creating and managing the organization efficiency. Operation management controls and monitors all the activity of the organization(Tian and et. al., 2022). Through this the customer requirement can be fulfilled easily by managing the product supply, logistics and quality of product. The main difference between operation and operation management are as follows: 3
OperationsOperations Management All the day to day activities are carried out related to development of product, sales and management of inventory. In order to make the profit, Unilever has operations to sell the final goods and services. In order to maintain efficiency, operation management has been adopted by Unilever in order to control all the activities. To manage and enhance the quality operation management plays an important role. By utilizing superior material and labour, Unilever can bring the change in their products like soap. 3. A review and critique of the implementation of operations management principles within the chosen organization Operation and project management are one of the most crucial concepts in order to run the business smoothly(Koch and Schermuly, 2020). It helps the business organization to work with extreme efficiency so that maximum profit can be earned. Unilever is one the leading and larger manufacturer of the consumer goods and quality products. In order to satisfy the consumers needs and demand the respective organization prepares the strategies for managing the product quality, fast delivery and maintain work process along with the inventory management. This will the help in developing cost effective products which consumer can easily afford. By applying relevant models and techniques, the operation management helps in managing overall activities. As customers needs are more shifted towards the organic products so, Unilever has made strategies in shifting towards organic product to provide healthy life to its consumers. This could be done by focusing on operational principles which are discussed below: ï‚·Reality: This principle of operation management is most foremost one. According to this, the manager of Unilever takes into the consideration the problem instead of applying tools and techniques. Through this realistic solution can be applied to the particular commodity. Here, Unilever can identify the problems in making organic products. ï‚·Humility:According to the perspective of the employee this is one the most important principle of operation management(Gonzalez and et. al., 2021). It is necessary for the organization to manage final goods along with the employee. Here, the labors of Unilever can create a culture of building connection with other members so that positivity is maintained within the organization. ï‚·Organization:As per this principle all the activities and departments are connected to each other within an organization. When all the departments works together to achieve the mission and vision of the organization, then 4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
profits are maximized. Therefore, Unilever needs to maintain proper coordination among the material, labor and process so that they can work according to consumers needs and preference. Accountability:In order to achieve the organizational goals and objectives the organization should work according to the set standards(Kogan, 2022). Here, the managers of Unilever needs to be accountable so that they can produce organic products according to the standards and criteria. Change:This principle of organizational management suggests that firm should work according to the change in the market. The Unilever should make the change in the product according to the customers needs and wants. Quality control:This is much important in the workplace. The Unilever needs to maintain the quality of the product so that they can achieve the objective of producing organic products. Success:This is one of the most vital and important principal of the operational management as every business organization wants to achieve success(Uusiauttind, Hyvärinen, 2021). Here the Unilever needs maintain its customer loyalty in order to gain success so all the activities must be performed in appropriate manner. 4. An analysis of the extent to which the operations management of the organization in the case study meets the requirements of the organization In order to gain profit, principals of operation management are essential and important. Unilever has good position in the market which leads the managers of the company to take right decision for the commodity. In order to meet the requirements and demand of the customers operational management helps in following ways: The basic requirement of the firm and customers is quality products. Each and every customers wants quality product so that they lead to the healthy life style. So by using the quality material the company will be able to attract large number of customers. This will lead the customers to improve the living standard. Unilever provides its customers with the cost effective products by adopting different techniques in operation and management. By using quality raw material, Unilever serves its customer with the reasonable products. This is the reason due to which company are able maintain its customers loyalty towards the product. Unilever has maintained their work place very effectively which help them to to coordinate towards the achieving the mission and vision. Through this 5
