Running head:UNINTERRUPTED POWER SUPPLY (UPS) FRAME WORK Uninterrupted Power Supply (UPS) Frame Work Name of the Student Name of the University Author Note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1UNINTERRUPTEDPOWERSUPPLY(UPS)FRAME WORK Table of Contents Introduction......................................................................................................................................2 Daily log of activities.......................................................................................................................2 Daily log of activities achieved on the day......................................................................................3 Outcome...........................................................................................................................................4 Relation to the project......................................................................................................................5 Explanation......................................................................................................................................5 Reflection.........................................................................................................................................5 Conclusion.......................................................................................................................................6 Reference.........................................................................................................................................7
2UNINTERRUPTEDPOWERSUPPLY(UPS)FRAME WORK Introduction The notable determination of the paper is to highlight the bridging theory and practice regarding the creation of an uninterrupted power supply framework in As-Sabuur Nigeria Limited.The application of the different project management theory while creating the framework will be discussed in this paper in a detailed manner. The daily activities of the project will be considered in this paper as well (Lu et al., 2018). The description of the tasks achieved per day will be also examined and analyzed in the paper along with that explanation of the outcome and its relation with the project will be also discussed in the paper as well (Sindhuja & Vasanth, 2015). The paper will also present a reflection part which will be focusing on the lessons learned from this assignment. Daily log of activities The activities of this project will be presented in a tabular form in this section of the paper. ActivityStakeholderWork effort in daysTime in weeks PlanandInitiation phase 3 weeks Developmentofthe plan Project Manager10 Financial plan for the project Project Manager9 Approval of the planHouse Owner2 Completionofthis phase 0 Procurementof equipment 3 weeks Contactingservice provider Project Manager2 Setting technical planProject Manager11
3UNINTERRUPTEDPOWERSUPPLY(UPS)FRAME WORK Purchasing generatorHouse Owner9 Checkingnecessary equipment’s Project Manager8 Completion phase10 Installationof generator 1 weeks Installationofthe generator Project Manager5 Completionofthe installation 0 Project Closure1 week Gainingfeedback from house owner Project Manager1 Signingoff procurement Project Manager2 Makingfinal payment House Owner1 Completion of project closure 0 Table 1: Activities of this project (Source: Created by the author) Daily log of activities achieved on the day This unit of the paper will be presenting the activities of this project along with the activities which has been achieved per day. DateName of the activityDuration (in days)Achieved per day 28.02.2019- 13.09.2019 Initialplan development 1080% 14.02.2019- 26.03.2019 Preparationof financial plan 970% 27.03.2019- 28.03.2019 Approval of plan280% 28.03.2019- 28.03.2019 Completionofthe phase 0100% 29.03.2019- 01.04.2019 Contactingservice provider 295% 02.04.2019-Setting technical plan1195%
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4UNINTERRUPTEDPOWERSUPPLY(UPS)FRAME WORK 16.04.2019 17.04.2019- 18.04.2019 Purchasingthe generator 280% 19.04.2018- 23.04.2019 Checkingnecessary equipment’s 495% 18.04.2019Completionofthe phase 1100% 19.04.2018- 25.04.2019 Installationofthe generator 680% 25.04.2019- 25.04.2019 Completionofthe installation 095% 26.04.2019- 26.04.2019 Gainingfeedback from house owner 095% 29.04.2019- 30.04.2019 Sign procurement295% 01.05.2019- 01.05.2019 Making payment195% 01.05.2019- 01.05.2019 Completion of project closure 0100% Table 2: Daily log of activities achieved on time as stated in the table (Source: Created by the author) Outcome The above tabular diagram is very much important to understand the time taken for each of the activities of this project (Ryu et al., 2018). The achievement of each of the activities are dependent on each other thus it can be said that the overall completion of the project will depend entirely on the completion of each of the phases. Each of the activities of the project helps in understanding that the rate of achieving per day for each of the activities are dependent on the numerous parameters such as the availability of the resources (Keiel et al., 2017). The closure phase of each of the activities must be completed within the time scheduled in order to minimize the extra overhear cost associated with the creation of this UPS framework.
