Operations and Project Management for Unilever: A Continuous Improvement Plan
Verified
Added on 2023/06/10
|15
|4578
|412
AI Summary
This report evaluates the operations management of Unilever, outlines continuous improvement as a philosophy and elaborates lean principles. It also includes a continuous improvement plan with recommendations for enhancement. The second part of the report focuses on a case study of MG Motor Ltd and its project life cycle.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Operations and Project Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents INTRODUCTION...........................................................................................................................3 PART-1............................................................................................................................................3 About the organisation...........................................................................................................3 Operations and operations management.................................................................................3 Implementation of operations management principles...........................................................4 Assess the extent to which operations management principles within the business..............5 Outline continuous improvement as a philosophy and elaborate lean principles..................6 A continuous improvement plan, with recommendations for enhancement..........................7 PART-2............................................................................................................................................8 Project Title............................................................................................................................8 About the case study...............................................................................................................8 Analyse the project methodologies and tools used...............................................................12 Critique the effectiveness of the PLC...................................................................................12 CONCLUSION..............................................................................................................................13 REFERENCES..............................................................................................................................15 Books and Journals:..............................................................................................................15
INTRODUCTION Operations management can be understood as the field of business concerned with the management of organisational practices to advance the business efficiency. It encompasses elements such as planning, organising and managing the business processes to balance costs and profits and realise the highest possible operating profits. The operations managers aims to make sure that the organisation transforms inputs such as materials, human resources and technology into outputs efficiently(Abakumova, Lyubanenko and Vazhenina, 2021). The following report is based upon Unilever Organisation. This report will evaluate the operations management of the company. It will discuss the aspects that how operation is different from operations management. It will also review the implementation of principles of operations management within the business. It will analyse the extent to which operations management matches the requirements of business. Also, this report will shed lights on the philosophy of continuous improvement and lean principles. Lastly, a continuous improvement plan is done as a part of this report. The next portion of report outlines with the project management as it leads to success of a business. A project life cycle with its various phases are being evaluated as a part of this report. Effectiveness of PLC and different concepts and models that aid to finish the project efficaciously are covered in this report. PART-1 About the organisation. Unilever Plc is a British global consumer goods organisation, with headquarters in London,UnitedKingdom.Itsgoodscoversfood,mineralsandsupplements,well-being vitamins, ice crème, condiments, coffee, breakfast cereals, air and water purifiers, toothpaste, pet food, personal care and beauty products. This organisation is famous for producing soap in the world. This is available in approx. 190 countries. It has own more than 400 brands such as Lipton, Magnum, Knorr, Hellmann's, Sunsilk, Lifebuoy and much more. Operations and operations management. Operations can be defined as the organisational activities that a business engages itself into covert materials into final goods and services, sell them to consumers and generate a revenue(Boamah, Zhang and Miah,2021). Every business operations are slightly vary from company to company. Operational functions relates with the activities that what an organisation