company can take best use of the commodity and skills as they have good relations with the employee, suppliers. ï‚·To make the products according to the market trends the principles of operation management are helpful for the Unilever. This leads to increase of the customer satisfaction as the manager are good at decision making and market research. 5. Discussion of continuous improvement as a philosophy and describe the Lean principles Continuous improvement is the process of working in a effective manner by creating plans and implementing it in an appropriate manner(Sabariego, Bickenbach and Stucki, 2022). In order to keep control over the quality of goods and services, it is one of the best process which company can adopt. This results in the success and growth of the respective company in domestic as well as in international platform. Lean principles To have control over the wastage in the organization, lean methodologies are applied. This principal basically helps the organization in reducing the production cost and set a minimum price of the commodity and services. Value Defining:This principal shows the value of the product which is determined through the customer needs(Poth and et. al., 2019). The customer satisfaction is one most important key factor which company needs to focus on. Here, the Unilever keeps on providing the customers with innovative products with the best quality and reasonable price. Mapping of Value Stream:Here the Unilever focus on each and every factors such as price, quality, features and usefulness of the product through which it leads in increasing value to their customers. By eliminating unnecessary factors in the product which customer don't want leads in increasing customer loyalty. Creating Flow:As per this principle all the resources of the organization should be on the right path such as employee, material etc. This will lead the company to make use of the best resources in order to achieve profit(Marttonen-Arola, and et.al., 2020). Here the Unilever should make sure that proper training and development programs are provided to the employee to achieve the mission and vision of the organization. Pull Establishment:This principle deals and focus on the management of the inventory. Here, it suggests that the inventory utilization should be done according to the requirement. There should not be any wastage, overlapping and excess use of the material so that cost effectiveness can be maintained. 6
Apply six sigma and its effectiveness In order to increase overall profitability of the organisation, six sigma is one of the most useful technique(Oprime and et. al., 2021). This helps the business management to meet with the dynamic business environment. This technique helps the organisation to improve production and capability of the business which assist in achieving goals and objectives. Unilever should adopt this technique so that they can maintain reliability and gain long term success. The elements of six sigma are discussed below: ï‚·Define:It is very important for the organisation to have definite goals and objective. Unilever should have defined set of goals and objectives so that they can have continuos improvement. This will lead the employee to give more focus and perform the task in appropriate manner. ï‚·Measure:This principal state that the organisation should keep checking its quality of the product and services(Prashar, 2020). If quality of the product is not appropriate then this principal can be applied by Unilever. ï‚·Analyse:This principal can be adopted by the organisation to analyse the production. It helps in identifying, detecting and overlapping of the material which leads in providing quality and cost effective products. ï‚·Design: Unilever must have specific design for the organic products which helps the customer to identify the product easily. ï‚·Verify: This is the final process in this principal where all the process done till now are verified by the Unilever. 6. A continuous improvement plan, including your justified recommendations for improvement, based on your review and critique of operations management principles within your organization Continuous improvement plan helps the organization to resolve any quality issues that arises during the time of the production. In context to Unilever, they can approach some factors which are discussed below: Plan:Proper planning helps the organization to achieve goals and objectives so it be done on a continuous basis(Singh and et. al., 2019). By making strategic plan it help the business to meet the customer demand and wants according to the new trends. The Unilever plans the change in product and services according to the requirement of the customers. As Unilever is planning to develop more organic and healthy products according to the demand of the customers who are more into living healthy life. 7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Do:The organization need to implement the plan in order to being the changes into their products and services. In respect to being some innovative products the company needs to implement the plan on the short term basis. This will help the employee of the Unilever to work with great efficiency. Check: The change which is adopted by the organization should be regularly monitored. Unilever managers keeps on supervising the changes so that errors can be eliminated. Act: It is very necessary for the organization to take action in the changes made in