5UNINTERRUPTEDPOWERSUPPLY(UPS)FRAME WORK Relation to the project The creation of the UPS framework for As-Sabuur Nigeria Limited Explanation is based on different project management phases such as the Initiation Phase, Planning phase, execution phase and closure phases these phases of the project are maintained for each of the activities of this project as stated in the above tables (Shi et al., 2017). Successful completion of each of the activities in this project depended on the following of the different phases of the project. Explanation The creation of this framework for As-Sabuur Nigeria Limited had four milestones, and project management methodology were selected in each of the phases of this project. Like every othercomplexprojectthisprojectalsohasseriouslimitationssuchasthescope,cost management and quality management (Hou et al., 2018). These limitations are very much important to be considered during this project as there are lots of stakeholders involved in this project in terms of the service providers and the project managers. The project has to be completed with 8 weeks thus the efficiency and productivity of all the associated stakeholders are important to deal with the uncertainties of the project. The role of the stakeholders is very much important regarding the completion of each of the milestones of this project (Alanazi et al., 2016). The needs and requirements of the consumers of this organization has to be given the primary importance in each phase of the project so that the quality of service offered by the new UPS framework is not compromised under any circumstances. Reflection According to me, the prime concerns of this project are the cost management of the project, time management of the project and the scope management of the project. I believe that
6UNINTERRUPTEDPOWERSUPPLY(UPS)FRAME WORK the availability of the resources required in this project such as the laborers and the logistics is also a concern and the project scheduling technique can be very much important to understand the role of each of the stakeholders involved in this project. I believe that each of the milestones of this project must be completed on the time so that there is no delay in providing the product which the consumers are looking for, in this organization. Conclusion The paper helps in understanding the importance of each of the phases of project management such as the initiation phase, planning, execution and closure phase. The importance of project scheduling regarding the successful completion of the project on time can be also concluded from the paper as well. The paper help in understanding progress from the point of view of the daily activities for each of the stakeholders so that the efficiency and productivity of the framework is achieved for the consumers of As-Sabuur Nigeria Limited.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7UNINTERRUPTEDPOWERSUPPLY(UPS)FRAME WORK Reference Alanazi, S., Dabbagh, M., Hamdaoui, B., Guizani, M., & Zorba, N. (2016, December). Joint Resource Scheduling and Peak Power Shaving for Cloud Data Centers with Distributed Uninterruptible Power Supply. In2016 IEEE Globecom Workshops (GC Wkshps)(pp. 1- 6). IEEE. Hou, X., Hao, L., Li, C., Chen, Q., Zheng, W., & Guo, M. (2018, October). Power Grab in Aggressively Provisioned Data Centers: What is the Risk and What Can Be Done About It. In2018 IEEE 36th International Conference on Computer Design (ICCD)(pp. 26-34). IEEE. Keiel, G., Flores, J. V., Pereira, L. F., & Salton, A. T. (2017). Discrete-time multiple resonant controller design for uninterruptible power supplies.IFAC-PapersOnLine,50(1), 6717- 6722. Lu, J., Savaghebi, M., Guan, Y., Golestan, S., Vasquez, J. C., Guerrero, J. M., & Marzabal, A. (2018). Dc-link protection and control in modular uninterruptible power supply.IEEE Transactions on Industrial Electronics,65(5), 3942-3953. Ryu, Y. S., Jeon, W. G., Song, B. C., Park, J. H., & Kwon, K. W. (2017). Design of Open Framework Based Smart ESS Profile for PV-ESS and UPS-ESS.World Academy of Science, Engineering and Technology, International Journal of Electrical, Computer, Energetic, Electronic and Communication Engineering,11(3), 267-270. Shi, K., Wang, X., Dong, D., Hu, C., & Xu, D. (2017, June). Unified control scheme design for both the PWM rectifier and the inverter in the uninterruptible power supply (UPS)
8UNINTERRUPTEDPOWERSUPPLY(UPS)FRAME WORK system. In2017 IEEE 3rd International Future Energy Electronics Conference and ECCE Asia (IFEEC 2017-ECCE Asia)(pp. 1462-1467). IEEE. Sindhuja, S., & Vasanth, K. (2015, December). Modified coulomb counting method of SOC estimation for uninterruptible power supply system's battery management system. In 2015InternationalConferenceonControl,Instrumentation,Communicationand Computational Technologies (ICCICCT)(pp. 197-203). IEEE.