does on regular basis. It is essential for an organisation that they should comprehend the optimisation in the daily activities as it aids in attaining objectives and goals and making enough profits as well. With an intent to increase the productivity, it is significant for Unilever that it should oversee their operations effectively efficaciously so that they able to realise the aims. Operation management deals as a process of managing of the operations of business. OperationsOperations Management Operationsrelateswithregular activitieswhichisessentialtobe performed by the Unilever to generate profits. For example; the chosen organisation sells consumers products and services to the customers. It deals as the process of management in which the company necessitate to tackle their regular dealings so that they can earn more amount of profits. Forinstance,theorganisationis producingconsumerproductsand services such as soap so they require to make a choice in respect of managing operational activities. Implementation of operations management principles. Unileverisamultinationalconsumerbrandsotheiroperationsmanagementis accountable for generating higher productivity. They are maintaining high quality throughout the world where their functional domains are exist. Operations managers of the chosen organisation are developing process and procedure in such a manner so that they can aid business to attain higher performances(Bondarenko and et.al., 2021). For that aim, they always consider ten most vital choices which helps in achieving objectives and goals. It is referred that operational performance of chosen organisation straightaway supports the fiscal performance as they can make profits and incomes. Hence, this is the reason operation management of Unilever considers their ten most essential strategic choices. These ten strategic choices are covering designing of productsand services,locationstrategy,procedureaswellascapacitydesigning,layout designing, job designing, SCM, maintenance, planning, quality management and inventory management. Strengths of operations management process of Unilever:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
The process of operations management is very effective with an aim to attain the workers' productivity as operations manager of Unilever are good to communicate the vision and purpose of business. Downside of operations management process of Unilever: If the organisation will not concern about the quality of goods and services then, they might face certain issues and difficulties in respect of employee's satisfaction. It is found that the chosen company is utilising some significant theories and approaches to maintain the high productivity. These theories are as follows: Scientific management theory by Taylor: Some of the essential principles that are offered by Taylor are exploited by Unilever are as follows: Science, not rule of thumb:It is considered that the business shouldn't finish on an already present techniques. They should identify new solutions of performing task. It aids in quicker, easier and smarter working(Gerhardt, 2020). This principle supports in knowing the innovative ways of working in Unilever as it may support in attaining success. Harmony, not discord:It is essential to signify that workers require positive work surroundings where they can do task in an effective way. So, in chosen organisation to uphold harmony in company so that all workers can work efficaciously without any disruption. Cooperation, not individualism:All the workers should locomote the principle of cooperation. The workers cooperate and work mutually and comprehend each other strengths in Unilever. It is observed that if workers do not work mutually in the organisation can never able to attain individual objectives and organisational objectives. Development of each and every person:It is essential to signify that business should work effectively so that there is whole evolution of employees. In chosen organisation, the workers and labour are taken at extreme attention. Employees are offered with adequate training and development so that they are able to attain objectives and targets Assess the extent to which operations management principles within the business. An organisation must utilise all the principles of operations management as they aid in accomplishing organisational objectives and goals effectively. It is found that Unilever is a larger
producing company in consumer goods and services. So, the business necessitates to work effectively by taking all the aspects such as customer's needs and preferences in mind. The following are principles that supports the respective organisation to attain this objectives: It is found that Unilever concentrates on keeping high quality in their products. It helps in attracting more number of customers if they offer at reduced costs. Also, they work in such a way that they are competent to attain economies of scale and limits the costs to provide the customers in an effective manner. At the same time, Unilever concentrates on quality goods and services to be offered to the customers. For such cause, they take care on inputs used in the production system as they should fit in the quality standards(Grigorov, Balzer and Breit, 2019). It helps in attaining the great satisfaction from customers. Outline continuous improvement as a philosophy and elaborate lean principles. Continuousimprovementrefersasanongoingprocessthatpaysattentiononthe evolution of the quality of goods and services on daily basis. It aids Unilever to improve and increasetheirsalesofgoodsandservicesbyexploitingtheprinciplesofcontinuous improvement. This improves the business performance as a whole and the company is able to attain success. Lean principles: All lean principles aims to restrict the wastage and reduce the production costs for the purpose to fulfil the needs and demands of customers. In context of Unilever, the principles are as follows: Value defining:Unilever deals with the things that adds value to the customers in respect of their money invested into the goods. They learn current trends of market and give the commodites with added high value to the consumers. Mapping of value stream:It aims to map out the factors and pints that improves the customers' value. In addition to Unilever, they reduce the stages that don't give worth to the customers. Creating flow:The material, resources and labour are fitted and organised in such a way that they work to attain the aims and objectives of business(Helmold,2019). The workers are provided with proper training so that are efficient to work efficaciously.