order to survive for the long term. The action should be taken in appropriate manner so that organizational success are achieved effectively and efficiently. Continuous improvement plan plays a vital role and is much necessary for an organization to bring changes and work according to customers needs and preference(Narottam, Mathiya, zhagan and Kumar, 2019). This helps in developing more potential into the organization and helps them to perform well. It also leads the organization to reduce the wastage, overlapping of the resources so that cost effective products are available to the customers. Unilever can increase its competition by making and adopting changes and continuously focusing on their operations and management. ï‚·By analyzing dynamic business environment and customer needs and demands, the Unilever needs to regularly bring innovative and change in the product. ï‚·The company should make strategies in such a way that employee can adopt the changes frequently. ï‚·Unilever can adopt sex sigma principles so that they can maintain the quality of the product very easily. 7. Conclusion From the above report it can be concluded that operation and project management helps the business organization to remain in the market for the long term. Through this the resources are utilized effectively and effectively which helps the business organization to gain maximum profits. Operation and operation 8
management helps the business to conduct all the activities very smoothly so growth and success can be achieved. By adopting different techniques and models of the operational management, the business can meet the wants and needs of the customer. Developing quality and cost effective products leads the respective organization to gain the competitive advantage. As the business environment is becoming very complex and dynamic, so by making continuous improvement helps the business to gain customer loyalty. The company should also adopted lean principle and six sigma in order to increase the overall performance of the organization. In addition to this continuous improvement also helps the organization to reduce the wastage, overlapping and excess use of the resources so that efficiency can be maintained within the organization. References Guerreiro, S., 2018. Using Markov theory to deliver informed decisions in partially observable business processes operation.International Journal of Operations Research and Information Systems (IJORIS),9(2), pp.53-72. Sillaber, C., 2019. Mining Your Own Business? Operation of Decentralized Systems as Civil Law Partnerships. Orig.: Mining Your Own Business? Betrieb Dezentraler Systeme als GesbR. Tian, and et. al., 2022, March. Research and application of key technologies for virtual operation of information and communications technology resource chain. InThird 9
International Conference on Electronics and Communication; Network and Computer Technology (ECNCT 2021)(Vol. 12167, pp. 152-160). SPIE. Koch, J. and Schermuly, C.C., 2020. Who is attracted and why? How agile project management influences employee's attraction and commitment.International Journal of Managing Projects in Business. Gonzalez and et. al., 2021. Development and initial testing of the Multidimensional Cultural Humility Scale.Measurement and Evaluation in Counseling and Development,54(1), pp.56-70. Kogan, M., 2022.Education accountability: An analytic overview. Routledge. Uusiautti, S. and Hyvärinen, S., 2021. Defining the new concept of sustainable success–A state-of-the-art analysis on the phenomenon.New Ideas in Psychology,60, p.100819. Sabariego, C., Bickenbach, J. and Stucki, G., 2022. Supporting evidence-informed policy making in rehabilitation: A logic framework for continuous improvement of rehabilitation programs.Health Policy,126(3), pp.152-157. Poth, and et. al., 2019. Lean and agile software process improvement in traditional and agile environments.Journal of Software: Evolution and Process,31(1), p.e1986. Marttonen-Arola, and et.al., 2020. Introducing lean into maintenance data management: a decision making approach.Engineering Assets and Public Infrastructures in the Age of Digitalization, pp.249-257. Oprime, and et. al., 2021. Financial impacts of innovation in Six Sigma projects.Total Quality Management & Business Excellence,32(7-8), pp.829-851. Prashar, A., 2020. Adopting Six Sigma DMAIC for environmental considerations in process industry environment.The TQM Journal,32(6), pp.1241-1261. Singh and et. al., 2019Marttonen-Arola, and et.al., 2020Oprime, and et. al., 2021Prashar2020Singhnd Singh, H., 2018.Strategic Implementation of Continuous Improvement Approach: Improving the Performance of Small and Medium-Sized Enterprises. Springer. 10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Narottam, Y., Mathiyazhagan, K. and Kumar, K., 2019. Literature review: continuous improvement through Lean Six Sigma.International Journal of Productivity and Quality Management,28(1), pp.3-27. Table of Content Part 2: Project Portfolio Project Titlep An overview of the case study you have been givenp An explanation of each stage of the PLC that applies to your selected project, including supporting documentation for each stage (e.g., business case, the project plan, cost-benefit analysis and work breakdown structure): Project initiationp Project planningp Project executionp Project closurep Analysis of the project methodologies and tools usedp Review and critically evaluate the effectiveness of the PLC in application to your project using the appropriate theories models and conceptsp Project Title To reduce the absenteeism of staff and help them to lead a healthy life style. To decline the congestion issue therefore reduction in the staff movement during rest hours. An overview of the case study you have been given A projectlife cycleis aframework inwhichthestages aredefinedfor rendering the project by project mangers from start to finish. The project occurs for 11