Pullestablishment:Thisprincipleisreliedonmanagingthebusinessinventory. Unilever work effectively that assists in managing the quality of products made by them. Pursuit perfection:The organisation establishes some standards as well as work in such a way to match and align with the clear standards. All the workers and labour of Unilever work in such a way that aids to attain success. Unilever Company is able to uphold quality products and services and realise the success by using those principles. The company also believes in developing value to the customers. Also, the principle of pull establishment is also the reason behind high customer satisfaction. A continuous improvement plan, with recommendations for enhancement. Continuous improvement plan refers as the continuous process that pays attention on ceaseless enhancement of goods provided by the business. It is observed that the chosen company considers that quality can't be preserved in short duration of time(Jackson, 2020). There is a requirement of constant betterment to attain the standards as well as quality of products and services offered by the organisation. In respect of Unilever, the steps or phases of constant transformation are as follows: Plan:It is significant to plan on daily basis. It assists the respective organisation to acknowledge about the modifications in current trends of market and utilise them ton work efficaciously. Do:It is essential to bring small changes in the business as it helps employees to adopt the upcoming changes effectively. Check:This is the next stage of ongoing improvement which aims to monitor the change. The outcome and results must be reviewed regularly. Unilever needs to check the performance regularly. Act:It is necessary to act in such a manner that supports to successfully employ the modifications. Concepts of Operations Management: Kaizen:This is the technique that aims to change for better. It is observed that Unilever must work for ongoing improvement to attain organisational objectives. All the workers and labour are involved in the process. Merit:It helps in strengthening the team work and enhances the style of leadership. Demerit:It needs additional training and development.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
TQM:This principle is used by organisation as it aids in total quality management by the company. This aims to reduce the loss of resources and uphold the quality that satisfies the consumers. Merits:It helps in producing the goods of Unilever at reduced costs that is inexpensive by consumers. Demerits:In case of ineffective leadership, the company is not able to realise its targets and goals. It has been analysed by there are many benefits that a company gets due to ongoing improvement. Unilever is also getting the benefits of achieving targets due to the exploitation of improvement plan. This assists in resolving the issues and upholding the quality and serve the consumers with affordable and best prices(Knapp and Hughs, 2021). This is effective to exploit continuous improvement plan and follow all the phases so that better outcome can be gained. Recommendations: The organisation should be prepared for the change, and motivates employees to adopt changes and work according to the market trends. They should take care of the standards related with the safety. Using six sigma can be beneficial to work in an effective and efficient way. With the right implementation of total quality management, the organisation will be competent to keep the quality, together with offer customers with minimal prices. PART-2 Project Title “Foods for healthy and safe lifestyle” About the case study MG Motor Ltd is a medium term organisation, situated in Birmingham, England. In 2006, the organisation was introduced and announces its auto-mobile services throughout the nation. It produces their auto-mobile goods, motors and cars through China. Hence, the organisation has work in Midland with the 1250 workers on-site. These workers are well experienced with their diverse business roles. These workers are factory labours, operations employees and so forth, and these employees are facing some difficulties due to the cause of harsh on-sites working and surrounding. They face catering problems. In current times, the
organisation is facing difficulties in business operations due the lack of efficiency in employees productivity. As there is no on-site food services to offer healthy and safe lifestyle to workers and restricts the low effectiveness(Leonard and Van Zyl, 2019). For this purpose, there are a lot of phases of PLC which are discussed below: Project life cycle:A projects involves various phases as it needs proper learning, together with execution for its success. The life-cycle of a project is covered with four key stages which need to be opted by an organisation. These phases helps in taking appropriate decisions and identify several shortcomings to undertake the risks appropriately. Stages of PLC: Project initiation:This is the first phase in which the business pays focus on the needs and establishes goals. Project initiation will force business issues as workers will uphold theharmonyandgivetheirsupport.MGMotorLtdbelievesintheemployees' participation in the decision-making process which will be beneficial to make new ideas, develop organisational goals and prepare an effective plan which could help in attaining success. Six sigma supports in upholding the project quality and ongoing enhancement to introduce with fresh ideas calculating actions, controlling activities. ProjectPlanning:Thisphasedealswiththeprojectinitiationcomewithinthe formulating of plan. Planning is important to reach success in managing operations. The vital part of developing project is to assess the concept and goals, get resources, make workers for huge support(Malik, Sarwar and Orr, 2021). MG Motors Ltd, requires to focus on lean principles to limit the absenteeism and offer in-house food cooperation. This planning covers management and execution restrict the wastages, resources, costs and increases efficiency. Project execution:This is identified as the practical phase in PLC, once the project get started, planned after assessing all other key choices, collecting resources, limits the superfluouselementsand createbest strategies. The plan requiresto be executed practically for knowing what difficulties come at the business and how it can restricted. For the respective organisation, to execute the plan effectively, they need to adopt TQM concept in which all phases which goes via quality check and concentrate on offering quality food catering services. This concept will attempt to keep the records of capital and assets exploited to make its more cost trenchant by calculating and following
performance. Hence, project execution must be finished on time to limit redundant work load and workers provided best attempt for working. Project closure:This stage is the endmost stage in PLC that helps company to make choices to close the project by getting success or failure in the project(Mirheli and et.al., 2020). At this phase, the organisation will make sure to check project execution by taking follow-ups and keep check on defects or wastage. Project Plan: 1.Executive Summary:This project is based upon the MG Motors Ltd. Which identified the difficulties in managingemployee's absenteeism which affects the efficiency and profitability. This project plans to evolve tactics and progressive ideas to limit the movement of staff. Vision:To create project of catering food services to the workers which improves involvement while maintaining healthy lifestyle which demonstrating an enactment of CSR initiatives. Mission:To create and offer positive work surroundings which influence employees towards their job. Objectives:To enable staff engagement towards productivity of business. This aims to limit the excess lunch hours and staff absenteeism which evolves negative affect in the society. Strategies:The respective organisation aims to make effective strategies to attaining targets by offering food on-site itself which limits employee movements and doesn't make any issue for the people living in the society. Innovation:To develop technology as well as catering services into site which gives healthy and hygienic good services that also helps in limiting working hours. The innovation is to deliver the leftover food to the needy people in order to promote the CSR responsibilities and creates positive brand image(Pearre and Ribberink, 2019). Opportunities:There are many opportunities roam around the respective organisation in terms of software integration, check on performances and measure get influence by limiting the employees absenteeism. Take reviews and feedback about the food quality. Improvements:By effective decision-making, the business can increase the efficiency and also enhancements are relied on employee participation.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Resources required:It involves material, technology, organic substance, ambience serve healthy and tasty food items. Moreover, to make the project flourished, employees portal and employers support, performance analysis software are the main resources to get success in satisfying the aims. Risks and benefits:It involves the risk of project failure by using extra costs, employee's termination, low performance management and so on. On the other side, it covers the benefits of developing a sense of urgency to finish the work of sites on time, rather wasting it. Cash flow:Cash will be flow from top management and will be spend in suppliers to carry on healthy food production process(Pelliccione, 2021). Business strategy:The organisation will get benefit by society positive effects by offer a healthy lifestyle to employees and labour. On the other side, the business strategy involves investment in catering food services. Work breakdown structure:This is a tool that aims to divide the work as per the project management. In MG Motor's context, the work should be divided as per the employees knowledge and expertise so that it would become simple to know the deep facts and mistakes in projects. Gantt Chart:
Analyse the project methodologies and tools used. It is analysed that project life-cycle is relied on various tools and techniques exploited with an aim to form a plan successful. There are several tools as well as methodologies which encompassgoodnessandrisksandthebusinessrequirestoknoweachofthem.These methodologies are agile, project management tools and project leadership tools. In which agile involves Scrum, Kanban and much more(Schmidt and Hazır, 2019). These are ineffective for this work as it involves self-development and MG Motors does not relied on self-development of workers and require to take actions with the help of effective leadership and managing tools of performance. These covers feedback, software and HR assistance which study the employee performance. PLC aims to cover leadership approach such as authoritarian and divisional leadership in which orders get flow from high level authorities and workers require to follow. Critique the effectiveness of the PLC. Project management is a significant part of the PLC as both are primary documentation for the company which covers all the targets, objectives, vision and mission. Hence, PLC leads a