the particular time period because to complete a specific task and to attain the objective the project framework and team is made. Thus it requires to be have a proper planning, initiation and implementation. A Cromwell tool's company is based in midland and have 1250 employees. The aim of this project in the company is to reduce the absenteeism of staff and their movement during break hours in the premises. In addition, they also want to develop a CSR activity as helping the staff to lead a healthy lifestyle. This has an effect on the goodwill of an organization and the performances of an organization. If a company wants to enhance their performance they should come up with strategy to engage the employee in company's activities. It isessentialforthecompanytoprovidethelunchandhealthylifestyleinthe organization itself to the staff as a result it has positive impact on their efficiency. An explanation of each stage of the PLC that applies to your selected project, including supporting documentation for each stage (e.g., business case, the project plan, cost- benefit analysis and work breakdown structure): Project life cycle It includes a phases which helps to complete the project and attain the goals. The number of stages can be differ from company to company and the kind of project is going to perform(Armenia,Dangelico, Nonino and et.al, 2019).Being a part of project they must have s start and end and have a timeline. This life cycle furnishes the plan of action which has to be execute in the project. This includes the four stages : initiation, planning, execution and closure. Wit the regards of Cromwell tools, the stages are been discussed below- Project initiation This is an initial stage of project life cycle which refers to the perception, idea and thoughts to fix the goals. A company will evaluate their requirements and needs in order to initiate plans for the growth of business. An employees will assemble, coordinate with each other, discuss and then make a plan & policies. In the context of Cromwell tool's company they have to set their objectives and provide a canteen facilities in premises in order to accomplish the goals. Project planning This stage involves the planning and plotting of the project to achieve the goals. Basically in this the framework has been made. This includes the budget, risk, timeline and resources related to the project. The Cromwell tool's project required a 12
budget of approx $500000 in order to render the healthy lifestyle and food & also to build a canteen. This project also involves the risk as if employees would not like to spend the time in the canteen. At this stage the six sigma and lean principles can help. As a result the organization can manage the ideas and plans through their timeline, cost effective, reducing wastage and improve efficiency. Project execution After setting all the plans now its time to implement the plan. This plan can be execute by gathering all the resources and risk factors along with eliminating the spare elements which has negative impact to attain the objective. The company should maintain the standard of quality while providing the canteen facility. And the managers of the company should not delay in the execution of this project before the situations become worse. The head of the project must keep an eye on the progress of the project according to the timeline. They should manage the quality, coordinate with all employees and mitigate the risk in order to avoid the chances of the failures(Wuni and Shen, 2020). Project closure This is the last stage of the project life cycle where the project comes to an end and the owner's are being responsible for the risk and the losses. In this the project will be end through settle down the investors, shareholders and at last prepare the closing report. The Cromwell company wants a positive result through this project by achieving their aim, that is reducing the staff absenteeism. At the closing of the task or project the employees must be satisfied. Thus it will depicts that the company's employees are capable to work on other projects in further. Building a case Executive summaryThis project considers the objective of Cromwell tool's company is to reduce the employees absenteeism and help them to lead a healthy life. To develop a CSR practices for which they are providing a healthy food in the premises only. Thus this will help to create the strategy in order to reduce thecongestion issues in their society. VisionA company's vision is to do a project planning and made a 13
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