way towards the growth of business by establishing standards, cooperation and harmony. It is important to analyse all the phase in PLC to manage as well as execute project effectively. Waterfall is suggested for the MG Motors Ltd. to analyse the effectiveness of the project life cycle. Requirement:It covers the elements and aspects to make the project successful. As performance management is relied on on collection of capital, resources and getting the predetermined outcomes with the help of employees. Six sigma is beneficial for project management as it helps in guiding about the enhancement and innovation covers the wastage aspects. Design:The planning phase in PLC pays attention of collection of fiscal and human resources to know where the enhancement needed by giving training and collecting funds. This design covers leadership structure that involves chain of command, work division(Tooranloo and Saghafi, 2019). Development:This phase deals to evolve and execute the entire project properly. TQM methodologyhelpsineffectiveprojectexecutionthatgetflowofperformance management for the respective business. Hence, as an effect of performance management plan, development is essential to check the growth of project. Maintenance:This is the endmost phase of model that aims to improve the maintenance is free and analysis of the task necessarily to be finishedand appropriate decisions will be taken in regard of maintenance. Therefore, KPI are essential to choose to cost friendly equity debts as well as performance assessments. CONCLUSION This report is ended over the value and effectiveness of project life-cycle and most needed phases to make, execute and assess the organisational effectiveness. The report has shown an overview of the operations and operations management. It involves several concepts such as six sigma, TQM, lean principle and many concepts which have been sensed the need of ongoing development. In second part, PLC has included organisation's business case, the project plans as well as execution for accomplishing business objectives and aims.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
REFERENCES Books and Journals: Abakumova, O.A., Lyubanenko, A.V. and Vazhenina, T.M., 2021, November. International EnvironmentalManagementStandardsasaToolofLegalBusinessRegulation. InInternationalScientificandPracticalConferenceOperationsandProject management: strategies and trends(pp. 370-381). Springer, Cham. Boamah, F.A., Zhang, J. and Miah, M.H., 2021. The impact of tacit knowledge sharing on the success of construction companies operations.Journal of Engineering, Design and Technology. Bondarenko, V.A. and et.al., 2021, November. Marketing Management in the Creation of Business Models in the Medical Services Market in the Context of Digitalisation. InInternationalScientificandPracticalConferenceOperationsandProject management: strategies and trends(pp. 363-369). Springer, Cham. Gerhardt, T., 2020. Digital Trends in Education Operations and Marketing. InHandbook of ResearchonInnovationsinTechnologyandMarketingfortheConnected Consumer(pp. 356-373). IGI Global. Grigorov, C., Balzer, W. and Breit, H., 2019. Upgrade of the PAZ SAR Processor, Instrument Operations, SAR Calibration and SAR Verification Software for New Imaging Modes and Software Maintenance for PAZ-Project Management Plan. Helmold, M., 2019. PM in Operations. InProgress in Performance Management(pp. 67-90). Springer, Cham. Jackson, B.J., 2020.Construction management JumpStart: the best first step toward a career in construction management. John Wiley & Sons. Knapp, M. and Hughs, K., 2021. In-space operations. InCubesat Handbook(pp. 365-377). Academic Press. Leonard, A.C. and Van Zyl, D.H., 2019. Social Issues in IT Project Teams. InAdvanced Methodologies and Technologies in Business Operations and Management(pp. 392- 404). IGI Global. Malik, M., Sarwar, S. and Orr, S., 2021. Agile practices and performance: Examining the role of psychologicalempowerment.InternationalJournalofProjectManagement,39(1), pp.10-20. Mirheli,A.andet.al.,2020.Utilizationmanagementofhighwayoperations equipment.Transportation Research Record,2674(9), pp.202-215. Pearre, N.S. and Ribberink, H., 2019. Review of research on V2X technologies, strategies, and operations.Renewable and Sustainable Energy Reviews,105, pp.61-70. Pelliccione, A., 2021. Meet the engineers who are exceeding expectations and improving operations.Control Engineering,68(9), pp.19-26. Schmidt, K.W. and Hazır, Ö., 2019. Formulation and solution of an optimal control problem for industrial project control.Annals of Operations Research,280(1), pp.337-350. Tooranloo, H.S. and Saghafi, S., 2019. Investigating the impact of using knowledge management onorganisationalagilitythroughcompetitiveintelligenceandstrategic thinking.Journal of Information & Knowledge Management,18(02), p.1950016.