framework which includes the canteen facility for the staff. To create a positive impact on the society by reducing their issues and employees well being is their main vision. MissionTheir mission is to engage the employees in the premises. They want to develop a CSR activities which results as to not harm the society. This can be done by operational process, making good relationwithsocietyandemployees(ChaandMaytorena- Sanchez,2019). ObjectivesTheir objective is to reduce the movement of staff and employees absenteeism. Also helps to lead them healthy life style which can be adopt as a part of CSR activity. StrategiesToachievethisobjectivethecompanyhasmaderequired strategies.It includes the reduction in lunch timing and provide a better placer to the employees for lunch in premises. Also to provide a quality food and to create relation with employees. innovationThey have an innovative idea which includes the utilization of technology that is providing the smart watch to the employees. As this will show the exact timing spend by the employee during lunch and it will get beep when the time of lunch gets end. Additionally, the food prepared and served using the technology, as their order process will be show on their watches and this will maintain the interest of the employees too. OpportunityThe Cromwell company has an opportunity to adopt the software, cloud computing and artificial intelligence in order to remain connected with employees necessity and requirements. ImprovementThefeedbackfromtheemployeescanhelpthecompanyto improve the decisions. A Cromwell company has to emphasize on the quality of the food they are providing to detect any additional requirement. 14
Resources requiredThe company required the resource's for implementation of this project. It includes the kitchen equipments, site, material and food processor. To produce the organic and healthy food thegood quality of food material is required. Work break down structure It is a structure in which the work is divided in accordance with the requirement of project and associated with the project timeline. This will help in accomplishing the objectives before deadlines. Proper guidance and leadership is required in order to carry out the activities. The Cromwell company uses this to guide their employees for carrying out the task. It helps to avoid the confusions, conflicts and the target will be achieved successfully. This will help their employees to know what task they have to perform and in what duration. And also assist the employees to stick towards their goals(Jin, Zhong, Ma and et. Al, 2019). Gantt chart 15
Analysis of the project methodologies and tools used To evaluate the method of projects, objectives and for the progress of project the project life cycle is necessary. It helps in the smooth functioning. The project life cycle stages have their own importance in the project. This method helps to analyze the techniques, ideas and the risk involved in the project. This is useful for collecting the resources, guiding the employees and make a plan to attain the objective effectively. A Cromwell company requires the project manager to make a project plan for achieving their objective in order to solve their issues. In order to check and control the performances of an employees the company can adopt technologies, software and gadgets. Review and critically evaluate the effectiveness of the PLC in application to your project using the appropriate theories models and concepts An important document which includes the planning, initiation, execution and closure of a project is a framework of project life cycle. This plays a major role in setting the objective, idea and thoughts regarding the organization's project which helps in providing a path to the employees for completing the project. This is an effective way to analyze the scope, risk and mistakes in the process of project. A crom well tools company desire to have a success in their business and resolve theircongestion issues by declining the absenteeism of staff and providing a canteen facility. By considering the waterfall techniques of project management helps them to deal with the current scenario. Additionally, they can also implement six sigma principle which will help them in innovation and modification(Favi, Germani, Campi and et. Al, 2018). CONCLUSION It is concluded that the project management plays an important role to perform a particular task. It is a constant development plans made through considering the six sigma principles and the lean method. This depicts that the plan is being tracked with the actual 16
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
performance and also helps to perform the required changes in the organization. The PLC helps to complete the task within the deadline and according to the timeline.It helps the company in reduction of the employees absenteeism and enhance the productivity. 17
References Armenia, S., Dangelico, R.M., Nonino, F. and Pompei, A., 2019. Sustainable project management: A conceptualization-oriented review and a framework proposal for future studies.Sustainability,11(9), p.2664. Wuni, I.Y. and Shen, G.Q., 2020. Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle.Engineering, Construction and Architectural Management,27(9), pp.2315-2333. Cha, J. and Maytorena-Sanchez, E., 2019. Prioritising project management competences across the software project life cycle.International Journal of Managing Projects in Business. Jin, R., Zhong, B., Ma, L., Hashemi, A. and Ding, L., 2019. Integrating BIM with building performanceanalysisinprojectlife-cycle.AutomationinConstruction,106, p.102861 Favi, C., Germani, M., Campi, F., Mandolini, M., Manieri, S., Marconi, M. and Vita, A., 2018. Life cycle model and metrics in shipbuilding: how to use them in the preliminary design phases.Procedia CIRP,69, pp.523-528. 18